Presentation is loading. Please wait.

Presentation is loading. Please wait.

Value of contract: Length of contract: Contract start date:

Similar presentations


Presentation on theme: "Value of contract: Length of contract: Contract start date:"— Presentation transcript:

1 2K Polymer Systems, Alfreton New build office block & conversion of factory loading dock
Value of contract: Length of contract: Contract start date: Completion date: £585,000 6 months April 2016 September 2016 Works/services provided: Piled foundations and concrete ring beam HVAC systems Erection of Portal steel frame Energy efficient electrical installation Ground bearing and metal deck floor slabs Internal fit out and finishes Composite cladding to roof & elevations External access ramps, landings and landscaping Aluminium door & windows systems Detailed description of contract: Administered through a JCT Intermediate for of Design & Build Contract. Demolition of a light goods vehicle loading bay in the existing factory. Installation of structural floors, walls and ceilings to form an independent office suite. New build construction of stand-alone office block for managerial, clerical & technical staff that includes; reception, open plan offices, meeting rooms, laboratory & welfare facilities. Particular challenges to be overcome: Contact details: Organising the site to maintain safe access to the existing factory without hindering the clients busy operation Applying strict controls to manage construction works within a live manufacturing facility – construction resins & sealants Developing the design, during the construction phase, to accommodate the clients changes to specification Nimesh Patel - Managing Director 2K Polymer Systems Limited Venture Crescent Alfreton Derbyshire. DE55 7RA Tel:


Download ppt "Value of contract: Length of contract: Contract start date:"

Similar presentations


Ads by Google