WG11 Snapshot July ‘11 Date: 18 -July-2011 Authors: Name Company

Similar presentations


Presentation on theme: "WG11 Snapshot July ‘11 Date: 18 -July-2011 Authors: Name Company"— Presentation transcript:

1 WG11 Snapshot July ‘11 Date: 18 -July-2011 Authors: Name Company
doc.: IEEE /0829r1 July 2011 WG11 Snapshot July ‘11 Date: 18 -July-2011 Authors: Name Company Address Phone Bruce Kraemer Marvell 5488 Marvell Ln Santa Clara, CA 95054 +1 - 321 4 27 4098 marvell .com Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

2 PAR Expiration/Renewal Schedule
July 2011 PAR Expiration/Renewal Schedule Project PAR Expiration Date MB 31-DEC-2011 S Revision 31-DEC-2012 AA AC AD AE 31-DEC-2013 AF AH 31-DEC-2014 AI Bruce Kraemer (Marvell)

3 July 2011 Officers Bruce Kraemer (Marvell)

4 WG11 Task & Study Group Officers – July 2011
doc.: IEEE /0829r1 July 2011 WG11 Task & Study Group Officers – July 2011 Cat Group Chair Vice Chair Technical Editor Secretary WG WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG Mb Dorothy Stanley Michael Montemurro S Dee Denteneer Guido Hiertz Kazuyuki Sakoda Guenael Strutt AA Ganesh Venkatesan Alex Ashley AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim Robert Stacey David Yang AD Eldad Perahia Chris Hansen, James Yee Carlos Cordeiro -OPEN- AE Henry Ptasinski Matthew Fischer AF Richard Kennedy Zhou Lan AH Dave Halasz Yongho Seok Minyoung Park AI Hiroshi Mano Marc Emmelmann Tom Siep Hitoshi Morioka SC WNG Clint Chaplin Ad hoc ARC Dave Bagby Mark Hamilton JTC1 Andrew Myles REG SG Bruce Kraemer (Marvell) NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open Bruce Kraemer (Marvell)

5 WG11 Task & Study Group Officers – July 2011 adj
doc.: IEEE /0829r1 July 2011 WG11 Task & Study Group Officers – July 2011 adj Cat Group Chair Vice Chair Technical Editor Secretary WG WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG Mb Dorothy Stanley Michael Montemurro S Dee Denteneer Guido Hiertz Kazuyuki Sakoda Guenael Strutt AA Ganesh Venkatesan Alex Ashley AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim Robert Stacey David Yang AD Eldad Perahia Chris Hansen, James Yee Carlos Cordeiro -OPEN- AE Henry Ptasinski Matthew Fischer AF Richard Kennedy Zhou Lan AH Dave Halasz Yongho Seok Minyoung Park AI Hiroshi Mano Marc Emmelmann Tom Siep Hitoshi Morioka SC WNG Clint Chaplin Ad hoc ARC Dave Bagby Mark Hamilton JTC1 Andrew Myles REG SG Bruce Kraemer (Marvell) NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open Bruce Kraemer (Marvell)

6 July 2011 Status Reports Bruce Kraemer (Marvell)

7 Current Membership Status
July 2011 doc.: IEEE /0829r1 July 2011 Current Membership Status Status Number Aspirant 117 Potential Voter 57 Voter 302 Definitions: Aspirant: a member who has attended 1 qualifying meeting Potential Voter: a member who has attended 2 qualifying meetings and will become a voter at the start of the next plenary they attend Data as of Bruce Kraemer (Marvell) Bruce Kraemer, Marvell

8 IEEE 802.11 Standards Pipeline
May 2011 doc.: IEEE /0483r0 May 2011 IEEE Standards Pipeline 802.11z TDLS 802.11s Mesh MAC 802.11r Fast Roam e QoS 802.11u WIEN h DFS & TPC 802.11k RRM 802.11aa Video Transport i Security 802.11ai FILS 802.11V Network Management 802.11Y Contention Based Protocol f Inter AP 802.11ae QoS Mgmt Frm Smart Grid j JP bands 802.11mb Revision 802.11p WAVE WNG g 54 Mbps 2.4GHz ah 802.11n High Throughput (>100 Mbps) 802.11af TVWS b 11Mbps 2.4 GHz 802.11ac VHT 5GHz 802.11W Management Frame Security a 54 Mbps 5GHz 802.11ad VHT 60GHz d PHY (’99) 2.4GHz Published Amendment Discussion Topics Study groups TG without draft WG Letter Ballot Sponsor Ballot Published Standard Slide 8 Bruce Kraemer (Marvell) Page 8 Bruce Kraemer (Marvell)

9 IEEE 802.11 Revisions May 2011 Revision 802.11mb May 2011
doc.: IEEE /0483r0 May 2011 IEEE Revisions 802.11z TDLS 802.11ai FILS 802.11s Mesh MAC 802.11 -2003 e QoS 802.11 -2007 802.11 -2012 802.11 -1999 802.11r Fast Roam 802.11e QoS Mgt Frames 802.11u WIEN h DFS & TPC 802.11k RRM 802.11aa Video Transport i Security 802.11V Network Management 802.11aa Video Transport f Inter AP 802.11Y Contention Based Protocol d Intl roaming j JP bands 802.11aaf TV Whitespace 802.11p WAVE 802.11ac Very High Throughput 5GHz a 54 Mbps 5GHz 802.11n High Throughput (>100 Mbps) b 11 Mbps 2.4GHz g 54 Mbps 2.4GHz 802.11ad Very High Throughput 60GHz 802.11W Management Frame Security 802.11ah <1GHz PHY Slide 9 Page 9 Bruce Kraemer (Marvell)

10 WG11 Editor Abstract / Agenda – July 2011
March 2010 doc.: IEEE /0829r1 May 2011 WG11 Editor Abstract / Agenda – July 2011 Roll Call / Contacts / Reflector Go round table and get brief status report ANA Status / Process / What is administered Mandatory Editorial Coordination before SB Numbering Alignment process / Spreadsheet Amendment Ordering / Draft Snapshots Style Guide for MIB style and Frame practices (FrameMaker 10.0) Slide 10 Bruce Kraemer (Marvell) Page 10 Bruce Kraemer (Marvell) Terry Cole (AMD)

11 WNG SC – July 2011 Review of objectives
May 2008 WNG SC – July 2011 Review of objectives Advanced Clear Channel Assessment (CCA) &/or Specific Transmit Power Control (TPC) () – Lawrence Zuckerman Channel Contention with a Large Number of Devices ( wng-channel-contention-with-a-large-number-of-devices.ppt) – Ed Reuss Train Control Radio () – Jia-Ru Lee Page 11

12 IEEE 802.11 ARC SC – July 2011 802.11 ARC SC meets “as needed”
May 2008 doc.: IEEE /0547r0 doc.: IEEE /0829r1 July 2011 IEEE ARC SC – July 2011 ARC SC meets “as needed” Dave Bagby not here – Mark Hamilton will lead Ongoing Topic is Architecture revision 802.1 architecture document revision effort Brief update given in May Plenary Concerted effort to complete comment resolutions and got to ballot in July Two 802 group sessions + One ARC session slot in July Slide 12 Bruce Kraemer (Marvell) Page 12 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

13 May 2008 Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0547r0 July 2011 TGmb - July 2011 Recirculation Sponsor Ballot on Draft 9.0 closed 22 June Pool 186, 139 affirmative – 93%, 11 Disapprove – 7%, 10 Abstain – 6% 208 comments This meeting Comment resolution, note: Revisit timelines, expect recirculation ballot on D10.0 to begin in mid August, after 11s roll-in Agenda in Slide 13 Bruce Kraemer (Marvell) Page 13 John Doe, Some Company Bruce Kraemer (Marvell)

14 IEEE 802.11s Mesh Networking - July
November 2009 September 2009 doc.: IEEE /0547r0 doc.: IEEE /0829r1 July 2011 IEEE s Mesh Networking - July TGs Draft 12.0 passed the 5th Recirculation Sponsor Ballot (closing May) with 97.2 % % approval and 1 comment indicating that the draft meets all editorial requirements After the letter ballot, two of the Disapprove voters indicated that they would like to change their vote to Approve, bringing the approval rate up to 98.6%. The remaining two Disapprove voters each indicated dissatisfaction with the resolution of one of their comments In this meeting we will prepare the report for unconditional approval for the EC and the press release Slide 14 Bruce Kraemer (Marvell) Page 14 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

15 IEEE 802.11aa – July - San Francisco, CA
May 2008 doc.: IEEE /0829r1 Jan 2011 IEEE aa – July - San Francisco, CA Goals: Resolve 4th recirculation (LB179) comments and approve corresponding resolutions Resolve comments from IEEE-SA MEC and approve corresponding comment resolutions Start recirculation letter ballot on Draft 6.0 Joint Meeting with 802.1AVB Submit deliverables for “conditional approval to go to sponsor ballot” to the EC and get EC Approval Opening report in document 11/0852r0 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

16 IEEE 802.11ac – July 2011 Narrowly failed WG Letter Ballot 74%-26%.
November 2010 doc.: IEEE /0829r1 July 2011 IEEE ac – July 2011 Narrowly failed WG Letter Ballot 74%-26%. About 1500 comments are received, evenly divided between technical and editorial comments. Focus is on resolving LB 178 comments. Technical Submissions. Agenda in document 11-11/0922r0. Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

17 TGad – July Meeting Goals
Finish comment resolution on D3.0 Approve D4.0

18 Month Year doc.: IEEE /0829r1 Month Year TGae July 2011 Summary Complete LB 180 Comment Resolution and approve recirculation LB Received 77 comments (52 technical, 25 Editorial) Request Conditional Sponsor Ballot Approval Prepare SB Approval package and forward to EC Revise plan of record. John Doe, Some Company John Doe, Some Company

19 TGaf – Meeting Goals July 2011
Approve meeting and teleconference minutes Review the results of LB171 Approve the LB171 comment spreadsheet in 11-11/277r12 Approve speculative draft D1.02 Review the progress since May Discuss the challenges and opportunities related to incorporating the TGac PHY Comment resolution Plan for September meeting, ad hoc and teleconferences Slide 19

20 Timeline review & Teleconference schedule
Month Year doc.: IEEE /0829r1 July 2011 IEEE ah Snapshot - July Primary focus Make progress on channel model document Continue work on, Requirements document Specification framework document Timeline review & Teleconference schedule David Halasz, OakTree Wireless David Halasz, Aclara

21 IEEE 802.11ai (FILS) – San Francisco , July 2011
May 2008 doc.: IEEE /0829r1 March 2011 IEEE ai (FILS) – San Francisco , July 2011 Goals for the Meeting: Review and Approve the Palm Springs and Teleconference meeting minutes Presentation of submissions Discussion and approve Evaluation methodology Submission of Initial technical contribution General submission TIME line of task group Plan for Sep & Teleconference Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

22 May 2008 doc.: IEEE /0829r1 July 2011 IEEE JTC1 ad hoc – July 2011 The agenda items that will be addressed this week are: Review results of SC6 meeting in San Diego in June 2011 Review status of SC6/WG1 projects of interest to 802 Progress of WAPI NP Progress of 802.1X/AE (Tue) and security (Wed) replacement projects Progress of ac replacement projects Discuss 802 position on submission of 802 standards to ISO/IEC (Mon) Should existing 8802 standards be obsoleted? (position req. by Feb 12) Should 802 WGs’s submit standards to ISO/IEC in future? Should submit ? Should we summit to ISO/IEC using the PSDO agreement? Prepare for teleconference in August on WAPI NP proposal There is a special JTC1 meeting during Mon PM2 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

23 Regulatory Ad Hoc Committee Meeting Goals July 2011
The regulatory summaries Regulatory issues status FCC open issues EN revision update; ERM vote FCC 5 GHz rules changes update Critical issues actions

24 Tuesday pm1 & Thursday am1 Revision NIST Smart Grid PAP#2 Report plan.
July 2011 doc.: IEEE /0829r1 July 2011 Smart Grid – July 2011 Tuesday pm1 & Thursday am1 Revision NIST Smart Grid PAP#2 Report plan. Australian Smart Metering RFI UK Consultation Update of activities in P2030 Open SG ITU Focus Group ITU-R paper IEEE Vision Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

25 July 2011 Recent Ballots Bruce Kraemer (Marvell)

26 Recent Ballot History Year Inter meeting Period Ballots Completed WG
July 2011 Recent Ballot History Year Inter meeting Period Ballots Completed WG Sponsor 2010 July - Sept 2 7 Sept - Nov 4 2010/2011 Nov - Jan 1 3 2011 Jan - Mar Mar - May May - July Bruce Kraemer (Marvell)

27 July 2011 P802.11ad – D WG LB 177 Ballot #177 was the second 15 day Working Group technical recirculation Ballot asking the question "Should P802.11ad D3.0 be forwarded to Sponsor Ballot?". Ballot Opening Date:    Tuesday May 17, 2011 - 23:59 ET Ballot Closing Date:   Wednesday June 01, 2011 - 23:59 ET  278 eligible people are in this ballot group.     188 affirmative votes    16 negative votes     24 abstention votes ===   228 votes received = 82.0% valid returns                                   =  10.5% valid abstentions    APPROVAL RATE: 188  affirmative votes       =   % affirmative   16  total negative votes  =     % negative Motion passes. There were 211 comments received. Bruce Kraemer (Marvell)

28 July 2011 P802.11ac – D WG LB 178 Ballot #178 was a 30 day Working Group technical recirculation Ballot asking the question "Should P802.11ac D1.0 be forwarded to Sponsor Ballot?". Ballot Opening Date: Thursday May 26, :59 ET Ballot Closing Date: Saturday June 25, :59 ET 315 eligible people are in this ballot group. 148 affirmative votes 52 negative votes 16 abstention votes === 216 votes received = 68.6% valid returns = 7.4% valid abstentions APPROVAL RATE: 148 affirmative votes = 74.0 % affirmative 52 total negative votes = 26.0 % negative Motion fails. There were 1795 comments received. Bruce Kraemer (Marvell)

29 July 2011 P802.11aa – D WG LB 179 IEEE WG Letter Ballot #179 was a 15 day recirculation Working Group Technical Ballot asking the question "Should P802.11aa D5.0 be forwarded to Sponsor Ballot?" The Official results follow: Ballot Opening Date: Thursday June 02, :59 ET Ballot Closing Date: Friday June 17, :59 ET 257eligible people are in this ballot group. 142 affirmative votes 15 negative votes 39 abstention votes === 196 votes received = 76.3% valid returns = 19.9% valid abstentions APPROVAL RATE: 142 affirmative votes = 90.4 % affirmative 15 total negative votes = 9.6 % negative Motion passes. There were 132 comments received. Bruce Kraemer (Marvell)

30 July 2011 P802.11ae – D WG LB 180 Ballot #180 was the third 15 day Working Group technical recirculation Ballot asking the question "Should P802.11ae D4.0 be forwarded to Sponsor Ballot?". Ballot Opening Date: Friday June 03, :59 ET Ballot Closing Date: Saturday June 18, :59 ET 278 eligible people are in this ballot group. 180 affirmative votes 8 negative votes 35 abstention votes === 223 votes received = 80.2% valid returns = 15.7% valid abstentions APPROVAL RATE: 180 affirmative votes = 95.7 % affirmative 8 total negative votes = 4.3 % negative Motion passes. There were 77 comments received. Bruce Kraemer (Marvell)

31 P802.11s D12.0 - 5th Sponsor recirc July 2011
The fifth IEEE P802.11s (MESH networking) 15 day recirculation Sponsor Ballot asked the question “Should P802.11s Draft 12.0 be forwarded to RevCom?” The official results for this Sponsor Ballot follow: Ballot Opening Date: Friday May 20, :59 ET Ballot Closing Date: Saturday June 04, :59 ET 184 eligible people are in this ballot group. 141 affirmative votes 4 negative votes with comments 0 negative votes without comments 9 abstention votes ======= 154 votes received = 83.7 % valid returns = 5.8% valid abstentions APPROVAL RATE: 141 affirmative votes = 97.2 % affirmative 4 total negative votes = 2.8 % negative The motion passes. There was 1 comment received indicating that the draft meets all editorial requirements. Bruce Kraemer (Marvell)

32 P802.11Revmb D9.0 – 3rd Sponsor recirc
July 2011 P802.11Revmb D9.0 – 3rd Sponsor recirc The IEEE P802.11REVmb ( roll-up revision) 20 day 3rd recirculation Sponsor Ballot asked the question “Should P802.11REVmb Draft 9.0 be forwarded to RevCom?” The official results for this Sponsor Ballot follow: Ballot Opening Date: Thursday June 02, :59 ET Ballot Closing Date: Wednesday June 22, :59 ET 186 eligible people are in this ballot group. 139 affirmative votes 11 negative votes with comments 0 negative votes without comments 10 abstention votes ======= 160 votes received = 86.0 % valid returns = 6.3% valid abstentions APPROVAL RATE: 139 affirmative votes = 92.7 % affirmative 11 total negative votes = 7.3 % negative The motion passes. There were 208 comments received Bruce Kraemer (Marvell)