Presentation is loading. Please wait.

Presentation is loading. Please wait.

WG11 Opening Report Snapshots March 2013

Similar presentations


Presentation on theme: "WG11 Opening Report Snapshots March 2013"— Presentation transcript:

1 WG11 Opening Report Snapshots March 2013
doc.: IEEE /0167r0 March 2013 WG11 Opening Report Snapshots March 2013 Date: 16 – March -2013 Authors: Name Company Address Phone Bruce Kraemer Marvell 5488 Marvell Ln Santa Clara, CA 95054 +1 - 321 4 27 4098 marvell .com Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

2 Adrian’s Vice Chair report 11-13-0096r2 IEEE Web account 11-13-0250r0
March 2013 Meeting Documents Agenda r1 Snapshots r0 Supplementary r0 Adrian’s Vice Chair report r2 IEEE Web account r0 Jon’s Vice Chair report r0 Treasury report r0 Publicity report r0 Newcomers material r1 Bruce Kraemer (Marvell)

3 PAR Expiration/Renewal Schedule
March 2013 PAR Expiration/Renewal Schedule Project PAR Expiration Date AF 31-DEC-2013 AH 31-DEC-2014 AI AC AJ 31-DEC-2016 AK AQ Plan for Approval of Extension PAR July 2013 Bruce Kraemer (Marvell)

4 March 2013 Activities & Officers Bruce Kraemer (Marvell)

5 Type of Groups Type of Group Description WG Working Group TG
March 2013 Type of Groups Type of Group Description WG Working Group TG Task Group SG Study Group SC Standing Committee Bruce Kraemer (Marvell)

6 802.11 Appointments WG Secretary – Stephen McCann
March 2013 Monday Agenda Item 4.1.2 Appointments WG Secretary – Stephen McCann Treasurer – Jon Rosdahl Publicity – Stephen McCann ANA Authority – Adrian Stephens WG Technical Editors – Adrian Stephens, Peter Ecclesine Bruce Kraemer (Marvell)

7 Groups March 2013 Type Group Description Chair WG11
The IEEE Working Group Bruce Kraemer TG MC Maintenance – Revision “mc” Dorothy Stanley AC Very High Throughput (<6 GHz bands) Osama Aboul-Magd AD Very High Throughput (60 GHz) Eldad Perahia AF Operation in TV Whitespace bands Richard Kennedy AH Operation in 900 MHz bands Dave Halasz AI Fast Initial Link Setup Hiroshi Mano AJ China 60 GHz Xiaoming Peng PAQ Pre-association Discovery Stephen McCann AK General Link Donald Eastlake SC WNG Wireless Next Generation Clint Chaplin ARC Architecture Mark Hamilton JTC1 ISO/IEC/JTC1/SC6 shadow committee Andrew Myles REG Regulatory SG Smart Grid Bruce Kraemer (Marvell)

8 WG11 Task & Study Group Officers – March 2013
doc.: IEEE /0167r0 March 2013 WG11 Task & Study Group Officers – March 2013 Cat Group Chair Vice Chair Technical Editor Secretary WG WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG MC Dorothy Stanley Mark Hamilton, Jon Rosdahl AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim Robert Stacey David Yang AD Eldad Perahia James Yee Carlos Cordeiro -OPEN- AF Richard Kennedy Peter Ecclesine, Zhou Lan Zhou Lan AH Dave Halasz Yongho Seok Minyoung Park Li Chia CHOO AI Hiroshi Mano Marc Emmelmann, Gabor Bajko Lee Armstrong Ping Fang Hitoshi Morioka AJ Xiaoming Peng Eldad Perahia, Haiming Wang NYRQ HAO Peng AK Donald Eastlake ZHUANG Yan AQ Yunsong YANG, Dwight Smith Dan Gal Sue Hares SC WNG Clint Chaplin Jim Lansford ARC Mark Hamilton David Bagby JTC1 Andrew Myles REG NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open NEW Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

9 WG11 Task & Study Group Officers – March 2013- ADJ
doc.: IEEE /0167r0 March 2013 WG11 Task & Study Group Officers – March ADJ Cat Group Chair Vice Chair Technical Editor Secretary WG WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG MC Dorothy Stanley Mark Hamilton, Jon Rosdahl AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim Robert Stacey David Yang AD Eldad Perahia James Yee Carlos Cordeiro -OPEN- AF Richard Kennedy Peter Ecclesine, Zhou Lan Zhou Lan AH Dave Halasz Yongho Seok Minyoung Park Li Chia CHOO AI Hiroshi Mano Marc Emmelmann, Gabor Bajko Lee Armstrong Ping Fang Hitoshi Morioka AJ Xiaoming Peng Eldad Perahia, Haiming Wang NYRQ HAO Peng AK Donald Eastlake ZHUANG Yan AQ Yunsong YANG, Dwight Smith Dan Gal Sue Hares SC WNG Clint Chaplin Jim Lansford ARC Mark Hamilton David Bagby JTC1 Andrew Myles REG NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open NEW Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

10 WG11 Meeting Chairs – March 2013
doc.: IEEE /0167r0 March 2013 WG11 Meeting Chairs – March 2013 Cat Group Meeting Chair WG WG11 Bruce Kraemer TG MC Dorothy Stanley AC Osama Aboul-Magd AD Eldad Perahia AF Richard Kennedy AH Dave Halasz AI Hiroshi Mano AJ AK Donald Eastlake AQ Stephen McCann SC WNG Jim Lansford ARC Mark Hamilton JTC1 Andrew Myles REG Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

11 March 2013 WG11 Status Bruce Kraemer (Marvell)

12 Current Membership Status - January
March 2013 doc.: IEEE /0167r0 March 2013 Current Membership Status - January Status Number Aspirant 87 Potential Voter 31 Voter 324 Definitions: Aspirant: a member who has attended 1 qualifying meeting Potential Voter: a member who has attended 2 qualifying meetings and will become a voter at the start of the next plenary they attend Data as of Bruce Kraemer (Marvell) Adrian Stephens, Intel Corporation

13 Recent voting member history
March 2013 doc.: IEEE /0167r0 March 2013 Recent voting member history Bruce Kraemer (Marvell) Adrian Stephens, Intel Corporation

14 IEEE 802.11 Standards Pipeline
May 2011 doc.: IEEE /0483r0 March 2013 IEEE Standards Pipeline MAC GLK 802.11AK PAD 802.11AQ 802.11aa Video Transport 802.11ai FILS Smart Grid 802.11ae QoS Mgt Frames WNG ah 802.11af TVWS 802.11aj 802.11ac VHT 5GHz 802.11ad VHT 60 GHz PHY Discussion Topics Study groups TG without Approved draft WG Letter Ballot Sponsor Ballot Published Amendment Published Standard Slide 14 Bruce Kraemer (Marvell) Page 14 Bruce Kraemer (Marvell)

15 IEEE 802.11 Revisions March 2013 802.11 -2012 May 2011
doc.: IEEE /0483r0 March 2013 IEEE Revisions 802.11ai FILS 802.11z TDLS 802.11s Mesh MAC e QoS 802.11ae QoS Mgt Frames 802.11 -2003 802.11 -2007 802.11 -2012 802.11 -1999 h DFS & TPC 802.11r Fast Roam 802.11u WIEN 802.11aa Video Transport i Security 802.11k RRM 802.11ak GlobalLink 802.11V Network Management f Inter AP 802.11Y Contention Based Protocol 802.11aq Service Discovery d Intl roaming j JP bands 802.11af TV Whitespace 802.11p WAVE a 54 Mbps 5GHz 802.11ac VHT 5GHz 802.11n High Throughput (>100 Mbps) b 11 Mbps 2.4GHz g 54 Mbps 2.4GHz 802.11ad VHT 60GHz 802.11W Management Frame Security 802.11ah <1GHz PHY 802.11aj 40 & 60 GHz Bruce Kraemer (Marvell) Page 15 Bruce Kraemer (Marvell)

16 March 2013 Snapshot Reports Bruce Kraemer (Marvell)

17 WG11 Editor Abstract / Agenda – Mar 2013
July 2007 March 2010 doc.: IEEE /0990r1 March 2013 WG11 Editor Abstract / Agenda – Mar 2013 Roll Call / Contacts / Reflector Go round table and get brief status report ANA Status / Process / What is administered Numbering Alignment process / Spreadsheet Amendment Ordering / Draft Snapshots Style Guide for Editor backup practices Slide 17 Bruce Kraemer (Marvell) Page 17 Bruce Kraemer (Marvell) Terry Cole (AMD)

18 WNG SC – March 2013 Review of objectives Tuesday AM1 (08:00-10:00)
May 2008 March 2013 WNG SC – March 2013 Review of objectives Tuesday AM1 (08:00-10:00) Measurements and analysis of Wi-Fi interferences in Korea – part 1 () - Minho Tuesday EVE (19:30-21:30) 802.11: Looking Ahead to the Future – Part ??? () – Osama Aboul-Magd Carrier-Oriented Wi-Fi for Cellular Offload () – Laurent Cariou Next Generation PHY/MAC () – Ron Porat Bruce Kraemer (Marvell) Page 18

19 802.11 ARC – March, 2013 Teleconference updates IETF/802 coordination
Jan 2009 doc.: IEEE /1455r0 March 2013 ARC – March, 2013 Teleconference updates 802 O&A Sponsor Ballot comments IETF/802 RFC 4441bis comments IETF/802 coordination RFC 4441 update Updates from IETF meeting and joint meeting GLK SC and 802 SC on “ bridging” Update APs as/are bridges?? AP/DS architecture and 802 concepts Figure 5-1 Future sessions / SC activities Bruce Kraemer (Marvell) David Bagby, Calypso Ventures, Inc.

20 IEEE 802.11 TGmc – Orlando March 2013
May 2008 doc.: IEEE /xxxxr0 March 2013 IEEE TGmc – Orlando March 2013 Since Jan 2013 meeting Completed Initial LB #193 on P802.11mc D1.0 Results: PASS 88.3% Approve, 11.7% Disapprove 801 comments (713 LB, 88 remaining 2012 Call for comments) Held 2 teleconferences Goals for March Meeting: Resolve comments, hear presentations Plan for May 2013 meeting Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

21 November 2010 doc.: IEEE /xxxxr0 March 2013 IEEE ac – March 2013 Completed the resolution of LB 191 comments. Comment spreadsheet is available at: Plan to start a new recirculation ballot on the unchanged draft D5.0. Seek the IEEE 802 EC conditional approval to proceed to sponsor ballot. The Task Group Agenda is available at 11-13/0255. Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

22 TGad – March 2013 Meeting Goals
Party Time No meeting in Orlando Published December 28, 2012 Press release out Jan 8, 2013 Awards in March 2013 (Orlando) Bruce Kraemer (Marvell)

23 TGaf – Meeting Goals March 2013
Approve meeting and teleconference minutes Review the results of LB192 Review the progress since January Resolve all LB 192 comments (166) Review regulatory landscape Request the Editor to create Draft 4.0 Request a WG recirculation letter ballot Plan for May meeting and teleconferences Slide 23 Bruce Kraemer (Marvell)

24 Finish specification framework document
Month Year doc.: IEEE /0587r0 March 2013 IEEE ah Snapshot March Finish specification framework document Work on draft text Received a submission on PHY draft text. Bruce Kraemer (Marvell) David Halasz, Aclara

25 IEEE 802.11 FILS TGai – Orlando March 2013
May 2008 doc.: IEEE /xxxxr0 March 2013 IEEE FILS TGai – Orlando March 2013 Goals for the Meeting: Approve minutes of past meeting and teleconference Comment resolution to volunteer review comments Approve final technical contribution Move to forward TGai call for comment Joint meeting with TGaq Approve Timeline Approve Teleconference schedule Approve Plan for May Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

26 IEEE 802.11aj – March 2013 Review updated TG Usage model
January 2013 doc.: IEEE /xxxxr0 March 2013 IEEE aj – March 2013 Review updated TG Usage model Target to approve TG usage model baseline in April meeting Review updated TG Functional Requirement Subject to further input from usage model update Review updated TG Evaluation Methodology Provide inputs for the link budget for 45GHz Review updated Channel measurement and model for 45GHz SEU will provide more channel measurement results for 45GHz New Submission and Presentation One contribution on “RoF Extension Link Backhaul” New contributions Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

27 March 2013 March 2013 Task Group ak March 2013 Enhancements For Transit Links Within Bridged Networks Primary foci: Develop a firm list of Problems to be solved by ak. Technical presentations on mechanisms and/or architectures to support Enhancements For Transit Links Within Bridged Networks. Discussion of Timeline and Process Teleconference schedule Joint meeting with Thursday morning. Agenda: See 11-13/0273 Bruce Kraemer (Marvell) Donald Eastlake, Huawei Technologies

28 IEEE 802.11aq – March 2013 Pre-Association Discovery
January 2013 doc.: IEEE /xxxxr0 March 2013 IEEE aq – March 2013 Pre-Association Discovery Presentations Initial technical solutions Down selection criteria Documents under development Use case document analysis (11-13/0118r2) Framework Requirements Document Terminology Document Liaisons Agenda for this meeting is 11-13/0256r0. Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

29 May 2008 doc.: IEEE /0547r0 March 2013 IEEE 802 JTC1 SC – March 2013 The agenda items that will be addressed this week are: Review extended goals From IEEE 802 ExCom in Nov 2010 Review IEEE WG liaisons to SC6 Review latest liaisons of Sponsor Ballot drafts Review status of SC6 ballots on IEEE 802.1X/AX (discuss responses to Chinese NB comments in pre-ballot) Review status of SC6 ballots on IEEE aa/ad/ae Prepare for next SC6 meeting in June in Korea Develop a draft of the “contribution process” for SC6 NBs Discuss Swiss NB “Explanatory Report” Discuss Swiss NB report comparing 802.1X and TEPA-AC Review status of WAPI, EUHT, TLSec, TEPA-AC, TAAA, TISec,… Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

30 Regulatory Standing Committee Meeting Goals March 2013
The regulatory summaries Regulatory issues status Review FCC TV band auctions, band repacking and TVWS spectrum (in Reply Comments) Review FCC Small cells in the 3550 to 3650 MHz band (in Reply Comments) Review and compose comments for FCC 13-22 Restructuring the 5 GHz band ETSI BRAN progress on EN Critical issues NPRM FCC comment development Other Should we have a formal Regulatory liaison with the other organizations? Bruce Kraemer (Marvell)

31 March 2013 Recent Ballots Bruce Kraemer (Marvell)

32 Recent Ballot History Year Inter meeting Period Ballots Completed WG
March 2013 Recent Ballot History Year Inter meeting Period Ballots Completed WG Sponsor 2011/2012 Nov - Jan 1 6 2012 Jan - Mar Mar - May 2 May - July July - Sept Sept - Nov 2012/2013 2013 Bruce Kraemer (Marvell)

33 March 2013 Ballot #191 was a 15 day Working Group technical recirculation Ballot asking the question "Should P802.11ac D5.0 be forwarded to Sponsor Ballot?". Results: Ballot Opening Date: Thursday January 17, :59 ET Ballot Closing Date: Friday February 01, :59 ET 300 eligible people are in this ballot group. 249 affirmative votes 12 negative votes 10 abstention votes 2 negative vote without comments === 273 votes received = 91.0 % valid returns = 3.7 % valid abstentions APPROVAL RATE: 249 affirmative votes = 95.4 % affirmative 12 total negative votes = 4.6 % negative Motion PASSES., 141 comments received. Bruce Kraemer (Marvell)

34 March 2013 IEEE WG Letter Ballot #192 was the first 15 day Working Group Technical recirculation Ballot asking the question "Should P802.11af D3.0 be forwarded to Sponsor Ballot?" Results : Ballot Opening Date: Thursday January 24, :59 ET Ballot Closing Date: Friday February 08, :59 ET 300 eligible people are in this ballot group. 194 affirmative votes 30 negative votes 1 negative vote without comments 8 abstention votes === 233 votes received = 77.7% valid returns = 3.4% valid abstentions APPROVAL RATE: 194 affirmative votes = 86.6 % affirmative 30 valid negative votes = 13.4 % negative Motion Passes , 166 comments received. Bruce Kraemer (Marvell)

35 March 2013 IEEE WG Letter Ballot #193 was the initial 30 day Working Group Technical Ballot asking the question "Should P802.11mc D1.0 be forwarded to Sponsor Ballot?" Results : Ballot Opening Date: Thursday January 31, :59 ET Ballot Closing Date: Saturday March 04, :59 ET 325 eligible people are in this ballot group. 197 affirmative votes 26 negative votes 0 negative vote without comments 22 abstention votes === 245 votes received = 75.4% valid returns = 9.0% valid abstentions APPROVAL RATE: 197 affirmative votes = 88.3 % affirmative 26 valid negative votes = 11.7 % negative Motion Passes, 713 comments received. Bruce Kraemer (Marvell)

36 WG Comment Collection on IETF 4441 43 comments forwarded to IETF
March 2013 WG Comment Collection on IETF 4441 43 comments forwarded to IETF Bruce Kraemer (Marvell)


Download ppt "WG11 Opening Report Snapshots March 2013"

Similar presentations


Ads by Google