Presentation is loading. Please wait.

Presentation is loading. Please wait.

Barbara Lehtna Juhendaja: Mall Liiva

Similar presentations


Presentation on theme: "Barbara Lehtna Juhendaja: Mall Liiva"— Presentation transcript:

1 Barbara Lehtna Juhendaja: Mall Liiva
The Olympics in 2012 Barbara Lehtna Juhendaja: Mall Liiva

2 The Olympic games in 2012 will be held in FOR THE THIRD TIME
Previously in 1908 and 1948.

3 The new logo was unveiled in 2007 and cost £400,000
Early public reaction to the logo, was largely negative: more than 80% of votes gave the logo the lowest possible rating

4 The olympic Stadium was released in 2007 and should be finished 6 months before the games start

5 The most expensive stadium ever built, Wembley, will be a venue for football

6 The 2012 Summer Olympic programme features 26 sports and a total of 39 disciplines

7 IOC voted to drop baseball and softball
Women's boxing, which was not included in Beijing, is again being considered for inclusion Netball is being drafted as a possible demonstration sport at the 2012 games IOC – International Olympic Comittee (founded in 1894)

8 The paralympics will be held in london for the first time
Programme features 20 sports, nine of them will be played in London’s Olympic Park

9 Organisers estimate that 7
Organisers estimate that 7.7 million tickets would be available for the Olympic Games They will be going on sale in 2011, with at least 50% of these priced under £20

10 Queen Elizabet II: “As a country we share a passion for sport!"


Download ppt "Barbara Lehtna Juhendaja: Mall Liiva"

Similar presentations


Ads by Google