Download presentation
Presentation is loading. Please wait.
1
AWG 24 April 2012 Candidate Topics
Attendance Greg Weidman Bill Garvin Manesh Patel Heather Shappee Review Plan Review inputs from WG members Jerad’s Damashek – artifact nominations Damashek – one-liners Garvin – Security Domain Greg -- Draft rewrite of the Business Sub-Architecture Domain section based on the following principles: 1. Prefer well-defined vice free-form artifacts 2. Emphasize connection with the FEA CRM (or BRM in particular for this section) 3. Show the ties between the sub-architecture domains 4. Leverage DoDAF insights to the extent possible Artifact list finalization Sub Architecture Domains (6) leads, co-lead, members Next meeting 24 April 2012 AWG Working Papers -- FOUO
2
AWG Working Papers -- FOUO
Review Plan 24 April 2012 AWG Working Papers -- FOUO
3
AWG Working Papers -- FOUO
CPM Impacts on 30 April deliverable? Impacts post 30 April? 24 April 2012 AWG Working Papers -- FOUO
4
AWG Working Papers -- FOUO
CPM Artifacts CPM/FSAM Artifacts (from both an as-is and target perspective) DODAF View(s) Used to Develop CPM/FSAM Artifact (DRAFT Mapping) Common / Mission Services Target Maturity Levels CV-1 (Desired Effect/Outcome); CV-7 (capability to service) Business Value Chain OV-2 Business Function Model OV-5a, OV5-b Key Business Process Model OV-5b Business Process Swim Lane Diagram OV-6c Key Information Sources and Qualitative Assessment SV-4, SvcV-4 Business Data Mapped to Key Business Processes (CRUD) OV-3 Data Model DIV-2 Data Steward Assignments OV-4, OV-5a, SV-5b (for information source, may also be covered by metadata in 24 April 2012 AWG Working Papers -- FOUO
5
Damashek & Garvin “One-Liners” Inputs
Bill Garvin’s folded in Need to work on folding in Greg’s 24 April 2012 AWG Working Papers -- FOUO
6
AWG Working Papers -- FOUO
Domain Narrative Description Revisions Emphasize connection with the FEA version 2 CRM Lead Co-Lead Members Strategic Heather Shappee Business Services Greg Weidman Data and Information Enabling Applications Dave McDaniel Host Infrastructure DISA? Security Controls Bill Garvin I/C (GW to find) 24 April 2012 AWG Working Papers -- FOUO
7
AWG Working Papers -- FOUO
Next Meeting 27 April AWG meet to review the sub-architecture domain and artifact lists GTM: DCO: Dial: +1 (773) Access Code: 24 April 2012 AWG Working Papers -- FOUO
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.