1 Report from TCFF kyung-Am Park TCFF Chair
Fluid Flow/Acoustic & Vibration Center KRISS 24 GA Agenda 15 TCFF

2 CMC Review Teams of 6 Categories
1) Water Flow KRISS, NMIJ 2) Hydrocarbon Flow CMS, NMIJ 3) Low P Gas Flow NMIJ, NIM 4) High P Gas Flow KRISS, CMS 5) Air Speed NMIJ, CMS 6) Volume NML, NMIJ 24 GA Agenda 15 TCFF

3 CMC Review in 2007~2008 EURAMET SIM : Trans-Canada Calibration
COOMET : Belarus (viscosity) 24 GA Agenda 15 TCFF

4 CMC in BIPM Appendix a) Chinese Taipei (CMS) 19 entries*
b) Japan (NMIJ) entries c) Korea (KRISS) entries* d) Singapore (SPRING) entries *updated 2008 * Review comments from EURAMET, SADCMET, COOMET for Chinese Taipei. 24 GA Agenda 15 TCFF

5 APMP KC in 2007~2008(1) K1(water), Pilot: KRISS/Korea protocol under review by participants, a test schedule is re-arranged for 2009. Participating NMIs: NMIJ/Japan, CMS/Chinese Taipei, NIM/PRChina, VMI/Vietnam K2(Hydrocarbon), Pilot: CMS draft protocol ready, await schedule & participants confirmation, need TS support & participant from EUROMET Participating NMIs: VMI K3(Air Velocity), Pilot: NMIJ protocol ready, invitation letter sent by Aug. 21, 2008, need one participant from EUROMET Participating NMIs: KRISS, CMS, SIRIM 24 GA Agenda 15 TCFF

6 APMP KC in 2007~2008(2) K4(Volume), Pilot: NMI/Australia Tests are completed. Participating NMIs: CENAM/Mexico, SCL(Hong Kong/PRChina), KRISS, NIM, CSIR-NML(South Africa), NMIT/Thailand, NMIJ, NPSL, VMI K5(High pressure gas flow), Pilot: KRISS Combined report with CCM.FF-K5.b is in KCDB. Participated NMIs: CMS K6(Low pressure gas flow), Pilot: NMIJ Tests are completed in 2007/10, data analysis and final report in progress Participating NMIs: KRISS, NIM, CMS, SPRING(A-Star/Singapore), NIMT, NMIA 24 GA Agenda 15 TCFF

7 CCM-WGFF activity 8th CCM-WGFF was held on Thursday 18 April 2008 at Sevres, France Draft B of K2 was officially approved. Workshop on future KC preparation was organized on 17th April, 2008. -over 25 persons attended -RMO Reports (APMP, SIM, EUROMET, COOMET) -KC pilot lab reports (K1~K6) -Future KC - 24 GA Agenda 15 TCFF