1 平成30年11月 doc.: IEEE /424r1 September 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Closing Report September 2006 Melbourne Australia] Date Submitted: [21 September 2006] Source: [Reed Fisher] Company [Oki Electric Industry Co., Ltd.] Address [2514 E. Maddox Rd., Buford, GA USA.] Voice:[ ] Re : [] Abstract:[Description of TG3c September 2006 meeting proceedings ] Purpose:[Report to Closing Interim Meeting, 22 September 2006] Notice :This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P R. Fisher, Oki Electric Industry co. Ltd Stuart J. Kerry - Philips Semiconductors, Inc.

2 TG3c 9th Meeting, Melbourne Closing Report 22 September, 2006
R. Fisher, Oki Electric Industry co. Ltd

3 08:00 September 19. Call to order.
TG3c Leadership: Chair: R. Fisher vice Chair: A. Mathew Secretaries : H. Ikeda, S-K Yong 3. Attendance: Approx attendees in each slot Ten 2-hour time slots were allocated :00 September 21 Meeting adjourned Sep. 19 (Tue) Sep. 20 (Wed) Sep. 21 (Thu) AM1 X AM2 PM1 PM2 R. Fisher, Oki Electric Industry co. Ltd

4 Meeting Accomplishments
September 2006 Meeting Accomplishments Reviewed and updated channel modeling work. Five LOS models and one NLOS model are defined. Five Usage Models were reviewed and approved. Heard four contributions on modulation, PHY computer simulation, and 60GHz Power Amplifier. Discussed and updated TG3c project timeline. R. Fisher, Oki Electric Industry co. Ltd

5 Contribution List September 2006
R. Fisher, Oki Electric Industry co. Ltd

6 Plan to Get to Baseline Document
平成30年11月 doc.: IEEE /424r1 September 2006 05/311r9 Plan to Get to Baseline Document 09/06 (Melbourne, Aus.) - Continued channel model discussions. Continued development of UMD. Future plan: 11/06 (Dallas TX) – Finalize channel model. Finalize channel model document. Finalize UMD document. Finalize Technical Requirements. Issue CFP. Continue MAC discussions and make recommendation for MAC development. 01/07 (London, UK) – Presentation of preliminary proposals. 03/07 (Orlando, FL) – Final proposals due 1 week prior to meeting. Presentation of all proposals. 05/07 (Montreal, CA) – Present updated/merged proposals. Down selection begins. If down-selection finishes, begin drafting Standard. R. Fisher, Oki Electric Industry co. Ltd Stuart J. Kerry - Philips Semiconductors, Inc.

7 Ballot plan 07/07 – First letter ballot 09/07 – Re-circulation
平成30年11月 doc.: IEEE /424r1 September 2006 05/311r9 Ballot plan 07/07 – First letter ballot 09/07 – Re-circulation 11/07 – 802 Sponsor ballot 01/08 – 802 Sponsor re-circulation 03/08 – Standard finished. R. Fisher, Oki Electric Industry co. Ltd Stuart J. Kerry - Philips Semiconductors, Inc.

8 September 2006 TG3c Timeline R. Fisher, Oki Electric Industry co. Ltd