Presentation is loading. Please wait.

Presentation is loading. Please wait.

ACE – A System Viewpoint

Similar presentations


Presentation on theme: "ACE – A System Viewpoint"— Presentation transcript:

1 ACE – A System Viewpoint
Celeste Catano

2 Edit “Lite” Fewer edits than what is currently being done in ACS
CBP to provide a list of edits they will NOT be doing Your software or internal procedures will have to ensure that you cannot submit non-compliant data. Future changes may require more effort in identifying the edits that need to be added to your system.

3 Deployment A2.2 – Only Entry Types 01 and 11
All other entries will be processed in current process Software will have to handle 2 different formats for messages. New Entry Summary message format will include: Line Level Consignees (Sold to & Deliver To) Line Level Reconciliation Flags Census Override Codes Expansion of Master, House and Sub to 50 characters Will not be used until Cargo Release Deployment Max line count expanded to 9,999 lines

4 Post Summary Corrections
Needs to be used after the shipment has been released and the entry summary data accepted by CBP Full replace will not be allowed Systems will need to keep track of all changes Send Reason code along with the changes Wait for CBP Approval before doing more changes If Denied – Changes need to be rolled back to state prior to the changes.

5 Documents Required Process
CBP to send a message requesting individual documents Full Summary packets will no longer be required Documents required no longer tied to Daily Statements Submit the documents as requested instead of waiting for the statement presentation. Your system will have to keep track of the shipments with document requests so you don’t forget to submit the docs In the future, CBP will be able to accept images instead of paper documents. Time to start looking into adding Imaging solutions to your existing system.

6 ABI Statements Elimination of the Periodic Daily Statement
Reports will be available to replace functionality Workshop to be held in October Post Summary Corrections Refunds/Increases will be reflected in the statements. Statements will reflect the version of the entry summary

7 Misc. Software Changes CF28, 29, 4647 – New ABI Messages
Liquidation – Courtesy Notices will not be sent for entries liquidated by operation of law Recon Entries – ABI Message changes to replace the spreadsheet and processing at the line level AD/CVD Recon


Download ppt "ACE – A System Viewpoint"

Similar presentations


Ads by Google