Presentation is loading. Please wait.

Presentation is loading. Please wait.

Acceptable fill well standards

Similar presentations


Presentation on theme: "Acceptable fill well standards"— Presentation transcript:

1 Acceptable fill well standards
Site operators and drivers share the responsibility to ensure underground fill-wells are maintained to standard. Broken spill well cover Unpainted fill well lid Broken/damaged fill tube cap Site Operator: Repair within one month Driver: Complete site deficiency report & report to office Fill well defects Acceptable fill well standards Fill-well lids painted in CPPI colours Product & tank capacity tag attached to fill well & well liner in place. Properly attached and functioning spill well cover. Painted fill well lids Capacity & product tags in place Working fill well cover Water accumulation at fill well Tag & liner info do not match Major fill well defects (do not deliver) Repair before next delivery Do not deliver Inform dispatch Missing tag / not attached securely


Download ppt "Acceptable fill well standards"

Similar presentations


Ads by Google