Presentation is loading. Please wait.

Presentation is loading. Please wait.

Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.

Similar presentations


Presentation on theme: "Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013."— Presentation transcript:

1 Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

2 Existing Station Location 34 Water Street Built 1950 Extended the building front forward 15 in 1990 4325 Sq ft 1 story building 1/3 Acre site River bank on one side Masonry walls Wood framed roof

3 Apparatus Bay Existing – 2,422 sq. ft. – 3 bays wide – 2 Overhead doors: 1 -10 x 11& 1- 20 x 11 – 4 trucks total =1,320 sq. ft. – Other miscellaneous equipment

4 Existing Conditions Cant open doorsTight quarters Isle ObstructionsFirefighter to close to Trucks

5 Existing Spaces Training Meeting Space Kitchen Office

6 Existing Parking

7 Space Needs Program Outlined By McGuire Group 2008 Staffing and Parking Space Allocations Apparatus and Support Public Lobby/Dispatch Administration Firefighters Headquarters Indoor Training Building Support and Mechanical

8 Operational Issues Overhead doors too narrow and too low Apparatus bays too narrow and too low Administrative spaces inadequate No Day Room for firefighters Air-Pak filling station in apparatus bay is a hazard No Decontamination area for Gear and Equipment Male/ Female Shower rooms non-existent Kitchen is too small for current staff

9 Space Deficiencies Only one office No room for new construction print review No office for Asst. Chiefs / Training, Pre- Planning fires, Truck & Equipment maintenance records No area for code enforcement information Not adequate space for firefighters – Locker room – Shower room

10 Apparatus Bay Comparison Williamstown FD Existing 2242 Sq./Ft Modern Fire Station 6100 Sq./Ft

11 Apparatus Bay Space Needs Williamstown FD ExistingModern Fire Station

12 Administrative Space Present Conference RmPresent Office Modern

13 Training Modern Existing

14 New Apparatus Area

15 Apparatus Williamstown 1975Williamstown 2012

16 Proposed New Site 562-580 Main St

17 Aerial View of Proposed Site

18

19

20

21 Size Comparison Existing Station

22

23

24 Thank You Anytime Anywhere Anything Well Be There! Any Questions?


Download ppt "Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013."

Similar presentations


Ads by Google