Download presentation
Presentation is loading. Please wait.
Published byPaula Gonçalves Carvalhal Modified over 5 years ago
1
IOU Update Q2 2014 EM&V Stakeholder Meeting
Rob Kasman, PG&E Shahana Samiullah, SCE Kevin McKinley, SDG&E Loan Nguyen, SCG June 10, 2014
2
71 IOU-led studies in PSR 25 have kicked-off and are in field
7 completed; Final reports available 8 in draft reporting phase 9 in initial scoping phase 4 in RFP phase 2036 – IOU LGP (SCE) – RFP posted 2044 – Res Workpaper Update: Multifamily Pool Pump (SCE) – Proposal scoring 2046 – MF – EUC/MIDI Pilot and MFEER Change (SCE) – RFP in development; expected Q3 2047 – Process Evaluation for Whole House/EUC Changes (PG&E) – RFP expected early Q3 10 on hold, or awaiting Program initiation (Finance) or another study to conclude 6 cancelled, deferred, or will be conducted by ED 1 being reassessed/may be cancelled; 1 update not available
3
Please refer to the Project Status Reporting (PSR) System for current information on study status:
A number of Res, ZNE and HVAC studies ongoing with funds Most expected to be complete by end of 2014, however several will continue into 2015
4
Project Status
5
PSR Help Page
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.