1 Italian high speed lines
Development of the italian railway

2 Modal balance 92,7% of passengers and 65% of freight are carried by road Only 5,44% of passengers and 10,74 of freight are carried by train Data taken by National Transport Survey 1999

3 Most of the traffic is concentrated in few lines
Turin-Venice and Milan-Naples account about 10% of rail network Carry more than 40% of all passengers Carry almost 30% of freights Sources FS spa

4 Relation about the project
As stressed at the Eurailspeed 2002 (Madrid october) by Mauro Moretti, chairman of RFI, the lines involved in the project are the Turin – Milan - Naples and the so called ”rest of the system” On the new lines there will be both passenger and freight trains as in Germany The line will improve both the speed and the number of trains: that´s why it is called also high speed/high capacity

5 The project

6 Milan - Turin Length: 125 km (first part of corridor 5 Lisbona - Kiev)
Time: min (105) Max speed: 300km/h Cost: mil euro Workers: 2850 Progress: 19% Turin – Novara ready by 2006 Novara – Milan ready by 2008 (data updated at January 31)

7 Map

8 Number of trains

9 Start working

10 Impact

11 Milan - Bologna Length: 182 Km Time: 60 min (102)
Max speed: 300 km/h (240 km/h in Modena) Cost: mil euro Workers: /4500 Progress 22% Ready by 2007

12 Map

13 Number of trains

14 Working on the Po Bridge

15 Impact

16 Bologna - Florence Length: 78 km (73 km in tunnels) Time: 30 min (52)
Max speed: 300 km/h (100 km/h in the suburban area of Florence) Cost: mil euro Workers: 2450 Progress: 64% Ready by 2007

17 Number of trains

18 Map

19 Working on tunnel

20 Impact

21 Rome - Florence It came into service in 1991 (first part in 1978)
Length: 254 km Max speed allowed now: 250 km/h Upgrading to the standards of the new high-speed lines Time: min (96) Cost: 300 mil euro

22 Number of trains

23 Map

24 Florence station

25 Rome - Naples Length: 205 km Time: 65 min (105) Max speed: 300 km/h
Cost: mil euro Workers: 648 180 km of the new line are ready Tests on the ERTMS system will start on April in the first 100 km Progress: 87% It will come into service in 2004

26 Number of trains

27 Map

28 Photo

29 Impact

30 Cost of a trip between Torin and Naples
car train plane direct cost 277,63 65,92 161,53 external cost 109,76 20,95 28,92 total 387,39 86,87 190,45

31 Way of financing Total cost: 28.750 million Euro
60% of the total cost is given by the government and the EU (Rm–Na, Bo–Fi) 40% of the cost is risen from the capital market (debt with pubblic guarantee, for instance 2369 ml from BEI, 1033 ml from Merrill Lynch Bank)

32 Other lines in project Milan – Venice (pending approval) completely ready by 2011? Milan – Genoa (pending approval) first part ready by 2010? Venice – Trieste - Lubiana (in project) Turin – Lion (in project) Naples – Palermo (in project)

33 Number of trains

34 Number of trains

35 Speed and time Line (source: FS supply 98/99 ) Current distance (km)
Distance of the new line (km) Current times (minutes) Times on new lines (minutes) Average speed (km/h) Turin - Milan 153 125 105 50 150 Milan-Bologna 215 182 102 60 Bologna - Florence 92 78 52 30 156 Florence-Rome 262 254 96 80 190,5 Rome-Naples 214 204 65 189

36 Time saved

37 Time Milan – Rome 2h 50 m (4h10m) Milan – Naples 3h 55 m (5h55m)
Milan – Florence 1h 30 m (2h34m) Rome – Bologna 1h 50 m (2h28m) Florence – Naples 2h 25 m (3h21m) Turin – Rome h 40 m (5h55m) Turin – Naples h 55 m (7h40m)