Download presentation
Presentation is loading. Please wait.
1
Liability Continuity System (LCS) Update
Mark Hawkins ACACSO November 11 – 13, 2015
2
Agenda Migration Update LCS Technical Advisory Group (TAG)
LCS Going Forward LCS Monitoring
3
The LCS Migration is Complete!!!
LCS was the last system to migrate from the Railinc mainframe The official cutover was June 7 The LCS TAG provided oversight, direction and significant testing assistance
4
How is LCS Performing? Increase in the consistency of the application of business rules Corrected one defect post-migration Process has allowed team to improve interaction between LCS and other Railinc systems
5
LCS & DDCT Working Together
The Damaged & Defective Car Tracking System (DDCT) now shares incident specifics with LCS By receiving this information LCS can properly assign liability when multiple DDCT incidents are open
6
LCS TAG Continues Post-Migration
The LCS TAG is continuing to work through a few open items after the implementation These potential enhancements will improve the accuracy of LCS Any enhancements will be implemented in Q and will be communicated to the industry
7
LCS Future Enhancements
Override of “999999” SPLC for DDCT events Bad Order events disallowed for GAP record logic Haulage-End TRAIN II messaging Correction of a messaging setup anomaly dealing with illogical interchanges
8
LCS Monitoring Railinc is implementing robust monitoring technology across several industry-critical systems (Wiley) Technical and Business resources are working to build a dashboard that can alert the team to any issues with LCS or TRAIN II messaging
9
Customer TRAIN69 Messages
10
Monitoring Phase 2 Standard Reports Research Tools
More proactive reporting of potential issues Improved controls Better awareness
11
Thank You! Mark Hawkins Product Manager AAR Asset Utilization & Compensation
Similar presentations
© 2024 SlidePlayer.com Inc.