Presentation is loading. Please wait.

Presentation is loading. Please wait.

STATE OF AFFAIRS IN THE MISSOC PROJECT

Similar presentations


Presentation on theme: "STATE OF AFFAIRS IN THE MISSOC PROJECT"— Presentation transcript:

1 STATE OF AFFAIRS IN THE MISSOC PROJECT
MISSOC NETWORK MEETING Budapest, May 2011 STATE OF AFFAIRS IN THE MISSOC PROJECT Jan Spooren, Team Leader

2 Innovations / priorities
Work plan Innovations / priorities Reduced emphasis MISSOC Tables Updates 1/1/11 and Publication Correspondents Guide Clarification Tables VIII and X Update country-specific reports Only one up-date MISSOC Analysis Minimum guaranteed resources Responsibility of Secretariat Promote country-specific reports MISSOC Info I Synoptic report No country reports MISSOC Info II Cancelled Websites Just renewed: only update COMMENTS/REMARKS Delay of country-specific descriptions: translations in May instead of March Update 1 July 2011 needs to be completed in shorter time span Arrange transition

3 Restructuring in European Commission
Project management Restructuring in European Commission DG EMPL unit D3 (Mr. Ralph Jacob) Mr. Michiel Berrevoets and Ms Monica Federowicz Other contact persons in IT unit of DG EMPL National Correspondents MISSOC Info Letters (17/12 and 4/4) Briefing for updates Bilateral feedback Evaluation and reflection on MISSOC with NCs will be done at beginning of new contract MISSOC Secretariat Further enhanced role of Michael Coucheir as deputy team-leader Limited number of academic experts but more extensive use Secretariat meeting (9 March)

4 MISSOC TABLES: Update 1 January 2011
Updated files received from all 31 countries Final approvals received from 26 countries Application of reviewed guidelines on Table VIII: About 50% of NCs carefully follow reviewed guidelines The review involves a substantial increase of workload for Secretariat Planning Translations ongoing (and a lot have been completed) Insert in database + quality check Publication by 30 June on missoc.org Transfer to DG EMPL website

5 Limitation of e-promotion actions
IT and communication Newsletter Newsletter 2011/1 issued on February Revamping Newsletter 2011/2 planned for September Website and database Reflection on complete integration of missoc.org website and database in DG EMPL webpages Limitation of e-promotion actions Delay of update country-specific descriptions Possible transfer of missoc.org to DG EMPL website

6 Identification of ‘Guaranteed Minimum Resources’ as theme
MISSOC ANALYSIS 2011 ACTIONS PERFORMED ACTIONS PLANNED Identification of ‘Guaranteed Minimum Resources’ as theme Exploration of agreed theme Consultations with EC 1rst draft of MISSOC Analysis Finalising of MISSOC Analysis 2009 Potential inputs from NCs Translations / editing /publication Dissemination To MISSOC users For use in the Commission COMMENTS/REMARKS Demonstration on how to make use of information in the MISSOC tables Major responsibility for MISSOC secretariat Link with restructured Table XI

7 Challenges ahead Simultaneous update of Tables and CSD
Shortened cycle for updates New tender for MISSOC Secretariat Bridging and/or transition arrangements Increase relevance and widen outreach Integration of country-specific descriptions of social security Link to other Community Initiatives Candidate countries Smart use of innovative communication facilities


Download ppt "STATE OF AFFAIRS IN THE MISSOC PROJECT"

Similar presentations


Ads by Google