Presentation is loading. Please wait.

Presentation is loading. Please wait.

Corporate Advisory Committee

Similar presentations


Presentation on theme: "Corporate Advisory Committee"— Presentation transcript:

1 Corporate Advisory Committee
GLC – AAAE Corporate Advisory Committee 2018 Commercial Airport Project of the Year - Airfield 2018 Commercial Airport Project of the Year – Architecture 2018 General Aviation Project of the Year – Airfield 2018 General Aviation Project of the Year - Architecture 2018 Corporate Member of the Year

2 GLC – AAE Commercial Airport Project of the Year:
Award Criteria: Architectural Project & Airfield Project The Airport must be represented in the Chapter by an Executive Member in good standing. The project must have been completed between January 1, 2017 and December 31, 2017 The project must be fully operational at the time of the nomination. 4. This Award could be given to one (1) Airfield Project and one (1) Architectural Project.

3 Gateway Transformation – Phase 1
GLC – AAE Commercial Airport Project of the Year: Architectural Project Gerald R. Ford International Airport Gateway Transformation – Phase 1

4 Before Gateway Transportation Phase 1: Consolidated Checkpoint and Marketplace

5 Before Gateway Transportation Phase 1: Concourse Renovation

6 Gateway Transportation Phase 1:
Checkpoint Recomposure Area, Marketplace, President Gerald R. Ford Tribute Room, Concourse Lounge

7 Runway 10 Extension Program
GLC – AAE Commercial Airport Project of the Year: Airfield Project Cherry Capital Airport (Traverse City) Runway 10 Extension Program Prein & Newhof

8 Phases 1, 2 26 Calendar Days 8/5 – 8/31/17 RUNWAY 10-28 CONDUIT\CANS
[NIGHT WORK 90 MIN. PPR NOTAM] PERIMETER ROAD GRADING & FENCE RELOCATION INSTALL SILT FENCE & GRADE PERIMETER ROAD RUNWAY SIGNAGE [NIGHT WORK 30 MIN. PPR NOTAM] GRADE OBSERVATION PARK

9 Phases 3, 4, 5 24 Calendar Days 9/5-9/14/17 RUNWAY 10-28 CLOSED
RESURFACING 5,000’, RECONSTRUCTION OF 800’ PAVEMENT, RECONSTRUCT SHOULDERS, NEW DISTANCE REMAINING SIGNS, NEW EDGE LIGHTING SYSTEM, TEMPORARY MARKINGS CONSTRUCT PAVED SHOULDERS W/IN RUNWAY RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 TEMPORARY THRESHOLD MARKING AND LIGHTS (6,008’ X 150’) CONSTRUCT 115’ EXTENSION RUNWAY 10-28 EXTEND TAXIWAY G CONSTRUCT BLAST PAD, MALSR THRESHOLD AND FOUNDATIONS, RSA GRADING EXTEND TAXIWAY D

10 Phases 6, 7, 8 50 Calendar Days (9/13-11/02/17)
GROOVE & PAINT RUNWAY 10-28 (~20 DAYS AFTER PAVING) REMOVE TEMPORARY FENCE AND COMPLETE PERIMETER ROAD WORK CONSTRUCT PRIVACY FENCE CONSTRUCT MALSR SYSTEM AND SERVICE ROAD

11 GLC – AAE Airport General Aviation Project of the Year:
Award Criteria: Architectural Project & Airfield Project The Airport must be represented in the Chapter by an Executive Member in good standing. The project must have been completed between January 1, 2017 and December 31, 2017 3. The project must be fully operational at the time of the nomination. 4. This Award could be given to one (1) Airfield Project and one (1) Architectural Project.

12 Beck’s Hybrids Corporate Hangar
GLC – AAE Airport General Aviation Project of the Year: Architectural Project Indianapolis Executive Airport Beck’s Hybrids Corporate Hangar Woolpert

13

14

15

16 Runway 9-27 Rehabilitation
GLC – AAE Airport General Aviation Project of the Year: Airfield Project Porter County Regional Airport (VPZ) Runway 9-27 Rehabilitation Woolpert

17

18

19

20 GLC – AAE Corporate Member of the Year:
Award Criteria: Corporate Member or Firm must be in good standing as a member of the GLC-AAAE Chapter. Corporate Member or Firm must have completed work or supplied a product within the Chapter’s boundaries, or must have made a significant contribution within the Industry, particularly within the Chapter’s boundaries, during the calendar year prior to the Annual Chapter Conference.

21 Corporate Member of the Year
GLC – AAE Awards: Corporate Member of the Year Mead and Hunt

22 Thank You & Congratulations
to all our nominees!


Download ppt "Corporate Advisory Committee"

Similar presentations


Ads by Google