Download presentation
Presentation is loading. Please wait.
1
Broward County Transit
Chris Walton Transportation Director 9/20/2018
2
$25M Total Bus System Contracting Opportunities
ADA Improvements Countywide ($1.0M) Concrete-Sidewalks, Bus Cut-outs Lauderhill Mall Transit Center Re-Construction ($10.0M) Site Work / Construction Concrete Landscaping Electrical Steelwork/Welding Plumbing Roofing Art in Public Places Internal Build-out Specialty Furnishing West Regional Terminal Improvements ($500,0000) Site Signage/Lighting Landscaping/Irrigation SR 84 Powerline & NW 59 CT ($1.0M) Site Work / Roadway Construction Curb / Median Work Asphalt Improvements Mast Arm Assembly Installation Miramar Park and Ride ($9.7M) Site Work / Construction Shelter Installation Concrete Landscaping Electrical (Solar) Steelwork/Welding Plumbing Roofing Irrigation Pre-fabricated Bus Shelters/Site Amenities ($2.0M) Copans Garage ($1.0M) Paving Grading Drainage Striping 9/20/2018
3
Anticipated Advertisement
Contracts Date ADA Improvements Summer 2017 Pre-fabricated Bus Shelters/Site Amenities West Regional Terminal Improvements Copans Garage Fall 2017 Miramar Park and Ride (FDOT) Winter 2018 SR 84 (Powerline & NW 59 Ct) (FDOT) Lauderhill Mall Transit Center Fall 2018 9/20/2018
4
Rail Transit Opportunities
Wave Streetcar Infrastructure & Facility Design-Build Contract Construction Sub-Contracting ($114M) Design Services and Support ($25M) Wave Streetcar Vehicle Procurement Trucking and Delivery Wave Streetcar Operation & Maintenance Contractor ($6M annually) Facility and Infrastructure maintenance (Cleaning, Painting, Electrical, Plumbing, HVAC, etc.) Insurance Landscaping Service Tool & Parts Inventory Security Services Vehicle Cleaning Uniform Service Inspection Services Branding, Outreach & Advertising Machining Services 9/20/2018
Similar presentations
© 2025 SlidePlayer.com Inc.
All rights reserved.