LCLS Injector Commissioning Workshop (ICW)

Similar presentations


Presentation on theme: "LCLS Injector Commissioning Workshop (ICW)"— Presentation transcript:

1 LCLS Injector Commissioning Workshop (ICW)
A Few Reminders and Comments LCLS Continental breakfast each morning 8:00 to 8:30 Workshop moves to Redwood Room in ROB on Wednesday (see map on workshop web-site) Please limit your presentation to 30 minutes (45 available to allow discussion – interruptions encouraged) Please focus on issues related to LCLS injector commissioning Brief tour of linac gallery, LCLS laser room, LCLS injector vault Monday 6:00 – 7:00 PM (bus outside Kavli Building at 5:45) Commissioning Readiness Review embedded in workshop (Corlett, Lewellen, Schreiber) Open discussion time is still available, mostly on Wed. afternoon – please contact PE to request short presentation time (10-15 min.) Thank you very much for attending (from many distant locations)

2 SLAC Site Map Redwood rm.

3 Emergency Information
Be aware of exits Speaker will indicate locations Fire or other emergency evacuation Follow residents out of building to assembly area Earthquake Remain in building: Duck, cover, hold position until shaking stops Evacuate building to assembly area Stay away from windows, downed power lines In an emergency Dial from a SLAC phone; or Dial 911 from your cellular phone Provide SLAC address (2575 Sand Hill Road, Menlo Park, CA; cross street Saga Lane) and building number (Kavli building is #51).

4 The Workshop is motivated by the following goals:
LCLS Present LCLS injector commissioning plans to a wide audience to allow others to integrate and to solicit advice, especially from those with recent hands-on experience. Provide forum to hear experimental proposals and collaborative efforts, which are consistent with LCLS commissioning plans and scope. Produce a written report (Commissioning Readiness Review), as part of LCLS Accelerator Readiness Review (ARR), summarizing independent assessment of SLAC’s readiness to commission LCLS injector (thanks to John, John, and Siggy).