Project Status as of March 26, 2012

Similar presentations


Presentation on theme: "Project Status as of March 26, 2012"— Presentation transcript:

1 Project Status as of March 26, 2012
Ship Check Design Information Points CAF drawing with plates CAF drawing Gantt Chart

2 Ship Check 3/14/12 Trip accompanied by project advisor Dr. Bao
Discussed project progress with customer Team gathered additional dimensional data on the CAF Examined critical drawing dimensions to verify accuracy Took pictures of specific areas of CAF

3 Design Information Points
Need to determine where to weld Plates must be placed over supports in the CAF for maximum stress-bearing Input all information into software for analysis

4 An inch here to weld L3 L2 L1 L4 An inch here to weld

5 CAF

6 Gantt Chart as of March 26, 2012