Tidal and Ocean Current Energy
Minesto Tidal and Ocean Current Energy Dr. Martin Edlund Chairman of the Board Minesto AB Tokyo, UK Embassy, October 9, 2014 16/09/2018
2
Executive Summary Minesto AB is a tidal energy company spun out from Saab Group in 2007 26 dedicated staff including R&D and business experts from wind power, tidal power and automotive industries Patented technology: Deep Green is unique in its ability to cost effectively produce electricity from low flow currents at a wide range of depths Minesto’s technology provides unique access to global tidal stream and ocean current resources not economically accessible to most other marine energy technologies Minesto has received €15M and is now seeking €20M in private funding to take the company from a pre-revenue position to a revenue position Minesto is seeking €20M in matched grant funding from Welsh Government (European Union Structural Fund) 16/09/2018
3
Market with great potential
Minesto’s ability to produce cost-efficient electricity at low velocity sites significantly expands the market potential, the market is valued to €250 billion in annual electricity sales Minesto tidal market World market ocean currents Minesto’s products have a global market potential to generate electricity for £135 billion in annual yield. Complementary market – Ocean currents Kuroshio Current Taiwan: 19GW ( units) Kuroshio Current Japan: 8GW ( units) Florida Current: 27GW( units) Australian Current: 18GW ( units) “The Deep Green technology is able to operate economically at sites where no other renowned technology has been identified” 16/09/2018
4
Global potential and government support
USA - 250 TWh/year* - 25% renewables by 2025 - Feed in tariffs Canada MW* - 250MW marine by 2020 PRC -14GW* 15% renewables by 2020 Investors Japan - 22GW* - 10% renewables by 2020 Korea - 288,000 tonnes of oil-worth* - 16% marine by 2024 Europe - 20GW* - 20% renewables by 2020 - Horizon 2020 Chile - $25M investment in marine - High electricity costs Potential market is substantial Minesto expands the practical resource beyond those numbers! * Tidal stream potential energy Sources: An overview of ocean renewable energy in China, Yuhe Jiao; DHI study for Minesto; The transition to green energy in China, Japan and Korea, Innovation Norway; Global trends in the emerging ocean energy market, IEA 16/09/2018
5
Markets activities 16 September 2018 CONFIDENTIAL
UK R&D site in Northern Ireland 10MW Demonstration Site in Wales Member on the MSG R-UK Grants from Carbon Trust, DECC, Eurostar 100% of the shares in Minesto UK Norway Vegdirektoratet has identified Deep Green as the most suitable technology Proposed feasibility & demo proposal of €2,5 submitted Japan Established relationships with large OEMs, universities and developers Tidal and Ocean currents Korea Established relationships with large OEMs, universities and developers North America MOU with SNMREC to develop a test site in the Florida Current Discussions for partnership with Worcester Polytechnic Institute Taiwan Seeking joint demonstrator with NTOU Strong awareness of potential with ocean currents China Longyuan Power Group Corporation Ltd China Three Gorges Corporation Power China Hydrochina Chile MoU under development with Green elements Discussions with local governments and IADB for funding South Africa Detailed projects discussion with University of Stellenbosh and TIA Site identified Maldives UN lead project worth €7M to install 1 MW Minesto have quoted work of approximately €1M for project dev. China More than 4000MW potential with a 10% SIF Manufacturing capabilities Advisor and share holder based in Hog Kong 16 September 2018 CONFIDENTIAL
6
UK – the Leading Market in Europe
Strangford Lough – Northern Ireland 1:4 test installation R&D test platform Performance & reliability optimization O&M process development Commercial sites identified Holy Head Deep - Wales 10 MW Demonstration Array Agreed Discussion on a €20M project with 50% match funding from WEFO Working relations with PMSS, Bangor Uni, SEACAMS, Swansea Uni UK perspective Member of the Marine Strategy Group- RUK since 2008 Working relationship with gov. bodies; DECC, Carbon Trust, Crown Estate, WEFO Working relationship with Bangor, Strathclyde, Swansea and Queens Uni Supply chain for manufacturing, installation and Site Development Joint EUROSTAR project with Atlantis Resource Corporation for wing development Isle of Wight – SOLENT 30MW site developed by TB Partners LLB and Isle of Wight Council Possible for a 5MW “plug and play” solution for Minesto 16 September 2018 CONFIDENTIAL
7
Our Plan: Holyhead Deep 10MW installed 2019
Project Installed capacity: 10MW Installed devices: 20 DG500 Project financials Project cost: €60M IRR: 7-15% September 16, 2018 CONFIDENTIAL
8
The competitive landscape
1st generation technologies ‘Underwater wind turbines’ Strong corporate backing Absorbed ‘first-mover’ costs 2nd generation technologies Diverse technologies Demonstration stage or earlier Minesto complements 1st gen tech Marine Current Turbines Rated Power: 1.2MW Rated velocity: 2.4+ m/s Corporate backer: Siemens Scotrenewables Rated Power: 2MW Rated velocity: 2.5 m/s Corporate backers: ABB, Fred Olsen Andritz Hydro Hammerfest Rated Power: 1MW Rated velocity: 2.2 m/s Corporate backer: Andritz Hydro Open Hydro Rated velocity: 2.6 m/s Corporate backers: Bord Gais, DCNS Flumill Rated Power: 4MW Rated velocity: n/a Corporate backers: none Ocean Current Generation System Corporate backers: IHI, Toshiba, Mitsui ORPC Rated Power: 0.5MW Rated velocity: 3 m/s Minesto Rated velocity: 1.5 m/s 16/09/2018
9
Deep Green – how it works
Illustration of Deep Green in action 75% of tidal current energy is in the upper 50% of the water column A tether attaches the turbine to the seabed and delivers electricity to the grid The figure-of-8 flight path is controlled by a rudder attached to the plant Specifications Wing Span 12 Meters Rotor Diameter 1m Tether Length 65m or more Rated Power 1.6m/s Desired Velocity 1,4 m/s or more Installation Depth 50 m or more Devices/km2 18-26 Weight 7 tons 16/09/2018
10
Test plan Surface mounted Seabed mounted 16 September 2018
CONFIDENTIAL
11
Electricity production in low velocities
Depth: 80m Current velocity: 1.5m/s 75% of the energy is in the upper 50% of the water column… … and 25% is in the lower 50% Deep Green Wing span: 12m Tether length: 90m Diameter: 18m Hub height: 28m Scaled up Diameter: 32m Hub height: 60 16/09/2018
12
What are the cost drivers?
Site Accessibility Significant lower max peak Lower flows = Less turbulence Cable laying Installation & O&M windows OPEX Small vessel decreases cost Smaller devices enhance the mobilization and service speed Most service can be made on land CONFIDENTIAL 16 September 2018
13
Deep Green – competitive advantages
Unlocks new tidal market Only known technology that operates cost-efficiently using low velocity tidal streams ( m/s) High efficiency Kite motion accelerates water flow through the turbine, significantly increasing energy production Small size and weight Each unit weighs 7 tonnes, times less per MW than competing technologies Low-cost offshore operations Able to use smaller and cheaper vessels for O&M and installation than competing technologies Utilisation of ocean currents Tidal energy competitor comparison 16/09/2018
14
Proven technology in real conditions
Complete power plant installed Focus on performance and design freeze Most cost effective R&D platform in the industry
15
Competitive with conventional technology
Why? Half CAPEX cost 1000 times the energy (energy output proportional to velocity cubed) Small vessels used for operation and maintenance Remote Islands CfD until 2019 CfD after 2019 NEDO Phase 1 NEDO Phase 2 13 November 2013 CONFIDENTIAL
16
Deep Green – technology roadmap
QuappenKite 2006 Prototype tests Proved kite steering control system SeaKite I 2009 Tank tests at SSPA and marine tests, Netherlands Proved electricity production SeaKite II 2011 1:10 scale ocean trials Consistent power production Environmental impact assessed Deep Green Ocean 1:4 scale, handled scale up Power performance proven to 69%. 100% by November 2014 Use of components from proven manufacturers Survivability analysis FMEA and HAZOP testing SIMLOX used to simulate O&M Deep Green Utility 2016 1:1 scale Deep water installation O&M and decommissioning Deep Green Array Integrate in infrastructure Inter array cabling 1 3 5 7 8 9 Deep Green technology has been extensively tested over the last 8 years. This has proven power generation, demonstrated environmental safety, and de-risked the technology. Minesto is now looking to install and verify a full-scale plant to produce power to a grid 16/09/2018
17
Deep Green – Intellectual property
Patents granted Australia, Canada, China, Japan, Mexico, New Zealand, South Africa, South Korea and USA Patents pending EPO (Europe), Chile, Ecuador and Taiwan Active protection Minesto continues to protect disruptive innovations Control Method 1:4 prototype currently installed in Northern Ireland Main patent Control Systems Wing & Turbine Configuration Multiple Torque Controlled Turbine Tether Spring/ Pump Multiple Wings Water Lubricated Bearing Tether Method 16/09/2018
18
Business plan 2014 2015 2016 2017 2018 2019 2020 Funding Licensing
Public funding Private funding IPO in 2017 International funding opportunities Licensing Geographical licensing Initial payment royalty fees Site development Assessment Modelling Product sales Deep Green sales Commercial arrays Additional units Spare parts Asset management Minesto is planning to be cash-flow positive by This is based on on-going licensing contracts, the sale of a 10MW commercial array and contracts for future commercial arrays 16/09/2018
19
Use of funds Minesto requires €40M+ to manufacture, install and operate a 1.5MW array by An investment of €20M is required to achieve this goal. This will be matched by a number of grants, which are currently pending: €20M matched grant funding from Welsh Government body WEFO €8M in pending applications for grants from Horizon 2020 and Climate-KIC In 2017 Minesto will be producing electricity to consumers, have a customer ready to purchase 20 devices and be ready for an IPO or industrial exit. 16/09/2018
20
Contact Minesto AB Vita gavelns väg 6 426 71 Västra Frölunda
Telephone: +46 (0) 16/09/2018