Presentation is loading. Please wait.

Presentation is loading. Please wait.

Kevin Burkett Harvard University June 12, 2001

Similar presentations


Presentation on theme: "Kevin Burkett Harvard University June 12, 2001"— Presentation transcript:

1 Kevin Burkett Harvard University June 12, 2001
Status of CDF-II Kevin Burkett Harvard University June 12, 2001 Kevin Burkett, FNAL Users' Meeting - June 12, 2001

2 Outline 2001: Run II has begun Last collisions were in 1996
Goals for Run II What’s new in the CDF experiment How are things working so far Kevin Burkett, FNAL Users' Meeting - June 12, 2001

3 Kevin Burkett, FNAL Users' Meeting - June 12, 2001
Goals of CDF in Run II Physics Goals: Understanding electroweak symmetry breaking - Higgs Boson Study CP violation and CKM Matrix in B system - sin2b, BS mixing Precision Electroweak Physics – W Boson, Dibosons Top physics – top quark properties, single top production Searches for new phenomena – SUSY, Large Extra Dimensions, … Detector Capabilities Handle 132 ns crossing rate Integrated tracking system Precision vertex information Ability to trigger on secondary vertices, hadronic B decays Kevin Burkett, FNAL Users' Meeting - June 12, 2001

4 Kevin Burkett, FNAL Users' Meeting - June 12, 2001
CDF-II Experiment Detectors retained from CDF Run I Central, wall calorimeters Central, extension muon detectors New in Run II Tracking Systems Silicon tracking system Central Outer Tracker End plug calorimeter Cerenkov Luminosity Monitor Forward muon detectors Scintillator time of flight Front-end electronics (132 ns) Pipelined trigger, DAQ All new software MUON CHAMBERS(CMP) CMX COT .5 1.0 1.5 2.0 2.5 3.0 END WALL HADRON CAL. Inner silicon 6 layers 3 30 SOLENOID Intermediate silicon 1 or 2 layers = 1.0 = 2.0 n END PLUG EM CALORIMETER END PLUG HADRON CALORIMETER = 3.0 m EM CALORIMETER HAD CALORIMETER TOF MUON CHAMBERS(CMU) Kevin Burkett, FNAL Users' Meeting - June 12, 2001

5 Kevin Burkett, FNAL Users' Meeting - June 12, 2001
CDF-II Detector MUON CHAMBERS(CMP) Solenoid retained from Run I New drift chamber(COT) 96 layers 3d silicon tracking 7 layers in central region 8 layers in forward Scintillating tile plug calorimeter covers to |h|=3.6 CMX COT .5 1.0 1.5 2.0 2.5 3.0 END WALL HADRON CAL. Inner silicon 6 layers 3 30 SOLENOID Intermediate silicon 1 or 2 layers = 1.0 = 2.0 n END PLUG EM CALORIMETER END PLUG HADRON CALORIMETER = 3.0 m EM CALORIMETER HAD CALORIMETER TOF MUON CHAMBERS(CMU) Kevin Burkett, FNAL Users' Meeting - June 12, 2001

6 Silicon Detector (Side View)
Kevin Burkett, FNAL Users' Meeting - June 12, 2001

7 Kevin Burkett, FNAL Users' Meeting - June 12, 2001
Data taken with CDF-II CDF rolled in early September 2000 for the commissioning run Prototype silicon (60o), ~65% COT electronics coverage 5 stores 10/3/00 – 11/4/00, 1p x 8pbar and 36p x 36pbar Peak luminosity ~ 1029 CDF rolled back in February 2001 for the start of Run II 2 1p x 8pbar stores 4/3/01-4/5/01 Peak Luminosity ~ 1028 1 36p x 36pbar store 4/27/01 Peak luminosity ~ 1030 ~10 nb-1 written to tape Latest running started last Thursday Data used extensively to evaluate performance Kevin Burkett, FNAL Users' Meeting - June 12, 2001

8 Kevin Burkett, FNAL Users' Meeting - June 12, 2001
CDF Detector Roll-In Kevin Burkett, FNAL Users' Meeting - June 12, 2001

9 Calorimeter, Shower Max Extension, Forward Muon
CDF-II Status (June 1) Sub-system Instrumented Operational Luminosity Monitor 100% Silicon : L00,SVX ISL 95% 67% COT Calorimeter, Shower Max Central Muon Extension, Forward Muon 90%, 50% Time-of-Flight 8% Level-1 Level-2 80% commissioning Level-3 developing filters Data Logging full rate (20 Mb / sec) Offline being tuned with data Kevin Burkett, FNAL Users' Meeting - June 12, 2001

10 Kevin Burkett, FNAL Users' Meeting - June 12, 2001
COT Performance COT Event Display Single Hit Resolution s ~ 200mm (Goal 180mm) -0.2 cm 0.2 cm Kevin Burkett, FNAL Users' Meeting - June 12, 2001

11 Kevin Burkett, FNAL Users' Meeting - June 12, 2001
COT Performance Conversions Some Simple Measurements: (commissioning run data, Level 3 tracking) Ks  p+p- m = 499 ± 0.2(stat) MeV/c2 L  p+p- m = 1116 ± 0.1(stat) MeV/c2 Kevin Burkett, FNAL Users' Meeting - June 12, 2001

12 Silicon Performance: Beam Line
Impact parameter (d0) will show a sinusoidal f-dependence if the true beamspot is different from the nominal Plot d0 vs. f, fit beamspot Compare: Offline silicon tracks Silicon Vertex Tracker (SVT) Runs online Used in Level 2 Secondary Vertex Trigger True Beamspot d0 d0 Nominal Beamspot x=0,y=0 Kevin Burkett, FNAL Users' Meeting - June 12, 2001

13 Silicon Performance: Beam Line
Silicon Online (SVT) d0(cm) f=0 f=360o Silicon Offline d0(cm) f=0 f=360o Offline: x=-1.3mm y=4.1mm SVT : x=-1.5mm y=4.3mm Kevin Burkett, FNAL Users' Meeting - June 12, 2001

14 COT Performance: Beam Line
COT Offline D0(cm) f=0 f=360o Can do the same thing with COT offline tracks and the XFT hardware tracker For the XFT, a shift in the beamspot can be seen as a shift in the PT bin XFT DPT f=0 f=360o Kevin Burkett, FNAL Users' Meeting - June 12, 2001

15 Tracking Performance: COT + Silicon
COT Outside-In tracking: Start with COT track Extrapolate inward and add silicon hits Compare impact parameter COT only vs. COT+Silicon Corrected for beam offset COT+SVX COT Only Kevin Burkett, FNAL Users' Meeting - June 12, 2001

16 Calorimeter Performance
April Collision Data million events Jet ET (GeV) Jet h New Plug Kevin Burkett, FNAL Users' Meeting - June 12, 2001

17 Muon System Performance
Old muon chambers New reconstruction code Kevin Burkett, FNAL Users' Meeting - June 12, 2001

18 Kevin Burkett, FNAL Users' Meeting - June 12, 2001
Trigger Performance Level 1 Triggering on jets, tracks, electrons, muons, SET, Missing ET XFT Df= 6 mrad (Goal 8 mrad) Level 2 Tagging trigger decision based on jets, SET, Missing ET Decisions made correctly Df(XFT-Offline) Kevin Burkett, FNAL Users' Meeting - June 12, 2001

19 Kevin Burkett, FNAL Users' Meeting - June 12, 2001
Interesting Events 1st W  en Candidate Missing ET 38 GeV Kevin Burkett, FNAL Users' Meeting - June 12, 2001

20 Kevin Burkett, FNAL Users' Meeting - June 12, 2001
Interesting Events 3 Jet Event Kevin Burkett, FNAL Users' Meeting - June 12, 2001

21 Kevin Burkett, FNAL Users' Meeting - June 12, 2001
Conclusions 2001: Run II is happening What’s new in the CDF experiment? Almost everything How are things working so far? Excellent When do we expect first results? Summer 2002 Kevin Burkett, FNAL Users' Meeting - June 12, 2001


Download ppt "Kevin Burkett Harvard University June 12, 2001"

Similar presentations


Ads by Google