1 F. Ronchetti, INFN-LNF, September 20 2017
Infrastructure Main building compressor 27 kW: ongoing Backup compressed air line for the CMM: installation ongoing Extra pump for redundancy and improved tooling vacuum: pump arrived, installation this week, checked yesterday HS and Stave cooling circuit: orders ongoing, checked today … Electrical, vacuum and networks services for HIC cutting table: done Tooling HS soldering table: done Stave/power bus soldering table: arriving from Torino Legs for soldering table: being ordered (monopixel) FPC-FPC bridge holders and FPC metallized bridges : arriving from Torino HB qualification: ongoing, some discrepancy found Tower1: qualification and shimming ongoing Tower2: news screws needed for smoother electric contact HIC landing Power Boards: 2 available HIC, HS, Stave readout adapters: arrived Stave assembly jig rails and carriages: order placed (finally!) Functional HIC for readout tests: available HIC mosaic board: back from Bari HMP 4040 and 2030 power supplies: fast order placed Special crates for Stave and HIC/HS: sent from CERN Eccobond glue: arrived at CERN (Marco will bring it to LNF) Next: Ongoing this week: production of 1 HS with FPC-padchips dummies: alignment, gluing, soldering. Next week SF alignment (without glue). Start functional HIC readout setup and test. mechanical stave realistic FPC dummies being sent: 5 from Strasbourg. Aim to be ready to assemble-test Stave-0 at the beginning of October Production shifts from mid October. F. Ronchetti, INFN-LNF, September

2 HS Assembly with FPC-padchips Dummies

3 HS Assembly with FPC-padchips Dummies


Download ppt "F. Ronchetti, INFN-LNF, September"

Similar presentations


Ads by Google