1 TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
REFURBISHMENT AND TILING OF AN EXISTING FIBREGLASS OUTDOOR POOL

2 TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
REMOVAL OF EXISTING FIBRERGLASS LINER AND MOSIAC TILING OF POOL, PAINTING OF CONCRETE TILE SURROUND, ACID AND HOT WASH OF EXISTING FLAGS, FITTING NEW DOSING SYSTEM, REPAIR TO PIPEWORK, NEW POOL COVER, IMPROVEMENT TO CLEAN WATER DISTRIBUTION SYSTEM

3 TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
THE FIBREGLASS LINED POOL THE START OF THE PROJECT

4 TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
ALL THE EXISTING FIBREGLASS LINING (510 SQUARE METRES) HAD TO BE REMOVED – THIS WAS A PAINSTAKING PROJECT

5 TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
SHOWN IS ONE OF OUR OPERATIVES PAINSTAKINGLY REMOVING THE GLASS LINING AND SCABBLING THE NEWLY EXPOSED WALLS TO ENSURE CORRECT THOROUGH PREPARATION

6 TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
COMMENCEMENT OF MOSAIC TILING TO SHALLOW END

7 TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
PREPARED DEEP END FLOOR BEING THOROUGHLY CLEANED PRIOR TO BEING TILED

8 TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
SHOWN IS THE POOL DEEP END IN THE PROCESS OF BEING MOSAIC TILED IN “POOL BLUE”

9 TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
ONE OF OUR OPERATIVES QUALITY CHECKING AN AREA OF POOL WHICH HAS BEEN GROUTED

10 TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
SHOWN IS ONE OF OUR FEMALE OPERATIVES GIVING THE FINISHED SHALLOW END THE “WOMANS TOUCH” PRIOR TO POOL FILLING

11 TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
BEFORE AND AFTER PICTURES OF SURROUND TILES

12 TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
ACID AND HOT JET WASHING OF SURROUNDING FLAGS BEFORE AND AFTER

13 TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
THE POOL BEING SLOWLY FILLED

14 TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
THE FINISHED POOL DURATION APPROX 5 WEEKS FROM START TO FINISH

15 TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
BEFORE AND AFTER – WHAT A TRANSFORMATION ON TIME AND IN BUDGET!!

16 TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
Comments made by Mr Mark Hart “Operations Manager” of the School “Thank you very much for all you have done for us to date an excellent job, I very much look forward to working with you all again”