Presentation is loading. Please wait.

Presentation is loading. Please wait.

IEEE 1914 NGFI IEEE RoE TF Closing Report

Similar presentations


Presentation on theme: "IEEE 1914 NGFI IEEE RoE TF Closing Report"— Presentation transcript:

1 IEEE 1914 NGFI IEEE 1914.3 RoE TF Closing Report
TF Chair: Richard Tse, Microsemi Editor: Richard Maiden, Intel WG Chair: Jinri Huang Dec 7, 2017 Suzhou, China

2 Compliance with IEEE Standards Policies and Procedures
Subclause of the IEEE-SA Standards Board Bylaws states, "While participating in IEEE standards development activities, all participants...shall act in accordance with all applicable laws (nation-based and international), the IEEE Code of Ethics, and with IEEE Standards policies and procedures." The contributor acknowledges and accepts that this contribution is subject to The IEEE Standards copyright policy as stated in the IEEE-SA Standards Board Bylaws, section 7, and the IEEE-SA Standards Board Operations Manual, section 6.1, The IEEE Standards patent policy as stated in the IEEE-SA Standards Board Bylaws, section 6, and the IEEE-SA Standards Board Operations Manual, section 6.3,

3 Next Generation Fronthaul Interface
IEEE 1914 Next Generation Fronthaul Interface Jinri Huang, IEEE RoE TF Closing Report Date: Author(s): Name Affiliation Phone [optional] [optional] Richard Tse Microsemi

4 Progress during this meeting
Decisions were made on how to address all comments received for D2.1 except Comment#21 on PICS CNM1 is postponed. RichardT and RichardM will check with JouniK on the meaning of the questionable statement. Richard Maiden gave a presentation (tf3_1712_maiden_unoccupied_RB_3.pptx) on how to identify which Resource Blocks are mapped into a flow, which allows one to not send unused RBs Motion was made to move the draft to sponsor ballot immediately after the editor resolves the comments This motion was passed with 9 Yes, 0 No, and 0 Abstain

5 Progress during this meeting
Lujing Cai gave a presentation that proposed the functional splits 7.2 and 7.3 should be fully supported in version 2 of P This will be considered when we start version 2. Version 2 must wait for version 1 to be approved before it can start.

6 Next Steps Editor releases D3.0 draft
WG chair initiates the Sponsor Ballot processes (see Teleconferences to discuss possibilities for v2 will start in Jan 2018


Download ppt "IEEE 1914 NGFI IEEE RoE TF Closing Report"

Similar presentations


Ads by Google