Presentation is loading. Please wait.

Presentation is loading. Please wait.

Campus Construction Projects

Similar presentations


Presentation on theme: "Campus Construction Projects"— Presentation transcript:

1 Campus Construction Projects
SAN DIEGO COLLEGE Campus Construction Projects August 21, 2008

2 Completed Construction Projects
LRC “Down Under” Classrooms ModVille Military Education Mods

3 Projects Under Development
Academic Success Center P Building Renovation Career Technology Center Arts & Humanities Building Business Technology Building Sciences Building General Purpose Classroom Building Central Plant Expansion Property Acquisition

4 SAN DIEGO COLLEGE 16th Street Precise Plan August 21, 2008

5 2005 Campus Master Plan “A Unified Campus” Embrace & Enhance a
Collegial Environment Attractive, Diverse Outdoor Spaces Welcoming Campus Gateways Symbolic Presence & Strong Identity Link Campus Areas Park Blvd 16th Street Russ Street A Street B Street B Street C Street Park Blvd. C Street 13th Street 14th Street 15th Street 16th Street 17th Street Existing Buildings Broadway Broadway

6 2005 Campus Master Plan Campus for 25,000 students
Academic Neighborhoods Integrated Parking Consideration for Topography & Landscape Safety and Accessibility Multi-Story Campus Buildings Phased Growth Plan Park Blvd 16th Street Russ Street A Street B Street B Street C Street Park Blvd. C Street 13th Street 14th Street 15th Street 16th Street 17th Street Existing Buildings Broadway Broadway

7 2005 Neighborhood Connections Academic Neighborhoods 16th Street
Centers Way-finding/ Accessibility Activate Internal & Peripheral Pathways Access Points & Community Connection Expansion & Growth Strategy Park Blvd 16th Street Russ Street A Street B Street B Street C Street Park Blvd. C Street 13th Street 14th Street 15th Street 16th Street 17th Street Broadway Broadway

8 2005 Campus Master Plan Campus Environment Strategy 16th Street
Pedestrian Pathways Major Gathering Places Secondary Courtyards & Gardens Landscape Lighting & Signage Safety and Accessibility Architectural Character Park Blvd 16th Street Park Boulevard Green B Street C Street Enhanced Crosswalk Broadway

9 2005 Facilities Master Plan Coordinate Approved B Street
Bond Funded Projects Incorporate Infrastructure & Parking Needs Outline a Comprehensive Development Area Park Blvd 16th Street B Street 16th Street Precise Plan Study Area C Street Broadway SAN DIEGO COLLEGE

10 2008 Facilities Master Plan Update Validate Academic B Street
Program Needs Establish Building Sizes & Locations Strategize Topography & Accessibility Outline a Comprehensive Construction Plan Park Blvd 16th Street B Street 16th Street Precise Plan Study Area C Street Broadway SAN DIEGO COLLEGE

11 16th Street Precise Plan Study Area B Street academic buildings
T Building A Building academic buildings 6 new facilities 2 modified buildings open space network structured parking 6 locations 2,050 spaces topography & accessibility L Building B Street C Building C Street Broadway 16th Street SAN DIEGO COLLEGE

12 Academic Programs B Street 5b 5a B Street 4b 2 4a C Street B Street 3
A Building 5b 1 Career Technology Center 2 Child Development Center 3 General Purpose Classroom Building 4a Arts & Humanities 4b Business Technology 5a Sciences 5b Engineering Technology (renovated T Building) 5a L Building B Street C Building 4b 2 4a C Street B Street 3 1 Broadway 16th Street SAN DIEGO COLLEGE

13 Master Plan Design Principles B Street create a campus “outdoor space”
A Building create a campus “outdoor space” network L Building B Street C Building create campus gateway experiences C Street B Street respect the city’s urban street edges Broadway 16th Street SAN DIEGO COLLEGE

14 Pedestrian Circulation B Street “on-grade” pedestrian paths of travel
A Building “on-grade” pedestrian paths of travel L Building B Street planned elevator circulation C Building planned bridge connection C Street B Street 16th Street Broadway SAN DIEGO COLLEGE

15 Vehicular Circulation B Street B Street B Street
A Building existing street system L Building parking access B Street C Building C Street B Street Broadway 16th Street SAN DIEGO COLLEGE

16 Buildings & Landscape B Street P P 5b 5a B Street 4b P 2 4a P C Street
A Building 1 Career Technology Center 2 Child Development Center 3 General Purpose Classroom Building 4a Arts & Humanities 4b Business Technology 5a Sciences 5b Engineering Technology P Parking 5a L Building B Street 4b C Building P 2 4a P C Street P P 3 1 Broadway 16th Street SAN DIEGO COLLEGE

17 Engineering Technology
Sciences & Engineering Technology Russ Boulevard Parking A Building Engineering Technology Sciences Building Key Map L Building 16th Street B Street SAN DIEGO COLLEGE

18 Arts/Humanities & Business Technology B Street Key Map 16th Street
C Building Key Map Saville Theatre Arts & Humanities 16th Street C Street SAN DIEGO COLLEGE

19 Career Technology, General Classroom & Child Development C Street
Parking Child Development Center C Street Key Map Parking Parking Career Technology Center General Purpose Classrooms 16th Street 17th Street Broadway SAN DIEGO COLLEGE

20

21 16th Street Precise Plan: “A Unified Campus” B Street B Street
Great Collegial Environments Linked Campus Areas Academic Neighborhoods Integrated Parking Consideration for Topography & Landscape Safety and Accessibility Phased Growth Plan B Street C Street Broadway 16th Street SAN DIEGO COLLEGE

22 SAN DIEGO COLLEGE


Download ppt "Campus Construction Projects"

Similar presentations


Ads by Google