Presentation is loading. Please wait.

Presentation is loading. Please wait.

Activities of Solar Keymark Network (SKN)

Similar presentations


Presentation on theme: "Activities of Solar Keymark Network (SKN)"— Presentation transcript:

1 Activities of Solar Keymark Network (SKN)
Jan Erik Nielsen, March 27nd 2017

2 Status for licences Year Collectors Systems Storage Controller Total
2014 1586 190 1776 2015 1427 197 1624 2016 1352 174 1526 2017 1253 172 5 1435

3 Standards behind Solar Keymark
. Standards behind Solar Keymark Solar Keymark standards EN Thermal solar systems and components - Solar collectors - Part 1: General Requirements EN ISO Solar Energy - Solar thermal collectors - Test methods EN Thermal solar systems and components - Factory made systems - Part 1: General requirements. EN Thermal solar systems and components - Factory made systems - Part 2: Test methods

4 Standards behind Solar Keymark
. Standards behind Solar Keymark Solar Keymark standards (continued): EN Thermal solar systems and components - Custom built systems - Part 1: General requirements for solar water heaters and combisystems EN Thermal solar systems and components - Custom built systems - Test methods for solar water heaters and combisystems EN Thermal solar systems and components - Custom built systems - Part 3: Performance test methods for solar water heater stores EN Thermal solar systems and components - Custom built systems - Part 4: Performance test methods for solar combistores EN Thermal solar systems and components - Custom built systems - Part 5: Performance test methods for control equipment

5 Standards behind Solar Keymark
. Standards behind Solar Keymark Solar Keymark can soon be used for absorber surfaces EN ISO Solar energy -- Collector components and materials -- Part 3: Absorber surface durability

6 Current issues New complaint procedure - included in latest version of SK scheme rules Strategy / promotion

7 New complaint process/procedure
Step 0: Complain to directly to party in question If issue not solved … proceed to Step 1 Step 1: Appeal to SKN Head of CB - and SKN Complaint Committee See next slide. If issue not solved … proceed to Step 2 Step 2: Appeal to Keymark Management Organisation (KMO) - own/CEN procedures: “CEN Internal Regulation Part 4” If issue not solved … proceed to Step 3 Step 3: Appeal to CEN-CENELEC Own/CEN procedures: “CEN Internal Regulation Part 4”

8 New complaint process/procedure
Step 1: Appeal to SKN Head of CB who will begin an investigation together with the Complaint Committee: - SKN Chair - SKN Manager - Test lab representative - CB representative (Head of CB) - ESTIF representative Time for respond 1 month, either result of investigation or clear action plan Step 2 KMO …

9 Others things Keymark logo subject to change ? - present proposal (from Heat Pump group): estesc opinion?

10 SCF - Solar Certification Fund
Annual call for projects related to solar thermal standards and certification Approx € for 2017 (down from €) Public project results (to be) published on Solar Keymark web

11 Solar Keymark Network Chairman: Jaime Fernandez, AENOR
Manager: Jan Erik Nielsen Administration: ESTIF Secretariat Bi-annual meetings - in future one physical meeting and one web-meeting (?) Next meeting October October, Cyprus

12 Further information Web: Mail: Mail:


Download ppt "Activities of Solar Keymark Network (SKN)"

Similar presentations


Ads by Google