LOMPOC UNIFIED SCHOOL DISTRICT BOARD OF EDUCATION UPDATE

Similar presentations


Presentation on theme: "LOMPOC UNIFIED SCHOOL DISTRICT BOARD OF EDUCATION UPDATE"— Presentation transcript:

1 LOMPOC UNIFIED SCHOOL DISTRICT BOARD OF EDUCATION UPDATE
5/25/04 Summer 2004 Projects Modernization Schedule Current Tasks

2 SUMMER 2004 PROJECTS 1. Roofing a. Crestview Elementary School
b. Hapgood Elementary School c. La Honda Elementary School d. Los Padres Elementary School 2. Lompoc High School Parking Lot Paving

3 SUMMER 2004 PROJECTS 3. Vandenberg Middle School Technology
4. Wide Area Network – District Wide 5. District-Wide Phone System 6. Lompoc Valley Middle School Shade Structure 7. Interim Portable Classroom Planning

4 MODERNIZATION SCHEDULE
Series One Schools – Construction First Quarter 2005 Fillmore Elementary School Submitted to DSA 4/20/04 Clarence Ruth Elementary School Submitted to DSA 4/20/04 La Canada Elementary School Submitted to DSA 4/20/04 Lompoc Valley Middle School Submit to DSA 6/15/04 Lompoc High School Submit to DSA 7/7/04

5 MODERNIZATION SCHEDULE
Series Two Schools Crestview Elementary School Submit to DSA 7/15/04 Buena Vista Elementary School Submit to DSA 7/15/04 Los Berros Elementary School Submit to DSA 7/15/04 Hapgood Elementary School Submit to DSA 7/15/04 Vandenberg Middle School Submit to DSA 6/15/04 Cabrillo High School Submit to DSA 7/7/04

6 MODERNIZATION SCHEDULE
Series Three Schools Los Padres Elementary School Submit to DSA 7/15/04 Miguelito Elementary School Submit to DSA 7/15/04 La Honda Elementary School Submit to DSA 7/15/04 El Camino Middle School Submit to DSA 6/15/04 Maple High School Submit to DSA 7/7/04

7 RECENT ACTIVITY Site Reviews - All Phase One Sites
On site reviews with principals and staff Final interim housing review Review technology work Summer 2004 on-site drawing back-check

8 CURRENT FOCUS 5/12/04 Cost Estimate Report – Budget Review
Six Elementary Schools Los Berros, La Canada, Fillmore, Clarence Ruth, Buena Vista, and Los Padres. Based on DSA submittal drawings. Three High Schools Estimates are based on the 50% drawing submittals. The detailed estimates are now being reviewed by each engineering consultant. Back check exercise. Revising the scope to match the overall budget and still maintain equity between the sites.

9 BUDGET ADJUSTMENT 100% infrastructure is currently included
10% market factor Value engineering Bid alternatives Bundling

10 TEAM GOALS It is critical to stay on schedule with all DSA submittals.
The design team is looking at ways to meet the budget. Meeting with general contractors. Reviewing each sites greatest need.

11 Kruger Bensen Ziemer Architects, Inc.
Thank You. Kruger Bensen Ziemer Architects, Inc. 30 West Arrellaga Street, Santa Barbara, CA Phone: 6477 Telephone Road, Ventura, CA Phone:

12 Goleta Union School District bid results from 9/16/03
RECENT BIDS Goleta Union School District bid results from 9/16/03 Hollister Elementary School (4) Bids – Bid Date: 9/4/01 Average Bid = $1,100,000.00 Finished Cost = $1,056,204.00 Kellogg Elementary School (5) Bids – Bid Date: 6/5/02 Average Bid = $1,140,000.00 Finished Cost = $1, La Patera Elementary School (1) Bid – Bid Date: 7/8/03 A.J. Diani = $1,785, (3) Bids – ReBid Date 9/16/03 A.J. Diani = $1,920,000.00 F. Schipper = $1,866,249.00 Carroll = 1,774,577.00

13 RECENT BIDS San Marcos High School Field restroom renovation
Bid Date 1/15/04 $159,000 Rebid Date 5/20/04 $208,814 ≈ 30% increase