Download presentation
Presentation is loading. Please wait.
1
Beaver River Watershed PCB Investigation
Technical Committee Meeting October 20-21, 2009
2
PCB TMDL Background Completed Ohio River PCB TMDL in 2002
Entire WV border (277 river miles) Mainstem TMDL only Basin is too large and data is too limited to address issue with a single TMDL for entire watershed Assigned allowable loadings to major tributaries Follow-up tributary TMDLs/source reductions necessary to meet WQS in the Ohio River
3
Current Challenge The contamination is wide-spread
TMDL required for the entire Ohio River Identifying specific sources has been difficult Sampling indicates POTWs and numerous types of industrial facilities may discharge PCBs Thousands of potential sources spread over basin Need to focus on a smaller scale Select tributary sub-basin to focus efforts
4
Tributaries of Concern
Identified tributaries of concern based on high-volume sample results Ranked according to yield and load Allegheny Monongahela Beaver Muskingum Kanawha Guyandotte Scioto Great Miami Green Wabash
5
Why the Beaver River Watershed?
Needed smaller area to focus source identification effort 3,130 square miles (Ranks 14th of Ohio R. tribs) Beaver River has elevated PCB levels Highest single sample concentration (19,300 pg/L) Highest average concentration (11,700 pg/L) Fourth highest load Highest PCB yield Interstate tributary
8
Beaver Basin Impairments
Beaver River (Main stem) Entire miles listed as impaired by PCBs TMDL completed 2001 for lower 3.8 miles Mahoning Lower 82 miles listed as impaired by PCBs Shenango Lower 33.1 miles listed as impaired by PCBs TMDL completed in 2001 Connoquenessing Not listed as impaired by PCBs
9
Inventory of Potential Sources
National Priority List (Superfund) 6 NPL sites Toxics Release Inventory 2 facilities 267 potential sources based on SIC These are facility types which were found by DRBC to discharge significant levels of PCBs Met with Ohio EPA and PA DEP personnel to discuss sources and sampling approach
10
Proposed Sampling Approach
Phased sampling approach Conduct initial round of sampling Subsequent rounds based on previous results Focus in on hot-spots First round of sampling Sample each tributary near mouth Beaver, Mahoning, Shenango, Connoquenessing Add additional sites based on sources and impaired segments Following rounds would allow for bracketing of potential sources
11
Sampling (continued) Use high-volume water sampling Sampling Schedule
May only need to filter 250 to 500 liters Would allow for 2 samples to be collected each day Sampling Schedule Begin sampling in November 2009 Takes 4 weeks for preliminary results Select round 2 sites based on results Round 2 in early 2010 Repeat as budget allows Must be completed by June 30, 2010
13
Questions or Comments?
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.