1 Battery Life Test Phase: PVT Date:

2 Battery Life Test Step Step: 1. Set phone in flight mode.
2. Charge battery to full, then remove charger 3. Play music file in speaker mode for an hour (no other application is running during test). 4. Other Phone Setting:  Volume: 50 %  Backlight off LED indicator turns green once battery is full charged

3 Battery Life Verification
Criteria: Check the remaining battery capacity if still over 94% Condition Play MP3 Current consumption Total remaining battery capacity over After six months, battery capacity 1386mAh 60mA 95% After one year, battery capacity 1232mAh After two year, battery capacity 1032mAh 94% Assume one charge cycle per day Remaining battery capacity gives battery information for judgment (Menu path Setting Battery )


Download ppt "Battery Life Test Phase: PVT Date: 2012.12.20."

Similar presentations


Ads by Google