1 FDR readiness & testing plan
R. Gardner 1/21/13

2 Site and redirection status
All monitoring links at Site and redirection status

3 Redirectors

4 Site reporting to monitoring
Display from new UDP collector Most, but not all sites reporting Other small issues to check

5 WLCG transfer dashboard
Data from UDP  ActiveMQ. Some sites missing, some inconsistent labels. Will need to scrub starting from the UDP collector.

6 Testing elements At-large users HammerCloud & WAN-FDR jobs
COMP L E X I T Y At-large users HammerCloud & WAN-FDR jobs (programmatic) Cost matrix (continuous) Basic dashboard functionality (continuous)

7 Site Metrics “Connectivity” – copy and read test matrices
Snapshots per site as sever HC runs with modest job numbers Stage-in & direct read Local, nearby, far-away HC metrics Simple job efficiency Wallclock, # files, CPU %, event rate, Load tests For well functioning sites only Graduated tests 50, 100, 200 jobs vs various # files Will notify the site and/or list when these are launched

8 Site # client sites Local copy (sec) Regional Copy (sec, %LOC) Global copy (sec, %LOC) HC – Job eff HC – CPU% HC - WC HC - event rate (Hz) AGLT2 BNL BU CERN DESY INFN-FRASCATI INFN-NAPOLI INFN-ROMA JINR LRZ-LMU MPPMU MWT2 13 OU PRAGUE RAL PROTVINO SWT2_CPB UKI-LT2-QMUL UKI-LIV-HEP UKI-ECDF UKI-GLASGOW UKI-OX WT2

9 Site copy connectivity tests
MWT2 as server, read from 18 ANALY queues. Accessible by 13 of the 18 queues tested Record for all sites

10 Metrics (global) No. sites, clouds participating
No. ANALY queues tested as FAX-capable Average, peak aggregate rate MB/s Number of jobs from HC tests Number of jobs from WAN-FDR tests

11 Still need to do: Resolve pilot and wrapper issues – verify correct pilots are being sent Finish Hammer Cloud testing for direct access Placement of test datasets (files at LRZ and MWT2 only) Finalize examples for at-large users Setup metrics tables and start gathering statistics