Presentation is loading. Please wait.

Presentation is loading. Please wait.

IEEE Session #57 Geneva, Switzerland Closing Plenary

Similar presentations


Presentation on theme: "IEEE Session #57 Geneva, Switzerland Closing Plenary"— Presentation transcript:

1 IEEE 802.21 Session #57 Geneva, Switzerland Closing Plenary
Month 20xx doc.: IEEE /xxxr0 IEEE Session #57 Geneva, Switzerland Closing Plenary Subir Das sdas at appcomsci dot com Subir Das, Chair WG XXXX, His Company

2 Meeting Updates Task Groups Update Liaison Reports Teleconference
Future Locations Subir Das, Chair, IEEE Subir Das, Chair, IEEE 2010

3 TG Reports 802.21c Single Radio Handovers Task Group
802.21d Multicast Management Task Group 802.21m: Revision Task Group : Media Independent Services Task Group Subir Das, Chair, IEEE

4 Liaison Reports 802.11 Report IETF Report
IETF Report Subir Das, Chair, IEEE

5 Teleconferences 802.21c Teleconferences: 802.21d Teleconferences:
doc.: IEEE /xxxr0 Teleconferences 802.21c Teleconferences: August 13 (Tues), 2013, 9:30- 11:30 am, ET August 20 (Tues), 2013, pm, ET September 10 (Tues), 2013, 9:30- 11:30 am, ET 802.21d Teleconferences: August 07 (Wed), am, ET August 21 (Wed) 8-10am, ET August 28 (Wed) 8-10am, ET 802.21m Teleconference: August 29 (Thurs), 2013, 8-9 pm, ET Teleconference September (Thurs), 2013 , am, US EST Subir Das, Chair, IEEE XXXX, His Company

6 802.21c LB BRC Anthony Chan (Chair) Dapeng Liu Charlie E. Perkins
doc.: IEEE /xxxr0 802.21c LB BRC Anthony Chan (Chair) Dapeng Liu Charlie E. Perkins Yoshihiro Ohba Antonio de la Oliva Hyunho Park Hyeong Ho Lee Subir Das, Chair, IEEE XXXX, His Company

7 P WG Motion Move to authorize the P802.21c Ballot Resolution Committee (BRC) to resolve WG LB6d and LB6e comments and approve the related contributions via teleconferences Move: Anthony Chan Second: Charlie Perkins For: 10 Against: 00 Abstain: 00 Motion Passes Slide 7

8 P WG Motion Move to authorize the P802.21c Editor to incorporate all the resolutions of letter ballot #6c comments into P802.21c /D04 and produce P802.21c/D05 Move: Anthony Chan Second: Charlie Perkins For: 10 Against:00 Abstain: 00 Motion Passes Slide 8

9 P WG Motion Move to authorize the P802.21c Editor to incorporate all the resolutions of letter ballot #6d comments into P802.21c /D05 and produce P802.21c/D06 Move: Anthony Chan Second: Charlie Perkins For: 10 Against: 00 Abstain: 00 Motion Passes Slide 9

10 P WG Motion Motion to authorize the Working Group chair to initiate a LB#6d re-circulation Letter Ballot on the question “Should P802.21c/D05 be forwarded to Sponsor Ballot?” Move: Anthony Chan Second: Charlie Perkins For: 10 Against: 00 Abstain: 00 Motion Passes Slide 10

11 P WG Motion Motion to authorize the Working Group chair to initiate a LB#6e re-circulation Letter Ballot on the question “Should P802.21c/D06 be forwarded to Sponsor Ballot?” Move: Anthony Chan Second: Charlie Perkins For: 10 Against: 00 Abstain: 00 Motion Passes Slide 11

12 P WG Motion Move to authorize the P WG Chair to make a motion to the IEEE 802 Executive Committee for conditional approval to forward the IEEE c Draft for Sponsor Ballot Move: Anthony Chan Second: Charlie Perkins For: 10 Against: 00 Abstain: 00 Motion Passes Slide 12 Subir Das, Chair, IEEE

13 802.21d LB BRC LB7 BRC members: Antonio de la Oliva Toru Kambayashi
Yoshikazu Hanatani Lily Chen Karen Randall Subir Das Yoshihiro Ohba (Chair) Charles E. Perkins MuGM

14 P WG Motion Move to authorize the P802.21d Ballot Resolution Committee (BRC) to resolve WG LB7 comments and approve the related contributions via teleconferences Move: Yoshihiro Ohba Second: Antonio de la Oliva For: 10 Against: 00 Abstain: 00 Motion Passes Slide 14

15 P WG Motion Move to authorize the P802.21d Editor to incorporate all the resolutions of letter ballot #7 comments into P802.21d /D01 and produce P802.21d/D02 Move: Yoshihiro Ohba Second: Antonio de la Oliva For: 10 Against: 00 Abstain: 00 Motion Passes Slide 15

16 P WG Motion Motion to authorize the Working Group chair to initiate a LB#7a re-circulation Letter Ballot on the question “Should P802.21d/D02 be forwarded to Sponsor Ballot?” Move: Yoshihiro Ohba Second: Antonio de la Oliva For: 10 Against: 00 Abstain: 00 Motion Passes Slide 16

17 Future Sessions Subir Das, Chair, IEEE

18 Month 20xx doc.: IEEE /xxxr0 Future Sessions – 2013 Interim: , Nanjing Zhong Shan Hotel, September 2013, Nanjing , China Co-located with all 802 wireless groups Plenary: Nov 2013, Hyatt Regency Reunion, Dallas, TX, USA Co-located with all 802 groups Subir Das, Chair WG XXXX, His Company

19 September, 2013 Interim Session Detils
Month 20xx doc.: IEEE /xxxr0 September, 2013 Interim Session Detils Hotel Early Registration (by July 31) Standard Registration (by Aug 28) Late/Onsite Registration (After Aug 28) Zhongshan Hotel Delegates' registration fee applies only to delegates who will be staying at the meeting venue. US $550 US$700 US$900 Other Hotel Delegates' registration fee applies to all delegates who have not booked their accommodation with arinex, the meeting managers, at the ZhongShan Hotel during the dates of the meeting. US$850 US$1,000 US$1200 Subir Das, Chair WG XXXX, His Company

20 Month 20xx doc.: IEEE /xxxr0 Future Sessions – 2014 Interim: January, 2014, Century Plaza, Los Angeles, CA, USA Co-located with all 802 groups Plenary: March, 2014, China World Hotel, Beijing PRC (Pending) Interim: May 2014, Hilton Waikoloa Village, HI Co-located with all wireless groups Plenary: , July 2014, Manchester Grand Hyatt, San Diego, CA, USA Interim: , September 2014, TBD (Europe or Asia venue) Co-located with all 802 wireless groups Plenary: 2-7 Nov 2014, Grand Hyatt, San Antonio, TX, USA May 2013 Subir Das, Chair WG XXXX, His Company


Download ppt "IEEE Session #57 Geneva, Switzerland Closing Plenary"

Similar presentations


Ads by Google