Presentation is loading. Please wait.

Presentation is loading. Please wait.

Sustainable Growth Through Network Optimization of Eaton Corporation

Similar presentations


Presentation on theme: "Sustainable Growth Through Network Optimization of Eaton Corporation"— Presentation transcript:

1 Sustainable Growth Through Network Optimization of Eaton Corporation
Stanfield Consulting Group Jiayi (Joy) Xu Bijun Cao Chengyu Wang Di Chen Please Name this file as the team name!

2 Agenda (Jiayi Xu) Current Situation Recommendation Short-term Analysis Implementation Plan Long–term Analysis Q&A

3 Current Situation (Jiayi Xu)
Strength Market Penetration Cross-Docking Lean Strategy

4 Current Situation (Jiayi Xu)
Weakness Cross-docking drawbacks Lean strategy drawbacks

5 Recommendation (Jiayi Xu)
Short-Term Recommendation A. Contract a 3rd party distribution center with storage space at Utah(WCDC) B. Expand the DBN at Dallas into a distribution, aggregate planning in Mid-west region. (MCDC) Long-Term Recommendation Construct a new warehouse that set Electrical Sector as priority

6 Short-term Analysis (Chengyu Wang)

7 Implementation Plan (Chengyu Wang)
The 3rd party distributor at Utah (WCDC) Expand DBN at Texas into a distribution center (MCDC) Inventory of AP items Reallocating excessive Kanban

8 Implementation Plan (Chengyu Wang)
The 3rd party distributor & Inventory of AP items West Coast Region CMSCs West Coast Distribution Center (WCDC) Mid-West Region CMSCs Distribution Center (CDC) Mid-West Distribution Center (MCDC)

9 Implementation Plan (Chengyu Wang)
Reallocate Excessive Kanban Inventory Plants MCDC CDC CMSC C External Suppliers WCDC

10 Advantages (Bijun Cao)
Easier to Implement Take Geographic Advantages Aggregate Demand Intercompany Inventory Transfer

11 Advantages (Bijun Cao)
Easier to Implement

12 Advantages (Bijun Cao)
Geographic Advantages West Coast Region CMSCs West Coast Distribution Center (WCDC) Mid-West Region CMSCs Mid-West Distribution Center (MCDC) 15 hours 14 hours

13 Advantages (Bijun Cao)
Aggregate Planning

14 Advantages (Bijun Cao)
Intercompany Inventory Transfer

15 Long-term Analysis (Di Chen)
Construct a new warehouse and set Electrical Sector as priority Location: Utah

16 Advantage (Di Chen) Reduce the CMSC’s inventory level
Upgrade the existing supply chain, improving the efficiency Build a more responsive supply chain without trade off transportation cost for speed

17 Q&A

18 Thank you for being here


Download ppt "Sustainable Growth Through Network Optimization of Eaton Corporation"

Similar presentations


Ads by Google