Update on the Ethernet Network Installation Campaign

Similar presentations


Presentation on theme: "Update on the Ethernet Network Installation Campaign"— Presentation transcript:

1 Update on the Ethernet Network Installation Campaign
F.Ehm BE/CO

2 Target: Collect the network installation requests to streamline the installation work (& costs)

3 Summary of Requests Big Thanks for the prompt input from 11 different teams ! Total 142 network connections requested Expected Time: Some by end of December Majority by end of January Group Purpose # BE/CO OASIS, Timing, Diagnostic Consoles 20 BE/BI BTV, Orbit Feedback 12 BE/RF LLRF, RF Power 14 BE/ABP ELENA Ion Source 2 EN/STI Scraper 4 GS/ASE Access System TE/MPE Magnet Interlock TE/ABT Fast Switches, Septa TE/EPC Power Converter, FGCs 38 TE/VSC Vacuum 4 (2 GPN) TE/MSC B-Train 14 (1 GPN)

4 Network Installation Campaign
Cable Trays will be installed on top of the mezzanine racks Not enough space in the floor Waiting on EN/EL for installing the tray support (end Nov 2015) Network equipment Installation Currently: 2 Technet, 1 General Purpose, 1 Portable Service Installation of 2 additional Switches (TN) More patch panels in rack CY05 Switches move to CY04 Installation of +1 fibre from CY05 to Starpoint in 1 floor (next AD control room) Network installation in starpoint : AD affected. Bertrand Leford contacted, Mid November

5 Network Installation Campaign
Majority of work planned in first two weeks of Dec 2015 Installation depends on availability of company Cables will be ordered now Budget code required for cable trays , fibre Good to be in place: Racks for Access System Racks for Ion Source

6 est. costs 49kCHF  35kCHF = 39% saving
So, what about saving ? est. costs 49kCHF  35kCHF = 39% saving Let’s continue this! Example for one request: 2500CHF for 2cables