1 Wireless Expansion Update and Three Year Plan Considerations
Greg Redder Academic Computing & Networking Services 10/13/09

2 Agenda Review and status update Installation update Where to go next

3 Review and status update
From Dec. 09, 2008 UTFAB meeting… ii. Board expressed interest in seeing this project become recurring with supplemental funding in FY09, and a request to see a full proposal in the spring semester with a three-year project plan. iii. Board endorses plan to upgrade wireless in Clark A and C wings, and in Morgan Library, with replaced access points being used to fix problems in other buildings at ACNS discretion. iv. Motion to set funding level at $180,000, with $90,000 in University matching funds: Approved by unanimous consent v. Final Vote: Approved 8-0

4 Review and status update
From April 14, 2009 UTFAB meeting: Wireless Upgrades (allocated $200, to focus on Eddy, Education, Engineering and Chemistry. Possibly use a hybrid approach of using different density capable wireless routers).

5 Statistics Two sets of statistics: one for each type of wireless network: Xirrus (Morgan, Clark A/C, TILT, CS) Aruba/Cisco (Everywhere else) Have to look at stats from both to get “big picture”

6 Eddy (Last 365 days) Eddy (Last 48 hours)

7 Clark A Clark C

8 Morgan

9 Last 365 days (as of 10/9/09 except Morgan, CS, ClarkA/C)
Last 48 hours (as of 10/9/09 except Morgan, CS, ClarkA/C)

10 All Xirrus (Morgan/CS/TILT/Clark A&C)

11 Statistics Summary (“big picture”)
Roughly 3200 devices connected at peak times.

12 Installation Update Two phases to each project:
Replace existing wireless with high-speed wireless. Enhance density coverage in GA areas Note: Actively working with Xirrus on issues at Library.

13 Installation Update Eddy: Phase 1 completed. Analysis being done for Phase 2. Engineering - A and B wings done for Phase 1 and C in progress. Education and Chemistry by end of semester. Still need to address a deficiency in Plant Sciences pending UTFAB decision/plan.

14 Budget Update $83K left ($73K left + $10K from Athletics)
Note: Education “donated” by Aruba Concentrating on density in GA areas and coverage in rest of facility allowed us to reduce price from $.50/sq-ft to $.20 /sq-ft with Aruba Leveraging Athletics funds for assistance with overall wireless costs such as licensing. Aruba gear: might require more devices and wire pulls. However, won’t require twice as many devices and is less than ½ the cost.

15 Going forward… Prioritization of next buildings which UTFAB would like upgraded.

16 Building Approximate Cost* GA Rooms/Seats 4/217 1/70 1/30 4/134 4/277
(red indicates older wireless) Approximate Cost* GA Rooms/Seats Military Science $2800 4/217 Guggenheim $3400 1/70 Forestry $5500 1/30 Animal Sciences $8100 4/134 Shepardson $9400 4/277 Wagar $9700 5/357 Glover $10,600 2/241 Pathology $11,800 2/200 Physiology $13,000 2/194 Microbiology $13,200 4/261 Natural Resources $14,700 6/324 NESB $15,400 1/35 Plant Sciences $16,400 3/406 Aylesworth $17,344 3/263 MRB $17,600 2/72 Visual Arts $18,400 2/152 Gifford $18,500 5/256 Anatomy Zoology $29,700 3/303 Yates $30,000 1/252 Rockwell??? $26,400 6/353 (old Rockwell) *wire pulls can increase these numbers by up to $200 each pull

17 Questions and thank you!