Presentation is loading. Please wait.

Presentation is loading. Please wait.

Investor Presentation

Similar presentations


Presentation on theme: "Investor Presentation"— Presentation transcript:

1 Investor Presentation
London 2010

2 DISCLAIMER This presentation does not purport to provide all of the information an interested party may require in order to investigate the affairs of IronClad Mining Ltd (Ironclad) nor shall it be construed as a solicitation to buy or sell IronClad securities, or to engage in or refrain from engaging in any financial transaction. In preparing this presentation IronClad did not take into account the investment objectives, financial situation and particular needs of the individual investors. Before making an investment decision on the basis of this presentation, the investor needs to consider, with or without the assistance of a financial advisor, whether the investment is appropriate in light of their particular investment needs, objectives and financial circumstances. This presentation is based on internal company reports and technical information believed to be reliable but IronClad does not make any representation or warranty to its accuracy, completeness or currency. IronClad accepts no obligation to correct or update the information or opinions expressed in it. Opinions expressed are subject to change without notice and accurately reflect the views of IronClad at the time of presenting. This presentation has originated from IronClad Mining Limited. ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

3 CORPORATE STRUCTURE ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

4 Ian Finch – Chairman Neil McKay – Director Peter Rowe – Director
IRONCLAD BOARD Ian Finch – Chairman Neil McKay – Director Peter Rowe – Director ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

5 WORLD LOCATION

6 AUSTRALIA 1000 km N ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

7 HISTORICAL IRON AREA

8 WEEDNANNA IRON (Fe) ‘…this ore body is superior to most of the magnetite projects currently under investigation in Australia.’ Promet Report Nov 2006 ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

9 IRONCLAD ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

10 MAGNETITE COMPARISON IRONCLAD (IFE) MAGNETITE CONVENTIONAL MAGNETITES
1. Magmatic / Crystalline Sedimentary - BIF 2. Coarse Grained (>1mm) Very Fine Grained (< micron) 3. Soft - Low BWI & AI Hard – High BWI & AI - Low maintenance costs High maintenance Cost Minimal Grinding Extensive Grinding - Low power draw - High power draw 5. Very Low level of Impurities Moderate to high level of impurities 6. Ideal Basicity – self-fluxing Variable Basicity – may require fluxing agents 7. High Metal & Weight Low Weight Recovery Recovery ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

11 1,902 150,441m Total holes drilled Total metres drilled
TOTAL EXPLORATION 1,902 Total holes drilled 150,441m Total metres drilled ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

12 *48Mt Indicated and 21Mt Inferred, **198.0 Mt Inferred
UPDATED JORC RESOURCE Wilcherry Hill: 69 Mt* (600Mt - 700Mt) Hercules: 198Mt** (1.0Bt - 1.5Bt) *48Mt Indicated and 21Mt Inferred, **198.0 Mt Inferred ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

13 Production to Commence 2011
PFS / DFS / PRODUCTION Pre-feasibility Study (PFS) Completed December 2009 Definitive Feasibility Study (DFS) Due 4th Qtr 2010 Production to Commence 2011 ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

14 PRODUCTION STAGES STAGE 1(a) STAGE 1(b) STAGE 2 STAGE 3
WILCHERRY HILL DRY DSO IFE 80% TRF 20% 10 Mt Resource* 5-7 Mt Reserve* STAGE 1(b) WILCHERRY HILL WET DSO 60 Mt Resource* STAGE 2 WILCHERRY HILL CONCENTRATE 600 Mt in Ground Potential Resource* STAGE 3 HERCULES 198 Mt Resource* 800 Mt in Ground Potential Resource* * Subject to completion of the updated resource statement and DFS ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

15 Stage1 - Direct Shipping Ore
PRODUCTION STAGES Stage1 - Direct Shipping Ore Export Date: 2011 Output: 2Mt pa Capital Cost: $12 Mill ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

16 Proposed IronClad Plant
STAGE 1(a) – DRY DSO Fines DMS Plant Crushing Plant Tails Lump Proposed IronClad Plant

17 DRY MAGNETIC SEPARARTION
Two stage for FFL Single stage for fines

18 Supply for Construction & Operations
WATER SUPPLY Water defined for Stage1 DSO 7 water bores with 2 Ml/day Supply for Construction & Operations ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

19 STAGE 1b - WET DSO

20 DSO SPECIFICATIONS Fe % (total) - 62.0% SiO2 % - 2.9% Al2O3 % - 2.3%
CaO % % MgO % % Na2O % % K2O % % P % % S % % Mn % % LoI % % ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

21 INFRASTRUCTURE

22 LOGISTICS OVERVIEW Export point - Outer Harbor Adelaide
- Road Transport - Rail Transport Export point - Outer Harbor Adelaide Rail ~ 350km to Adelaide Each train consist of 92 x 40ft wagons carrying ~ 4,900 tonnes Purpose built ore containers (not wagons) Wharfside stacking of containers (3 high) Loading confined to vessels holds ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

23 SIDE TIPPERS ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

24 OUTER HARBOUR OVERVIEW
Bridges Two x 630m rail spurs Container Terminal New container storage area Existing Container Berth Grain Berth 24 24

25 LOADING CONCEPT 4 ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN: 25 25

26 2Mt pa DSO Shipment IRONCLAD MINING
ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

27 First 2 years full production
MARKETING Signed with OMS Trading First 2 years full production Separate China marketing support services contract ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

28 TOTAL COST PER TONNE FOB
INDICATIVE FINANCIALS PROJECT VALUE (AU$) TOTAL COST PER TONNE FOB $55.0 REVENUE PER TONNE FOB $125.0 MARGIN PER TONNE FOB $70.0 ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

29 Stage 2 – Wilcherry Hill Beneficiation
FUTURE PRODUCTION Stage 2 – Wilcherry Hill Beneficiation Export Date: 4th Qtr 2012 Output: 5-6 Mt pa Product: Concentrates Capital Cost: ~ $300 Mill ? ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

30 PORT BONYTHON ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

31 Reduced OPEX WILCHERRY HILL STAGE 2 Shorter Transport Distances
Bulk Mining Bulk Shipping 31 ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

32 IRONSTONE OUTCROP HERCULES
32 ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

33 Stage 3 – Hercules Exploration & Development
PRODUCTION STAGES Stage 3 – Hercules Exploration & Development Export Date: 2015 Output: Mt pa Product: DSO Hematite & Concentrate Capital Cost: ??? (incl. drilling) ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

34 Shares - 53.0 Mill Share Price – $0.97 Options – 10.7 Mill
IRONCLAD SEPT 2010 Shares Mill Share Price – $0.97 Options – Mill Mkt Cap - $ 50.0 Mill ADDRESS: Level 2, 679 Murray Street, West Perth, WA Ph: (08) Fax: (08) Website: ACN:

35 IRON – MARKET CAP. COMPARISON
IronClad Mining Iron Companies

36 IRON – ISSUED SHARE COMPARISON
IronClad Mining Iron Companies No Shares (mill)

37


Download ppt "Investor Presentation"

Similar presentations


Ads by Google