Presentation is loading. Please wait.

Presentation is loading. Please wait.

EUT 443 – ENGINEERING MANAGEMENT

Similar presentations


Presentation on theme: "EUT 443 – ENGINEERING MANAGEMENT"— Presentation transcript:

1 EUT 443 – ENGINEERING MANAGEMENT
GROUP ASSIGNMENT

2 EUT 443 GROUP ASSIGNMENT YOU WORKED FOR AN ENGINEERING CONSULTANCY FIRM AS A PROJECT ENGINEER. RECENTLY, THE FIRM RECEIVED AN INVITATION TO BID (ITB) FROM A MULTINATIONAL COMPANY (MNC) TO PERFORM AN ENGINEERING DESIGN FOR THEIR NEW PROJECT. HENCE, YOU ARE REQUIRED TO PREPARE A TECHNICAL & COMMERCIAL PROPOSAL (PROJECT QUOTATION) FOR THE SAID PROJECT.

3 EUT 443 GROUP ASSIGNMENT USING THE GROUP ARRANGEMENT AND DESIGN PROJECT TITLE FROM ERT 424/461 PREPARE THE REPORT IN ACCEPTABLE PROPOSAL FORMAT EXTRA MARKS FOR EXTRA EFFORTS

4 EUT 443 GROUP ASSIGNMENT 1. DEVELOP TEAM CHARTER:
INTRODUCTION (TEAM/COMPANY PROFILE AND PROJECT TITLE) PROJECT OBJECTIVES (USE S.M.A.R.T. METHODOLOGY) PROJECT SCOPE (SET THE BOUNDARIES) ORGANIZATIONAL CHART ROLE & RESPONSIBILITY (INCLUDE SKILLS AND EXPERTISE OF EACH MEMBER)

5 EUT 443 GROUP ASSIGNMENT 2. DEVELOP PROJECT MASTER PLAN:
PROJECT DELIVERABLES (DEFINE CLIENT’S REQUIREMENTS & PROJECT OUTCOMES) RESOURCE REQUIREMENTS (WITHIN PROJECT SCOPE) APPLICABLE STANDARDS & REQUIREMENTS (LOCAL & INTERNATIONAL) PROJECT EVALUATION METHODS (DESIGN PROCESS, DESIGN REVIEW)

6 EUT 443 GROUP ASSIGNMENT 3. DEVELOP PROJECT BUDGETARY:
BUDGETARY & COST ESTIMATES POSSIBLE PROJECT DEVIATIONS (CHANGE IN TEAM CHARTER, CHANGE IN MASTER PLAN) REVISED BUDGETARY & COST ESTIMATES, IF APPLICABLE

7 EUT 443 GROUP ASSIGNMENT 4. DEVELOP PROJECT MILESTONES:
PROJECT MILESTONES CONSISTS OF PROJECT STAGES, DETAILED ACTION PLANS, PREDECESSORS, DURATIONS, PERSON-IN- CHARGE DEVELOP GANTT CHART USING MICROSOFT PROJECT

8 EUT 443 GROUP ASSIGNMENT WEEK 11: 18 NOVEMBER 2016 (FRIDAY)
SUBMISSION DATE: WEEK 11: 18 NOVEMBER (FRIDAY) FRONT OFFICE BEFORE 5.10 PM


Download ppt "EUT 443 – ENGINEERING MANAGEMENT"

Similar presentations


Ads by Google