1 Power Supply Scenario in the State of Himachal Pradesh
Date: VENUE: SHIMLA

2 HP Power Supply Status Power in the Himachal Pradesh is predominantly Hydro and whereas we are Surplus in power during the Summer months, we are badly Deficit in Winter months since our generation reduces almost to 15-25% due to lean water discharge. Thus the winter shortages are met through Banking/Contra Banking arrangements with States like Punjab, Haryana and Delhi, through allocation of unallocated shares from central sector projects by GOI and by way of purchases from Open market on need basis.

3 Power Supply Scenario 2006-07, 2007-08 & 2008-09
for the Financial Year , &

4 Availability & Demand (for FY 2006-07 to 2008-09)
All Figures in MU Description Summer Winter Total A Availability 3627 1477 5104 4166 1220 5386 4673 1497 6170 B Demand 2790 2251 5041 3376 2616 5992 3669 2966 6635 C Surplus/Deficit (A-B) 837 -774 -1396 -1469 D Additional Availability during Winter Months 1 Unallocated Quota 262 333 300 2 GoHP Power 531 476 518 3 Forward Banking 224 240 406 4 Contra Banking -- 295 5 Market Purchase from Open Market 62 6 Power Cuts 74 133

5 Winter Months Availability vis-à-vis Requirement of FY 2008-09
All Figures in MU Sr. No. Description Oct -08 Nov Dec Jan -09 Feb Mar Total 1 Availability 552 424 425 386 335 454 2576 2 Requirement 595 570 636 560 620 3617 3 Shortages (-) 43 146 211 250 225 166 1041 s Contd… 5

6 Mitigation of Shortages – (Nov-08-Mar-09)
All Figures in MU Sr. No. Description Oct -08 Nov Dec Jan -09 Feb Mar Total 1 GOI Assistance --- 66 68 61 331 2 PSEB Return Banking 95 18 208 3 HPPC Return Banking 24 11 59 4 PSEB Fwd Banking 30 28 43 101 5 HPPC Forward Banking 16 17 15 82 6 BYPL Forward Banking 37 36 29 34 13 177 7 BRPL Return Banking 20 8 TOTAL 148 233 232 187 141 978 9 Net Surplus /Shortage (+/-) (-)6 (+)2 (+)22 (-)18 (-)38 (-)25 (+)24 (-)87 10 Offer from BRPL (+)26 (+)31 (+)34 (+)91

7 New Initiative Taken this year
Contra Banking with PSEB, HPPC: PSEB (207 MU) HPPC (58 MU) Contra-Banking on Day Ahead basis: BRPL (28 MU)

8 Impact of Initiatives Taken
The above arrangement has facilitated no power cut in the State during winter months till date. Besides this, for the First Time in the State of HP, Unrestricted Power is being made available even during the peak load hours to the intended Industrial Consumers to the extent of their requirement. Also no Electricity Connection is pending particularly of Industrial applicants for want of non-availability of power.

9 Typical Load Curve for a Day during winter month (2008-09)
Demand >1000 MW

10 Demand Versus own Generation (in MU)
10

11 POWER SCENERIO – 2008-09 to 2010-11 DEMAND VS SUPPLY

12 GROWTH IN REQUIREMENT OF POWER WITH IN THE STATE

13 GROWTH IN REQUIREMENT OF POWER WITH IN THE STATE

14 Proposal for the Financial Year

15 Proposed Availability & Demand
All Figures in MU Description Summer Winter Total A Availability 4526 1561 6087 B Demand 4144 3111 7255 C Surplus/Deficit (A-B) 382 -1550 D Additional Availability during Winter Months 1 Unallocated Quota 300 2 GoHP Power 500 3 Forward Banking 4 Contra Banking 450 5 Market Purchase from Open Market -- 6 Power Cuts

16 Estimated Power Supply Position for 2009-10
SUMMER MONTHS All Figures in MU S. No. DESCRIPTION Apr, 09 May, 09 Jun, 09 Jul, 09 Aug, 09 Sep, 09 Oct, 09 TOTAL Summer 1 Own Generation 119 184 230 275 284 240 157 1489 2 IPPs Mini Micro including Patikari 28 31 44 60 54 33 310 3 Baspa II (Including free power) 49 146 199 215 216 154 70 1049 4 C.Sector Shares 187 200 192 170 159 1246 5 Bilateral (Yamuna + RSD + Shanan + Malana) 42 56 63 83 84 67 37 432 6 Total Availability(1 to 5) 392 601 723 833 836 685 456 4526 7 Demand of the State 555 589 570 605 600 620 4144 8 Requirement within the state (LU/day) 185 190 195 194 9 Gross Surplus/Deficit (+/-) (6-8) -163 12 153 228 231 85 -164 382

17 Estimated Power Supply Position for 2009-10
All Figures in MU SUMMER MONTHS S. No. DESCRIPTION Apr, 09 May, 09 Jun, 09 Jul, 09 Aug, 09 Sep, 09 Oct, 09 TOTAL 10 Energy Banking as per agreement (i to iv) i) BYPL Banking (Return) 41 40 45 35 161 ii) PSEB Banking (Return) 15 38 6 97 iii) HPPC Banking (Return) 14 28 13 83 iv) BRPL Banking (Return) 30 34 32 96 11 Gross Surplus/Deficit (+/-) (9-10) -163 -29 54 98 66 -164 -55 12 Net Power Available for sale/Banking 301 Additional Availability by way of : GoHP Entitlements (12% Free power +22% Equity) Import under Banking a) PSEB (including Contra) b) HPGCL (including Contra)

18 Estimated Power Supply Position for 2009-10
WINTER MONTHS All Figures in MU S. No. DESCRIPTION Apr, 09 May, 09 Jun, 09 Jul, 09 Aug, 09 Sep, 09 Oct, 09 TOTAL 1 Own Generation 108 85 70 71 107 441 1930 2 IPPs Mini Micro including Patikari 25 22 24 30 123 433 3 Baspa II (Including free power) 51 41 33 27 32 184 1233 4 CentralSector Shares 125 136 135 127 137 660 1906 5 Bilateral (Yamuna + RSD + Shanan + Malana) 38 31 35 153 585 6 Total Availability(1 to 5) 347 315 282 276 341 1561 6087 7 Demand of the State 615 651 574 620 3111 7255 8 Requirement within the state (LU/day) 205 210 200 1030 1224 9 Gross Surplus/Deficit (+/-) (6-8) -268 -336 -369 -298 -279 -1550 -1168

19 Estimated Power Supply Position for 2009-10
WINTER MONTHS All Figures in MU S. No. DESCRIPTION Nov, 09 Dec, 09 Jan, 10 Feb, 10 Mar, 10 Total (Winter) Grand Total Energy Banking as per agreement (i to iv) i) BYPL Banking (Return) 161 ii) PSEB Banking (Return) 97 iii) HPPC Banking (Return) 83 iv) BRPL Banking (Return) 96 11 Gross Surplus/Deficit (+/-) (9-10) -268 -336 -369 -298 -279 -1550 -1605 12 Additional Availability by way of : GoHP Entitlements (12% Free power +22% Equity) 118 85 80 122 502 Import under Banking a) PSEB (including Contra) b) HPGCL (including Contra) c) BRPL (including Contra) d) BYPL 13 Special assistance from GOI (Unallocated Share) 60 62 56 302

20 Estimated Power Supply Summer Months (Apr-09 to Oct-09)
All Figures in MU Months Availability Demand of the State Return of Banked Power Surplus(+)/ Shortage(-) 1 2 3 4 5 (2-3+4) Apr, 09 392 555 - -163 May, 09 601 589 41 -29 Jun, 09 723 570 99 54 Jul, 09 833 605 145 83 Aug, 09 836 133 98 Sep, 09 685 600 19 66 Oct, 09 456 620 -164 Total 4526 4144 437 (+)301/ (-)356

21 Estimated Power Supply Winter Months (Nov-09 to Mar-10)
All Figures in MU Months Availability (with GoHP Entitlements) Demand of the State Shortages (-) GoHP Entitlements Central Assistance GOI UA Quota Net Shortage 1 2 3 4 (3-2) 5 6 7 (4-5+6) Nov, 09 347 615 -268 118 60 -90 Dec, 09 315 651 -336 97 62 -177 Jan, 10 282 -369 85 -222 Feb, 10 276 574 -298 80 56 162 Mar, 10 341 620 -279 122 95 Total 1561 3111 -1550 502 302 746

22 Details of GoHP Free Power (April08-Oct08) 12% Share in Ch-I, Ch-2, Bsuil & NJPC (12% Free Power + 22% Equity) All Figures in Lac Units Month Ch - 1 Ch - 2 Bsuil NJPC Sub Total Grand Total 1 2 3 4 5 6 7 FP 12% Equity 22% Total (12% FP) (12% FP + 22% Equity) Apr-08 201.17 108.68 102.70 391.28 703.94 803.83 May-08 337.52 229.29 115.23 Jun-08 432.20 254.28 103.01 925.05 Jul-08 420.74 263.08 107.24 Aug-08 457.05 255.29 122.95 Sep-08 212.91 165.62 62.66 900.91 Oct-08 119.13 109.33 37.78 586.67 852.91 Total: 651.57

23 GoHP Entitlements proposed to be utilized by HPSEB
Details of GoHP Entitlements Proposed to be utilised during Summer Months All Figures in MU Month (Proposed) GoHP Entitlements proposed to be utilized by HPSEB Total GoHP Entitlements Utilized by HPSEB Sold PTC GoHP Entitlements To be Utilized To be Sold Apr-08 151 70 81 110 41 12% FP + 22% Equity Power in NJHPS May-08 373 34 340 12% Free Power in Chamera-1 Jun-08 341 43 298 Jul-08 446 42 404 Aug-08 433 46 387 Sep-08 299 21 278 Oct-08 193 130 62 12% Free Power in Ch-1, Ch-2, B-siul, NJHPS Total: 2236 200 2036 488* 1748 * Includes 150 MUs of power for Contra Banking for its return during Dec. 09 & Jan. 10

24 NOTE: ARRANGEMENTS FOR FY 2008-09
COST OF POWER PURCHASE IN RESPECT OF GoHP ENTITLEMENTS ARRANGEMENTS FOR FY 12% Free Power entitlements: @ Rs.3/Unit 22% equity power in NJHPS: As per CERC Tariff (Approx.) Rs.3/Unit NOTE: HPSEB had been paying trading margin of 4 paise/ unit to M/s. PTC India Ltd. till

25 PROPOSAL FOR FY 2009-10 12% free power :
As per tariff approved by HPERC 1 No. Terms of Electricity (Removal of Difficulty) Third Order 2005 issued under the Electricity Act, 2003 22% Equity : Applicable CERC Tariff Power in NJHPS NOTE: HPSEB shall not be liable to pay any trading margin to PTC India Ltd.

26 NOTE: HPSEB was forced to effect purchase of power from open market during Jan. & Feb., 2008 and the average procurement price was Rs.7.13/Unit with maximum price as Rs.8.54/Unit Power to the tune of 62 MUs was purchased and power cut aggregating to 133 MUs were also imposed.

27 Category wise Consumers (in % age) (As on March, 2008)
Taking Power to People 27 27 27 27

28 Category wise consumption (in % age) (Utilization pattern in MU as on March, 2008)
Taking Power to People 28 28 28 28

29 DISTRIBUTION OF PER UNIT COST OVER VARIOUS EXPENSES 2008-09 – Projected (%)
Cost per unit 464 paise 29

30 THANK YOU 30