1 ATLAS Safety EP-ADO Meeting EDMS: 11 July 2017

2 Continuous improvement
Content If you need to add more than 3 objectives: Objective: 20pt,bold Description: 20pt Enable GRIDLINES and GUIDES (in ‘View’ section) to align with previous text RISK ASSESSMENT SAFETY TRAINING SAFETY SYSTEMS RADIATION PROTECTION EMERGENCY RESPONSE CLEANING OTHER SAFETY MATTERS Continuous improvement

3 Risk assessment Operation and Upgrade Activities
Gradual implementation of new format of PPSPS towards Risk Assessment - focus more on activity description, risk identification and assessment - avoid redundancy with information mentioned in IMPACT - ease update of documentation Current situation Out dated PPSPS Starting new template implementation used for a few activities: LUCID, Cryo, Micromega Work ongoing/to be performed Current PPSPS Extraction from IMPACT via sub-system search Conversion in new template with current information and creation for upgrade activities Review by Activity supervisor Organization of meetings for global review Upgrade ex: New Small Wheel

4 Risk assessment Infrastructure Emergency Scenarios
Identification and evaluation of infrastructure risks Current situation No document known General safety inspections in buildings – (1st in USA15 this year) Work ongoing/to be performed Risk identification and evaluation for each ATLAS building such as Noise, Fall on same level, Fall from height, gas Emergency Scenarios Description and analysis of Emergency Scenarios Scenarii exemples UX15 - Toroid: Fire UX15 - Toroid: Cardiac arrest UX15 - Toroid: Liquid argon leak UX15 - Toroid: Flammable gas leak UX15 - Toroid: CO2 leak USA15 - Cryo area: Leak liquid N2 USA15 - Rack room: Rack fire close to exit USA15 - Gas room: Flammable gas leak different risk assessment are linked and allow to have a global view of risks and actions to be performed. UX15 - Fire Toroid – voussoir area sector 9-C UX15 - Arret cardiac, magnetic field ON (defibrillator work?) -> consequences of turning of magnet with someone inside UX15 - Liquid argon major leak -> causes? Check credibility of scenarios mentioned in TIS doc. Release in environment – RP issue UX15 - CO2 leak -> cooling system sector 5 USA15 – Leak liquid N2 – cryo area USA15 leak CV room – 2 sorties de secours USA15 Fire rack room : feu proche des porte de sortie au 1er niveau -> fumée panique, ascenseur USA15 – leak flammable gas Current situation Existing documents describe installation, but no analysis on causes and consequences Work ongoing/to be performed Identification of main accidental scenarios Preparation of description and analysis Organization of meetings with experts of system

5 Safety Training Online course Classroom course
Harmonize CERN online safety training courses and improve ATLAS (Level 4A) Current situation Out dated ATLAS level 4A Common course for the 4 large experiments drawn up jointly with CMS, LHCb and ALICE Work ongoing/to be performed Review of ATLAS level 4A with support of HSE Safety training Classroom course Insure update and follow up of safety training 3 short modules: Surface Underground Toroid Current situation Safety training courses such as work at height often followed more than 5 years ago Self Rescue Mask (SRM) training course not mandatory to access Toroid and not included in access system for US15 Work ongoing/to be performed In liaise with risk assessment and IMPACT, check of training status and inform activity supervisor SRM course - mandatory 1st February 2018 for Toroid and US15

6 Radiation Protection Waste and material management
Control and measurement of material and waste in UX15 Current situation Addition of bins for waste in trench, modification of cupboards, communication via OPM and section meeting for the different zone Sorting not always performed properly Maintenance of gate monitor Work ongoing/to be performed Improvement of pictures for waste sorting and name on panel (to be seen with RP) Exposure to radiations – ALARA Control and estimation of dose for activities Current situation DIMR fill in for activities close to beam pipe Operational dosimeter worn by people intervening Work ongoing/to be performed Start filling in Work Dose Planning to estimate level of radiation for activities close to Beam pipe Communication of measurements made close to beam pipe Minimization for LS3 and after: simulation, mock-up at surface, tools to work with distance, fast fixation and connection technics, …

7 Safety Systems Sniffer Foam system in US15
Verification and up grade of system Current situation Tests performed on sniffer system in collaboration with BE-ICS following identification of not correct connection Work ongoing/to be performed Continue tests, and correct errors found Foam system in US15 Upgrade of system Current situation System never maintained, locked and foam more than 10 years old Work ongoing/to be performed LS2 – Eventual upgrade of system by replacing tank, foam and pre-mixer – collaboration with CMS

8 Safety Systems Medium expansion foam system Other system
Removal of system Current situation Foam more than13 years old, and tanks leaking After investigation, no information about system, and no use by FB in case of intervention Removal of blue tanks with foam in UX15 and at surface Work ongoing/to be performed Removal of red tanks containing foam Other system Improve protection of cavern in case of fire Current situation Minimax system in racks, Fire extinguishers and Fire hoses Work ongoing/to be performed Search and study of additional solutions: water mist, inerting

9 Emergency response FB intervention Evacuation
Improve efficiency of emergency interventions Current situation Exercise of Casualty Extraction in the Toroid Creation of Operation Plan to guide FB in cavern – Topography, methodology FB «reconnaissance» of Toroid Work ongoing/to be performed Continuation of writing Operation Plan in collaboration with HSE-FB link with Emergency scenarios Evacuation Improve evacuation of ATLAS underground premises FB important turnover. Lack of knowledge of our complex infrastructure. Many new officers. Level 6 as evacuation path Clarification of use of red doors on HS-US => to be used in case of emergency Current situation 3 ATLAS Evacuations in with people underground Preparation, organisation, and training supply for 25 Emergency guides Review of evacuation paths in UX15 and USA15 in collaboration with HSE Work ongoing/to be performed Keep on training emergency guides, (and training of Level 2 first aiders)

10 Cleaning Toroid and HS structure Activities/buildings
End of YETS cleaning Current situation Cleaning end of YETS of Toroid by mainly ATLAS members, and HS structure by external company Work ongoing/to be performed Improvement of trench cleaning Activities/buildings Improve cleaning during activities and inside buildings Current situation UX15: Many cable ties in UX15 cavern during EYETS UX15: Cables, objects often found during Patrol USA15: rack rooms become a storage area with a lot of burning material Not used material or damaged material stored underground and in surface buildings Work ongoing/to be performed Contact responsible of zone when known, presentation to OPM meeting, removal of material Count on individual responsibility Toroid cleaning gained 1 day. YETS – SRM training course to be followed by cleaners.

11 Other Safety matters Communication via e-group Public visits Patrol
Short access procedure Maintenance of safety equipment: SRM, ODH portable detectors, RP devices, Pharmacy, Red cabinets, Work at height PPE Accident analyses Safety shifts – cavern closing-opening Lonely workers Documentation management on EDMS

12 Do not hesitate to contact us!
Conclusion Improve working conditions to insure your safety and safety of equipment Support on safety aspects people working in ATLAS operation and upgrade Comply with CERN safety rules, and host states Do not hesitate to contact us!

13 Thank you for your attention

14 Continuous improvement
Back up slide P D C A Continuous improvement Plan Do Check Act