Monitoring aspects of permits and inspections (1)

Similar presentations


Presentation on theme: "Monitoring aspects of permits and inspections (1)"— Presentation transcript:

1 Monitoring aspects of permits and inspections (1)
Wim Burgers Senior advisor InfoMil Notes

2 Contents of this presentation
SMART permits Tasks for inspectors Periodic measurements Continuous measurements Yearly emission reports Explanation of the validation test Notes

3 Contents of this presentation
SMART permits Specific Measurable Acceptable Reliable Time bound Notes

4 SMART permits: Specific (1)
Emission Limit Value (ELV) Units (NOx : mg NO2/Nm3 at reference O2) Continuous/periodic monitoring Sampling place When is ELV exceeded? Actions to be taken when ELV is exceeded Notes

5 SMART permits: Specific (2) Continuous or periodic measurements
Continuous Measurements Large sources (e.g. combustion plants >100 MWth) Sources with strongly varying emissions Sources with secondary abatement techniques Compounds with high environmental impact Notes

6 SMART permits: Specific (3) Continuous or periodic measurements
Small sources Sources with constant emissions Sources with secondary abatement techniques and the functionality can continuously be checked with other measurements Notes

7 SMART permits: Measurable
Periodic measurements Suitable standard Detection limit < Emission Limit Value (ELV) Sufficient number of access ports Maximum uncertainty Continuous measurements Suitable monitoring system (CEMS/PEMS) Notes

8 SMART permits: Acceptable
Emission Limit Value: in agreement with EU directives in agreement with Best Available Techniques; ELV ≠ Emission Value BREF Abatement technique cost effective Notes

9 SMART permits: Reliable (1) Periodic measurements
Accredited laboratories (EN 17025) Standards: standard reference method (SRM) Notes

10 SMART permits: Reliable (2) Continuous measurements
Quality Assurance (EN 14181) QAL 1: required uncertainty achievable QAL 2: calibration with Standard Reference method (SRM) (15 parallel measurements) QAL 3: zero/span checks in Cusum cards Annual Surveillance Test: verification by 5 parallel measurements with SRM; linearity test Notes

11 SMART permits: Time bound (1) Periodic measurements
Sampling time/averaging time Number of samples Representative process conditions or Measurement plan Notes

12 SMART permits: Time bound (2) Continuous measurements
Availability of the analysers Sampling frequency Averaging time Allowed period for exceeding of the emission limit value Notes

13 Tasks for inspectors: periodic measurements (1)
Judgement of the report: Analysis method, sampling procedure, time Uncertainty Accreditation Measured concentration below emission limit value Representative process conditions Notes

14 Tasks for inspectors: periodic measurements (2)
Judgement of measurements: Analysis method, sampling procedure Representative process conditions Notes Judgement of measurement plan: Analysis method, sampling procedure, time Representative process conditions

15 Tasks for inspectors: continuous measurements
Judgement of the equipment: EN implemented for QA/QC, or Analysis method, uncertainty Sampling: representativeness, frequency, averaging time Calibration, zero and span checks, sufficient maintenance Calculation of concentration (conversion factors for moisture oxygen concentration, temperature, etc) Notes

16 yearly emission reports (1)
Tasks for inspectors: yearly emission reports (1) Validation of the report (1): Correct emission factors used for all sources? Correct calculation methods used? Correct units used? Emission data consistent with former years Emission data consistent with emission limit values? Notes

17 yearly emission reports (2)
Tasks for inspectors: yearly emission reports (2) Validation of the report (2): Installation data consistent with energy data? Energy data consistent with emission data? Emission data consistent with installation data? Notes Explanation of validation test