1 4th Railway Package – Implementation of the Technical Pillar
Challenges Ahead for the Polish Railway Sector 20 April 2017, Warsaw Josef Doppelbauer, ERA Executive Director

2 Objectives of the Technical Pillar of the 4RP
“Safety First” Facilitate the completion of the Single European Railway Area - removing the remaining technical barriers The European Union Agency for Railways has been established in 2004 (as “European Railway Agency”), with the main task of proposing the technical and legal framework for the Single European Railway Area (SERA). The main objectives of the Agency have been to improve Safety and Interoperability on the European railway network. Thus, the Agency deals with all technical issues arising when a train crosses an inner border in the EU, e.g. by creating creating common rules for safety and operation, by establishing Technical Specifications for Interoperability (TSIs), or by acting as the system authority for the European Rail Traffic Management System (ERTMS).

3 The Interoperability Vision
The legacy of national monopolies with national rules means that where rail could be most competitive (long distance freight and medium distance high speed passenger), fragmentation undermines competitive position of railways (“95% of our traffic is national”) One set of rules (= network)

4 Key Elements of the Technical Pillar
The Agency will issue single EU-wide vehicle authorisations and safety certificates to train manufacturers and railway undertakings The Agency will be in a position to issue an approval required for the NSA authorisation of ERTMS trackside projects (a binding opinion on ERTMS trackside specifications) All applications to the above processes will be handled by the so-called One-Stop-Shop developed by the Agency Covering applications at the Agency, but all national applications for Safety Certification, Vehicle authorisation, and trackside/infrastructure authorisation as well Cooperation with NSAs (pool of experts) ERTMS System Authority What are the main changes? VAPIM + Track Access + SMS + Supervision

5 Timeline e.i.f. of legal text 15/06/2016 2016 2017 2018 2019 Board of appeal (definition) EC Working Group on 4RP implementation Transposition in MS Board of appeal (establishment) Integrated Management System (IMS in ERA) Phase 1 – Plan / Do Phase 2 - Check Phase 3 - Act Shadow Running (ERA/NSAs) ERA / NSAs delivering 4RWP Adoption by Mgt Board BoA effective ICS draft specs ICS Spec/Dev ICS Dev/Operation ICS Operation ICS Dev Establisment of learning case phase Learning cases Definition of fees&charges Revision of the CSM on Ca and Supervision Cooperation Agreement – Preparatory work Cooperation Agreement framework Specific Cooperation Agreements Study on fees & Charges SSC process 15/06/2019 IMS including 4RWP processes (in ERA) Mgt Board Consultation EC legal act Apportionment of fees&charges ERA Internal Procedure for fees&charges Definition Hard & soft skills Agency internal staff competency Establishment of a Pool of Experts Practical Arrangements for SSC Guide for SSC Internal procedures for SSC VA process Practical Arrangements for VA Guide for VA Internal procedures for VA ERTMS approval process Guide for ERTMS Approval Internal procedures for ERTMS approval EC model for declaration of verification Liability Dissemination/training of new processes Full commitment of all actors Programme management Steering committee Member States are encouraged to appoint their own programme managers

6 Commission Member States Agency and NSAs
The Success of the Technical Pillar Needs Full Commitment of All Actors Adopt Implementing Acts during transition period for: - practical arrangements for vehicle authorization and safety certificates - principles specifying fees and charges payable to the Agency (12 legal acts in total, to be adopted during transition period) Commission Put in place national legislation to transpose the 4th railway package by 15 June 2019 Member States Conclude cooperation agreements before end of transition period Agency and NSAs

7 Future Cooperation Agency - NSAs
Description of the tasks Conditions for deliverables and applicable time limits Applicants’ fees distribution between Agency and NSAs Without prejudice to the Agency’s full responsibility for its decisions Cooperation agreements (to be signed with all NSAs) Vehicle authorisation and safety certification for national traffic (if applicant decides so) Authorisation of railway infrastructure Supervision (NSA) Accident investigation (NIB) Tasks remaining under Member State responsibility

8 What has the Agency done for us?
(other transport modes will be changed by automation – will become "networks"

9 The New Vehicle Authorisation
by ERA National Authorities

10 SERA Conference Series
A pan-European event series to go along with the transition of the 4RP into national law An open discussion on expectations and realities of the new processes among the key players of the rail sector Hosted by the Commission with ERA, in collaboration with MS and NSAs, and sector representatives (RUs, RMs, IMs, NoBos etc.) What we expect from MS: Invitation lists Discussion topics

11 We are Shaping the Future of Rail in Europe!
Single European Railway Area (SERA) We need a solid starting point (for the transformation) – this is provided by the Technical Pillar of the 4th Railway Package. 2017 there is the critical year We have to make sure that we get the right framework! safe :: connected :: affordable