Download presentation
Presentation is loading. Please wait.
1
02/24/2004
2
CONOPS
4
Major Design Constraints and Considerations
No aircraft modification C-130 minimal mission interference C4ISR – Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance Multi-mission flexibility (Counter Drug, Environmental Impact Assessment, Counter Terrorism, HLS, Resource Surveys, Environmental Surveys) GOTS and COTS Ground-to-air deployment (< 2 hours)
5
Major Design Constraints and Considerations – cont.
Upgrade flexibility In-flight deployable Adequate space for various sensor configuration Standardized mounting/ connection of systems Power usage supplied within limits of C-130 Platform Stability
6
Standardized C-130 Pallet
7
C-130 Fuselage Operator Station Sensor Platform
8
Sensor Platform
9
Sensor Platform
10
Sensor Platform Sensor Platform Rail System Major Components
Linear Actuator (manual and automatic control) Rotational Gear Motor (manual and automatic control) Mechanical Arm/Pod System Proximity Sensors (linear and rotational control)
11
Sensor Platform Assembly
12
Securing Sensor Pallet
Loading Sensor Pallet Securing Sensor Pallet
13
Deployment Process Linear Translation (18 inches) - 20 seconds
Rotational Movement (237°) seconds Linear Retraction (12 inches) seconds Complete Deployment < 60 seconds
14
Mechanical Arm and Pod – Incremental Articulation
Deployment Process Mechanical Arm and Pod – Incremental Articulation
15
Leaving Stowed Position Closing Deployed Position -
Deployment Process Leaving Stowed Position Closing Deployed Position -
16
Mechanical Arm and Pod FEA Analysis
Restraints set along shaft supports Forces applied simulating drag Material type/thickness selection
17
Operator Station
18
Operator Station
19
Loading Operator Station Operator Station in Cargo-Hold
20
Operator Station Components 2 computer stations
3 electronic racks Climate control (Fan and vent unit, dehumidifier) Communication panels Power rectification Direct or indirect lighting 2 operator seats, 1 observer seat 2 operator doors Slingable/Stackable box
21
Powered Operator Station
Controls
22
Operator Station Proposed Capabilities Sensor operation/control
Data acquisition/interpretation Data storage Direct ground/ aircraft/ satellite communication Converter for power supply C4ISR – Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance
23
Operator Station Power Connection Sensor Connection
24
Power Controller (rack mounted)
Operator Station Power Controller (rack mounted)
25
Sensor Pallet Electrical Layout
26
C-130 Power Distribution
27
Close-up: Power Distribution
C-130 Power Distribution Close-up: Power Distribution
28
Sensor Pallet Control
29
Sensor Pallet Control Pendant
30
GPS Communication
31
Aerodynamic Test
32
Aerodynamic Test Pressure rake test
Air Test conducted on 02/04/2004 based on developed test matrix Currently reducing data Will compare data with that of simulation
33
Year Two
34
Proposed Possible Tasks
Evaluation & Certification – Standardizing the system System Modification – Enhance support capabilities Sealing Cargo Hold – Operate above 10,000 feet
35
As of 02/24/2004
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.