1 02/24/2004

2 CONOPS

3

4 Major Design Constraints and Considerations
No aircraft modification C-130 minimal mission interference C4ISR – Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance Multi-mission flexibility (Counter Drug, Environmental Impact Assessment, Counter Terrorism, HLS, Resource Surveys, Environmental Surveys) GOTS and COTS Ground-to-air deployment (< 2 hours)

5 Major Design Constraints and Considerations – cont.
Upgrade flexibility In-flight deployable Adequate space for various sensor configuration Standardized mounting/ connection of systems Power usage supplied within limits of C-130 Platform Stability

6 Standardized C-130 Pallet

7 C-130 Fuselage Operator Station Sensor Platform

8 Sensor Platform

9 Sensor Platform

10 Sensor Platform Sensor Platform Rail System Major Components
Linear Actuator (manual and automatic control) Rotational Gear Motor (manual and automatic control) Mechanical Arm/Pod System Proximity Sensors (linear and rotational control)

11 Sensor Platform Assembly

12 Securing Sensor Pallet
Loading Sensor Pallet Securing Sensor Pallet

13 Deployment Process Linear Translation (18 inches) - 20 seconds
Rotational Movement (237°) seconds Linear Retraction (12 inches) seconds Complete Deployment < 60 seconds

14 Mechanical Arm and Pod – Incremental Articulation
Deployment Process Mechanical Arm and Pod – Incremental Articulation

15 Leaving Stowed Position Closing Deployed Position -
Deployment Process Leaving Stowed Position Closing Deployed Position -

16 Mechanical Arm and Pod FEA Analysis
Restraints set along shaft supports Forces applied simulating drag Material type/thickness selection

17 Operator Station

18 Operator Station

19 Loading Operator Station Operator Station in Cargo-Hold

20 Operator Station Components 2 computer stations
3 electronic racks Climate control (Fan and vent unit, dehumidifier) Communication panels Power rectification Direct or indirect lighting 2 operator seats, 1 observer seat 2 operator doors Slingable/Stackable box

21 Powered Operator Station
Controls

22 Operator Station Proposed Capabilities Sensor operation/control
Data acquisition/interpretation Data storage Direct ground/ aircraft/ satellite communication Converter for power supply C4ISR – Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance

23 Operator Station Power Connection Sensor Connection

24 Power Controller (rack mounted)
Operator Station Power Controller (rack mounted)

25 Sensor Pallet Electrical Layout

26 C-130 Power Distribution

27 Close-up: Power Distribution
C-130 Power Distribution Close-up: Power Distribution

28 Sensor Pallet Control

29 Sensor Pallet Control Pendant

30 GPS Communication                                                                                                                             

31 Aerodynamic Test

32 Aerodynamic Test Pressure rake test
Air Test conducted on 02/04/2004 based on developed test matrix Currently reducing data Will compare data with that of simulation

33 Year Two

34 Proposed Possible Tasks
Evaluation & Certification – Standardizing the system System Modification – Enhance support capabilities Sealing Cargo Hold – Operate above 10,000 feet