1 Solar Probe Plus FIELDS
Team Meeting Management 2/07/2017 Peter R. Harvey (Retired)

2 Agenda Agenda includes: 1. Science (Bale) 2. Management (Harvey)
                2.  Management (Harvey)                 a. Deliverables                 b. Issues Remaining                 c. Schedule Milestones                 d. ANT PER Review Coming Up 3.  Integration and Test (Brent M)                 a. I&T Schedule 4.  Systems (Goetz)                                                                                              5. Mechanical/Thermal - Bill D., David G., Paul Turin, Gayle M.                 a. MEP (Vibration in progress)                 b. Antennas                 c. Thermal                            6. Electrical Status                 MEP (Waiver[SCM requirement])                 PREAMPS                                 7. Ground Support / Stimulus Rack – Quinn 8. Science Operations - Pulupa                

3 DELIVERABLES / MEETINGS
Items Due from FIELDS: Update the FIELDS specific ICD, completing assigned actions – see latest from Kris on 1/27/17 Provide CBE updates for the three Mission Cases/Power Cases requested in A. Reiter’s 10/13 [10/21/16] Perform local SOC-MOC testing – Scheduled now for 2/22/17 V5 PER Action Items MEP PER Action Items Command & Telemetry Definition and Flight Rules  - Baseline version Meetings / Tests: Jan18: Deliveries for Integrated TV Test (ITVT) 3 harnesses, 3 antenna sims Feb 2: MEP PER (working to extend this) Feb TBD 2017: Supporting ITVT at GSFC Feb : MOC-SOC local tests

4 EM/FM ISSUES Source: SPF_MGMT_026_ISSUES.xlsx

5 EM/FM ISSUES Source: SPF_MGMT_026_ISSUES.xlsx

6 V5 ACTION ITEMS Source: FIELDS SCM AND V5 PER ACTION ITEMS.xlsx

7 V5 ACTION ITEMS Source: MEP PER action items concerns and recommendations-draft

8 MEP PER ACTION ITEMS Source: MEP PER action items concerns and recommendations-draft

9 MEP PER ACTION ITEMS

10 Schedule This schedule was developed in concert with Project Management at APL. It is an MEP-centric schedule, aiming to make certain that the MEP is delivered to the S/C Integration on time. To accomplish this, the schedule assumes an environmental configuration using the Flight Model MEP and MAGs, but Engineering Model sensors : V1-V4 preamps, V5 and SCM. We have also abandoned plans to use a local EMC contractor, both to save time and the expense. Thus, our setup/teardown time, etc., is shorter.

11 JAN 2017VERIFICATION For PER, we need all the functional requirements demonstrated. Everything through I&T and up to Inst. Env. (~ 39 about other things). Included: DCB FM1 MAG SCM LNPS DFB FM2 AEB PREAMPS ANT Included: DCB FSW TDS FSW SOC DCB FM2 L4 ant[7] FIELDS ICD ant[1] Gi ICD other[16] EMECP blnks[6]