Presentation is loading. Please wait.

Presentation is loading. Please wait.

Example of a well thought out TPM

Similar presentations


Presentation on theme: "Example of a well thought out TPM"— Presentation transcript:

1 Example of a well thought out TPM
Threshold Goal (Target) Technical Performance Metric (e.g. Weight, less is better) Margin Reporting Interval Milestone(s) Reviews/Event(s) Assessment Date Variance Tolerance Band (Control limits) Planned Profile Example of a well thought out TPM Est. at Completion Worst Case Est. Worst Case Estimate (WCE) Measured or estimated progress to be compared with planned progress. WCE accounts for contingency (see below) Estimate at Completion Forecasted WCE value of a TPM at designated completion Planned profile Time phased expected values (based on prior experience) Tolerance Band Management control limits representing projected level of error or control within the process Goal (Target) Desired objective profile values; Usually set to allow design trade space between Goal and Threshold Threshold Limiting acceptable profile values, usually the required or specified values Variance Difference between the Planned Profile and WCE Margin Difference between the WCE and Threshold value DAG CH 3 Figure 34: Leading Indicators Influence Risk Mitigation Planning


Download ppt "Example of a well thought out TPM"

Similar presentations


Ads by Google