Presentation is loading. Please wait.

Presentation is loading. Please wait.

STAKEHOLDER REPRESENTATIVES PUBLIC CONSULTATION MEETING

Similar presentations


Presentation on theme: "STAKEHOLDER REPRESENTATIVES PUBLIC CONSULTATION MEETING"— Presentation transcript:

1 STAKEHOLDER REPRESENTATIVES PUBLIC CONSULTATION MEETING
OTM RULE REVIEW STAKEHOLDER REPRESENTATIVES PUBLIC CONSULTATION MEETING Friday 7 March 2003 DR JOHN GODFREY

2 BSE Consumer Protection UK & EU
Specified risk material controls Over thirty months rule EU BSE testing of over thirty month animals

3 The Risk Assessment Risks to consumers now hugely lower than when BSE epidemic at its peak Any increase in risk arising from a change in the rule marginal compared to the past risk Difference in risks between the options very small Risks if we moved to testing OTM animals comparable to those experienced in 1997 with OTM rule in place

4 Practicality of Controls
Testing Major new system required action if a positive is found - traceability how will we know if it’s working? - transparency and audit SRM controls SRM controls will remain in force as the main plank of consumer protection removal of vertebral column from OTM cattle traceability Enforcement cattle passports dentition

5 Proportionality Principle that remedies should be appropriate to the risk posed, and costs identified and minimised OTM scheme currently costs some £400 million a year Testing all OTM animals would cost about £40 million a year Large cost differences between birth date options, but little difference in risk

6 Consumer Confidence in any Change
Decision based on a sound scientific assessment of risk, acknowledgement of uncertainties New controls robust and effective The resulting risk to consumers at an acceptable level The remaining uncertainties are not such as to require the continuation of the OTM rule on a precautionary basis Change is effectively communicated to the public

7 Emerging Findings Options which might be recommended:
allowing animals born after 1 August 1996 into the food supply, with testing of OTM animals moving entirely to testing all OTM animals


Download ppt "STAKEHOLDER REPRESENTATIVES PUBLIC CONSULTATION MEETING"

Similar presentations


Ads by Google