Special Device Review (Device Name)

Similar presentations


Presentation on theme: "Special Device Review (Device Name)"— Presentation transcript:

1 Special Device Review 09-10 (Device Name)
Prepared by: (Name) Rev(1) MM/DD/YY

2 Deployed Configuration (Sketch)

3 Description of Deployed Hardware (Include IceCube Hole #s and Depths)
Drill Order (IC Hole #): Weight and name of unit to be deployed Depths and/or breakouts Deployment type (attached to IC cable?) Description of any downhole cables Description of any surface electronics Description of any surface cabling

4 Objectives/Science Goals
Measurement (s) to be taken Type of data to be acquired etc

5 Materials & People needed for Deployment at each hole
Equipment needed for each deployment Materials needed for each deployment People (w/ on ice dates) for each deployment

6 Delivery Milestones Finish Instrument Production at (location)
Target date Finish Testing of (equipment) at (location) Ship from source location to destination location ROS week ending (date) (ROS date xxxx) On Ice Testing Week ending MM DD First Deployment MM DD

7 NH Testing Overview Functional tests of (equipment)
Test1 (results) Test2 (results) System Testing (e.g. at PCTS) Test 1 (results) etc

8 SP Testing Overview Visual inspection of shipped hardware
Functional testing System Testing

9 Interfaces to IceCube (show all connectors and pinouts)
Any connections to IC system Signaling format (analog, DSL Modem, DOM format, etc) List & diagram connectors and patch cables Diagram showing connectors and pinouts of connection to IC system

10 IceCube Compatibility Describe (T)ests or (A)nalysis
Verify no harm to IceCube hardware: Test or Analysis 1 Test or Analysis 2 Verify no disruption to IC timing or comms: etc

11 ICL Impact New Equipment needed in ICL
Modifications to existing ICL equipment Patch cables needed in ICL

12 Logistics ROS Date Ship Date/From/To/Who receives Shipping Method
week ending MM DD (ROS date xxxx) Ship Date/From/To/Who receives (name) to ship from (place) on MM DD (name) to Receive at Pole Shipping Method Method (verify with Terry H.) Weights & Dimensions of packages #Boxes, weights, approx sizes

13 Deployment Plan (Basic steps)
etc

14 Potential Safety Hazards/ Mitigation
Risk 1 Mitigation for Risk 1 Risk 2 Mitigation for Risk 2

15 Operational Plan How often/when will it operate. Who controls it?
How do you get data from / to it ?

16 RPSC Support Any anticipated RPSC support needed