Presentation is loading. Please wait.

Presentation is loading. Please wait.

Huntsville City Schools

Similar presentations


Presentation on theme: "Huntsville City Schools"— Presentation transcript:

1 Huntsville City Schools
Operations Update February 17, 2014

2 Winterization Video Presentation

3 Leading, Planning, Coordinating
Parking Lot Slippery Entrances Areas of Concern Side Walk Plan of Action

4 Leading, Planning, Coordinating

5 Resources Small spreaders for side walks
Salt truck set-up and driving by Salt Truck Salt spreader Staging of ice melt in schools. Areas of Concern Side Walk Ice melt Slippery Entrances

6 Resources

7 People

8 People

9 Results

10 Ready

11 Huntsville City Schools
Operations Update February 17, 2014

12 People Safety Cones Strategically Placed Building Operations Actions
Check HVAC units/Winter controls Sidewalks Front Entrances Gym Areas Pick up/Drop off points Intercom Systems Sports fields prepared Water Hoses detached from the side of buildings Attention to Critical Areas Monte Sano…Geographically elevated. Causes more severe ice road and general walking conditions Huntsville MS…Elevated walk way over street. Severe slippery conditions Lee HS…Extended Walkway must be prepared for slippery conditions School Safety Teams Act Safety Plans ready Ensure devices communications are working. Revalidate phone numbers


Download ppt "Huntsville City Schools"

Similar presentations


Ads by Google