Presentation is loading. Please wait.

Presentation is loading. Please wait.

Pine County 2017 AIS Planning

Similar presentations


Presentation on theme: "Pine County 2017 AIS Planning"— Presentation transcript:

1 Pine County 2017 AIS Planning
Caleb Anderson Land & Resources Manger Pine County Planning, Zoning, Solid Waste

2 Overview 2016 Review Current Resources 2017 and Future

3 2016 Review 2014 Surplus= $51,157 2015 Surplus= $57,762
2016 State Aid= $130,635 2016 Available= $239,554 2016 Plan Budget= $178,585 2016 Spent= $99,466.91

4 2016 Review Control Planning Youth Prevention Public Education

5 Control Windemere Lakes Association
Sturgeon Lake- Chemical treatment of EWM (42.3 acres) Sand Lake- Chemical treatment of EWM (9.35 acres) Cross Lake/ Snake River Association Cross Lake- Chemical treatment for CLP (4.04 acres) Cross Lake- Chemical treatment for EWM (3.84 acres) Pokegama Lake Association Chemical treatment for CLP (6 acres) Mechanical treatment for CLP

6 Planning AIS Risk Management Analysis Pokegama Lake vegetation survey
Cross Lake water quality testing

7 Youth 4H Aquatic Robotics AIS Team Rivers Are Alive Program
Trainings held. Monitor sites to be established. Rivers Are Alive Program East Central, Willow River PLA Freshwater Fair

8 Prevention

9 Prevention 2016 2015 1.4 Inspections/Hour 1,369.75 Inspector Hours

10 Prevention Decontamination

11 Education AIS Intern, St. Croix River Assoc. Resort Owner Outreach
Tabled at 4 local festivals Resort Owner Outreach Met w/ 4 resorts Public Workshops Hinckley, Sturgeon Lake

12 Education Billboard Towels and Key Chains
Cross Lake Curly Leaf Brochures

13 Current Resources Carryover=$140,087.09 2017 State Aid= $130,635
Available=$270,722.09

14 2017 Risk Assessment Recommendations

15 Risk Assessment Recs cntd.

16 Risk Assessment Recs cntd.

17 St. Croix River Association Plan
Action Goal/Strategy/Action Distribute educational materials to build relationships w/ water related businesses 1, 1, 7 Protect native species and habitat quality as a means of creating communities resistant and resilient to AIS 1, 2, 1 Continue ongoing relationships with local law enforcement 1, 3, 1 Encourage boaters to drain their boats and equipment 1, 4, 4 Make signs more effective at communicating AIS messaging 1, 5, 4 Continue ongoing volunteer and citizen monitoring trainings and program 2, 1, 1 Participate in statewide early detection efforts or campaigns 2, 1, 4 Use biological control methods as appropriate (purple loosestrife, EWM) 3, 3, 2 Implement ecological restoration projects to restore native species diversity and richness as well as resiliency to AIS impacts and Invasion 3, 3, 3

18 Pine County Water Plan Priority Concern #1: Water Quality Goal 6: Educate and find funding for natural shoreline projects and projects in riparian areas


Download ppt "Pine County 2017 AIS Planning"

Similar presentations


Ads by Google