Presentation is loading. Please wait.

Presentation is loading. Please wait.

Korea Navy Logistics & Future Tasks

Similar presentations


Presentation on theme: "Korea Navy Logistics & Future Tasks"— Presentation transcript:

1 Korea Navy Logistics & Future Tasks
Introduction of Korea Navy Logistics & Future Tasks 1950’s Military assistance from USN 1980’s Stand alone shipbuilding 2010’s Shipbuilding for export

2 Naval Logistics Command
Korea Navy Logistics Organizations Major Naval Logistics Forces Number Name 1 N4, HQ 2 Naval Logistics Command 3 ROKFLT Depots 4 1st FLOT Depots 5 2nd FLOT Depots 6 3rd FLOT Depots 7 3 AOE 4 5 1 2 3 6

3 Requirement Management
Korea Navy Logistics Organizations N4, Navy HQ 1 1 N4 Logistic Planning Engineering Supply Ordnance Maintenance Equipment Management Maintenance Ammunitions General Supply Requirement Management

4 Korea Navy Logistics NLC Organizations Naval Logistics Command 2
Chief of Staff Maintenance Depot Supply Depot Ammunition Depot Logistics IT Center Technical Research Logistic Management Surface ship Management Submarine & Aviation Management Contract Management Integrated Logistics Support

5 Korea Navy Logistics Organizations AOE (Choen-ji class) 7
AOE-58 Hwa-cheon AOE-59 Dae-chung General Characteristics L x B x D 136 x 17.8 x 16.5 Displacement Approx. 9,200t full load Propulsion 2 x MTU Diesel (12,800 HP) Speed 20 KTS Range 4,500 NM at 15 KTS Max. Load Capacity Fuel : 4,200t Cargo : 450t

6 Korea Navy Logistics Logistics Circumstance Evaluation
Need to prepare for stand alone logistic supportability before the transfer of wartime operational control. Logistics system in private sector is rapidly improving with IT based infrastructure. It’s going to be more difficult to secure a national defense budget. There is a lot of outside pressure to reform waste and inefficiency in defense management. Using private sector material and service is required. Because of the fast improvement of science technology weapon systems are going to be more complicate and expensive. There is a limit to support maintenance by Navy logistics capability. Issues of supranational and nonmilitary threat is consistently increasing, it is required to build an international cooperation system for logistic support and disaster aid effort.

7 Korea Navy Logistics Logistics Development Tasks Goal
Maintain optimum level in logistic capability to sustain war Tasks Innovative development of logistic management system 1 Secure operation sustainable capability in peace/wartime 2 Build an operation focused logistic support system 3 Improve TLCMS 4 Focus on logistic management efficiency 5 Build up international logistic cooperation * TLCMS : Total Life Cycle Management System

8 Korea Navy Logistics Logistics Development Tasks 1
Secure operation sustainable capability in peace/wartime Secure supplies to prepare for wartime Improve LOTS capability Develop maintenance support capability Guarantee reliability of ammunition Improve performance of weapon systems 2 Build an operation focused logistic support system Simplify logistics chain system Continuously reduce procurement lead time and customer waiting time Develop next gen. Defense logistics integrated information system

9 Korea Navy Logistics Logistics Development Tasks 3
Improve Total Life Cycle Management System Issue an accurate RAM data from field data analysis system Reflect ship design for easy maintenance Expand use of electronic technical manual which is installed in the ship sever 4 Focus on logistic management efficiency Expand use of using private sector material and service Decrease national defense standard, increase commercial supplies 5 Build up international logistic cooperation

10 Thank You Operations are to win combats, Logistics is to win the war


Download ppt "Korea Navy Logistics & Future Tasks"

Similar presentations


Ads by Google