Presentation is loading. Please wait.

Presentation is loading. Please wait.

SCHOOL RELATED SAFETY PROJECTS

Similar presentations


Presentation on theme: "SCHOOL RELATED SAFETY PROJECTS"— Presentation transcript:

1 SCHOOL RELATED SAFETY PROJECTS
Hillsborough County SCHOOL RELATED SAFETY PROJECTS SCHOOL SAFETY IMPROVEMENTS — $13.3 MILLION (24 PROJECTS) To relieve congestion, improve traffic circulation, and improve safety. Improvements around schools such as paved shoulders, lighting, and enhanced crosswalks. Issues identified with Hillsborough County Public Schools, Law Enforcement, and Public Service Requests. SIDEWALKS ‐ NEAR SCHOOLS — $3.4 MILLION (13 PROJECTS) To improve safety for students walking to and from school. Build sidewalks near schools—identified in partnership with Hillsborough County Public Schools. SIDEWALKS ‐ NEW/GAPS — VARIOUS LOCATIONS ($15 MILLION) To enhance pedestrian safety and mobility by building sidewalks and signage and pavement markings.

2 SCHOOL SAFETY IMPROVEMENTS — $13.3 MILLION (24 PROJECTS)
SAFETY PROJECTS Hillsborough County Transportation Projects SCHOOL SAFETY IMPROVEMENTS — $13.3 MILLION (24 PROJECTS) Improvements around schools, such as paved shoulders, additional lighting and enhanced crosswalks, to relieve congestion, improve traffic circulation and improve safety for students. Location Proposed Scope* Planning Area Estimated Cost Bellamy Elementary School Wilsky Rd (SB 8 foot paved shoulder leading into School ‐ 450') Town And Country $0.5 Brooker Elementary School Dewolf Road (NB 8 foot paved shoulder leading into School ‐ 330') ‐ Bama Road (WB 8 foot paved shoulder leading onto Dewolf Rd ‐ 660') Brandon $0.8 Burns Middle School Bryan Brooker Rd (NB 8 ft paved shoulder leading onto Brooker Rd's Rt‐Turn Lane into school‐ 435') $0.4 Cannella Elementary School Nixon Road (NB 8 foot paved shoulder leading into School ‐ 730') Greater Carrollwood Northdale Collins Elem. School Panther Trace Blvd (WB Right‐turn Lane at 500') & Summerfield Blvd (NB Right‐turn Lane at 700') Riverview $1.0 Colson Elementary School Gerard Drive (WB 8 foot paved shoulder leading into School ‐ 485’ ) Seffner Mango Cork Elementary School Cork Rd (SB 8 foot paved shoulder leading into School ‐ 515') East Rural Cypress Creek Elementary School 19th Avenue N.E. Ruskin (WB 8 foot paved shoulder leading into School ‐ 335') Sun City Center $0.3 Dickenson Elementary School Kelly Road: W. Osborne Ave to W. Louisiana Ave (SB 8 foot paved shoulder leading into School ‐ 235') $0.2 Doby Elementary School Covington Garden Drive (SB 8 foot paved shoulder leading into School ‐ 1100') Apollo Beach Jennings Middle School Williams Rd (NB 8 foot paved shoulder leading into School ‐ 575') Thonotosassa 10/13/2016 *Proposed Scope is conceptual and subject to Preliminary Design & Engineering (PD&E)

3 Hillsborough County Transportation Projects
SAFETY PROJECTS Hillsborough County Transportation Projects Leto High School Sligh Ave (WB 8 foot paved shoulder leading into School ‐ 285') Town And Country $0.2 Mary Bryant Elem/Farnell Mid Schools Nine Eagles Dr. (SB 12 foot Lane ‐ 300') Northwest Hillsborough $0.5 Palm River Elementary School Maydell Rd (SB 8 foot paved shoulder extending leading into School ‐ 200') Greater Palm River Pierce Middle School Hesperides St (NB 8 foot paved shoulder extending leading into School ‐ 370') $0.3 Riverview Elementary School Hannaway Dr (EB 8 foot paved shoulder leading into School ‐ 425') Riverview $0.4 Robinson Elementary School Turkey Creek Rd (SB 8 foot paved shoulder leading into School ‐ 900') East Rural $0.8 Seffner Elementary School On Campus Parent Pick‐up Loop Extend: EB 200', NB 80', WB 900' Seffner Mango Spoto High School Raised Median w N/S Crosswalk $0.1 Springhead Elementary School Nesmith Rd (NB 8 foot paved shoulder leading into School ‐ 600' and address Sidewalk Gaps) $0.6 Strawberry Crest High School Internal roadway to get High School students to the east side of Strawberry Crest's parking Lot $0.9 Intersection Improvement (Impacts US Hwy 92 (E/WB) and also Gallagher Rd (NB movements)) Walden Lakes Elementary School Turkey Creek Rd (NB 8 foot paved shoulder leading into School ‐ 700') Plant City Walker Mid./Hammond Elem. Schools North Mobley Rd (EB Right‐turn‐ 700') Keystone Odessa $1.0 10/13/2016 *Proposed Scope is conceptual and subject to Preliminary Design & Engineering (PD&E)

4 SIDEWALKS ‐ NEAR SCHOOLS — $3.4 MILLION (13 PROJECTS)
SAFETY PROJECTS Hillsborough County Transportation Projects SIDEWALKS ‐ NEAR SCHOOLS — $3.4 MILLION (13 PROJECTS) Construction of sidewalks near schools, identified in partnership with Hillsborough County Public Schools, to improve safety for students walking to and from school. Location Proposed Scope* Planning Area Estimated Cost Alexander Elementary School Henry Ave: N Grady Ave‐to‐N Church Ave Egypt Lake $0.1 Clair Mel Elementary School E Claire Circle: 78th St‐to‐Eastern terminus Greater Palm River Folsom Elementary School Tom Folsom Rd: Harney Rd‐to‐475ft N of Rey Linda Ave Tom Folsom Rd: 230ft S of Rey Linda Ave‐to‐Joe Edert Rd Thonotosassa $0.4 King High School Sigh Ave: 220ft E of eastern entrance of Peoples Community Center‐to 1,500ft W of Harney Rd East Lake Orient Park Lutz Elementary School 2nd Ave: US 41‐to‐4th St SE 3rd Ave SE: 2nd St SE‐to‐3rd St SE 3rd St SE: 3rd Ave SE‐to‐2nd Ave SE Lutz $0.2 Nelson Elementary Durant Rd: East of Red Fern Dr Durant Rd: West of Red Fern Dr Valrico Reddick Elementary School Vel St: Westlake Dr‐to‐12th St Edna St: West Lake Dr‐to‐12th St Wimauma $0.3 Riverview Elementary School Lineside Dr: Riverview Dr‐to‐Southern terminus Riverview Dr: Lineside Dr‐to‐Hancock St (south side) Hancock: Riverview Dr‐to‐Southern terminus Riverview Rodgers Middle School Sidewalk or trail through County Park from Shadow Run: Back of school‐to‐Shadow Run Seffner Elementary School Hollow Tree Dr: Seffner Valrico Rd‐to‐Cactus Rd Cason Court: Hallow Free Dr‐to‐Northern terminus Seffner Mango Springhead Elementary School Nesmith Rd: Sparkman Rd‐to‐Trapnell Rd Nesmith Estate Ln: Nesmith Rd‐to‐Western terminus Sparkman Rd: Eastridge subdivision‐to‐Springhead Elementary East Rural 10/13/2016 *Proposed Scope is conceptual and subject to Preliminary Design & Engineering (PD&E)

5 Camp St: 7th St‐to‐Railroad St
SAFETY PROJECTS Hillsborough County Transportation Projects Wimauma Elementary School Camp St: 7th St‐to‐Railroad St Hickman St: 7th St‐to‐Railroad St Hillsborough St: 345ft E of 7th St‐to‐4th St 4th St: Hillsborough St‐to‐Hickman St Wimauma $0.4 Future locations to be determined in coordination between Hillsborough County and the Hillsborough County School Board TBD Various $0.9 10/13/2016 *Proposed Scope is conceptual and subject to Preliminary Design & Engineering (PD&E)

6 School Contiguous Improvements Locations - Planning Program
19) Walker Mid./Hammond Elem. Schools North Mobley Rd (EB Right-turn- 700') Posted Speed Limit: 35 MPH Looking East LEGEND Eastbound 8' Paved Shouolder (1170’) = Proposed Improvement Remove Old Sidewalk Cost Relocation of Sidewalk on eastside of roadway 1170' 94,656 Install 8 ft wide Eastbound Paved Shoulder 1170' $1,188,269 Total Linear Feet = 1170' $1,188,269 page: 24

7 School Contiguous Improvements Locations - Planning Program
20) Mary Bryant Elem/Farnell Mid Schools Nine Eagles Dr. (SB 12 foot Lane - 300') Looking North Posted Speed Limit: 35 MPH Nine Eagles Dr LEGEND Eastbound 8' Paved Shouolder (300’) = Proposed Improvement Install 8 ft wide Southbound Paved Shoulder 300' $451,621 Total Linear Feet = 300' $451,621 page: 25

8 School Contiguous Improvements Locations - Planning Program
23) Collins Elem. School Panther Trace Blvd (WB Right-turn Lane at 500') & Summerfield Blvd (NB Right-turn Lane at 700') To include Removal and the Reinstallation Of Sidewalks Posted Speed Limit: 25 MPH Looking North Summerfield Blvd Looking West Panther Trace Blvd LEGEND WB and NB Right-turn Lanes = Proposed Improvement Posted Speed Limit: 35 MPH Remove Old Sidewalk Cost Relocation of Sidewalk on eastside of roadway 97,083 Panther Trace Blvd (WB Right-turn Lane at 500') & Summerfield Blvd (NB Right-turn Lane at 700') $1,218,738 Total = $1,315,821 page: 28


Download ppt "SCHOOL RELATED SAFETY PROJECTS"

Similar presentations


Ads by Google