Presentation is loading. Please wait.

Presentation is loading. Please wait.

Current Status and Future Plan (October 2012)

Similar presentations


Presentation on theme: "Current Status and Future Plan (October 2012)"— Presentation transcript:

1 Current Status and Future Plan (October 2012)
GISC Melbourne Current Status and Future Plan (October 2012)

2 OpenWIS Operational Implementation in BoM
WIS Implementation History BoM WIS Operational deployment - General architecture diagrams, - Servers setup - Hardware, - Server fail over suggestion SIMS - Metadata Management Operation Plan

3 WIS Implementation History
OpenWIS Operational Implementation in BoM WIS Implementation History 2006 – 2008 : Participating SIMDAT. 2008: Commitment to become GISC. 2010: Joining OpenWIS Consortium. 2011: WMO WIS JumpStart. Approval of WIS (OpenWIS) Implementation Project. 2012: January: OpenWIS installation workshop May: OpenWIS installation/integration June: GISC audit Fully designation as GISC by WMO EC64 in June

4 OpenWIS Operational Installation in BoM
global data meta WIS Harnesses global data outbound to users Internal System Data Sources (RTDB, ADAM) CMSS Disse- mination (AIFS) OpenWIS Authenti-cation Authori-zation User Store PORTAL Access / Follow Requests Discover Browse Catalogue Admin & Monitoring Request Processing Replication Collection 24 hour Cache DATA SERVICE Adminis-tration Monitoring ADMINISTRATION METADATA SERVICE Catalogue Access Synchro-nization Harvesting DAR Catalogue SECURITY SERVICE

5 OpenWIS Operational Installation in BoM

6 OpenWIS Operational Installation in BoM

7 OpenWIS Operational Installation in BoM
RMDCN + Other GTS links Servers setup Internet DataBase / Solr wisdb RMDCN User Portal wisrmdp Internet User Portal wisupt SAN Data Services wisdata (Stageingpost) Cache: 850G Stagingpost: 1T DB: 100G Solr Index: 120G Internet Zone Admin Portal wisadmn OpenAM/OpenDS wissec SSO Zone Cache Replication: wisrepl Harnesses wishrns DMZ CMSS AIFS ADAM Other local data sources Internal Zone

8 OpenWIS Operational Installation in BoM
Fail-over VM Cluster (IBM x3650) – VMWare HA VMotion VMotion wisupt wisrmdp wisadmn wisdb wissec wisdata wisrepl wishrns

9 OpenWIS Operational Installation in BoM
Storage Backup SAN Commvault Cache: 850G Stagingpost: 1T DB: 100G Solr Index: 120G

10 OpenWIS Operational Installation in BoM
Fail Over Suggestions with SDC RMDCN + Other GTS links Internet DataBase / Solr wisdb Active/Pasive (HB+DRBD) RMDCN User Portal wisp Active/Active (Apache LB) Internet User Portal wisp Active/Active (Apache LB) SAN Data Services wisdat (Stageingpost) Active/Active (Apache LB?) Cache: 850G Stagingpost: 1T DB: 100G Solr Index: 120G Internet Zone Admin Portal wisad Active/Pasive(HB+DRBD) OpenAM/OpenDS wissec Active/Active (Apache LB) SSO Zone Cache Replication: Vuze wisrep Active/Active(JBoss?) Harnesses wishrn Active/Pasive(HB+DRBD) HB= DMZ CMSS AIFS ADAM Other local data sources Internal Zone

11 Services Information Management System (SIMS)
Description Ownership Source Type (Warning, Model….) Access Information Delivery Mechanisms Frequency Output Formats Products Clients Subscriptions Web Content Statistics

12 Services Information Management System (SIMS)
Product Meta Data

13 Services Information Management System (SIMS)
NEIC Extensions (wip) ISO 19115 Abstract Purpose Geography Lineage Keywords Data Location Topic Temporal Details Size Fees Contact Details

14 Plan for future Operation
OpenWIS Operational Installation in BoM Plan for future Operation Harness development ( , FTP etc?) Integration with exiting operational environment Metadata management Data and Services policy provision Internal DCPCs GISC Melbourne Target Operational date: March 2013.

15 Thank you… Weiqing Qu Ph: (03)


Download ppt "Current Status and Future Plan (October 2012)"

Similar presentations


Ads by Google