Presentation is loading. Please wait.

Presentation is loading. Please wait.

Chae-Sub LEE TTA Chae-sub.lee@ties.itu.int Summary Report of 6th FG NGN Chae-Sub LEE TTA Chae-sub.lee@ties.itu.int.

Similar presentations


Presentation on theme: "Chae-Sub LEE TTA Chae-sub.lee@ties.itu.int Summary Report of 6th FG NGN Chae-Sub LEE TTA Chae-sub.lee@ties.itu.int."— Presentation transcript:

1 Chae-Sub LEE TTA Chae-sub.lee@ties.itu.int
Summary Report of 6th FG NGN Chae-Sub LEE TTA

2 Table of Contents Deliverables from FGNGN Release Plan from FG NGN
Contribution Status from CJK

3 Deliverables from FG NGN
(1) Release Independent Deliverables WG Deliverable Title Current Draft Target Date Cat. Stat Target SG* 1 NGN release-independent requirements (none) 4Q05 0/1/1 P 13 NGN general services and capabilities (release independent) D 2 Customer Manageable IP Network FGNGN-OD-00149 2Q05 0/2/1 S 3 General aspects of QoS and network performance in NGN (TR-NGN.QoS) FGNGN-OD-00129 3Q05 13/12 Network performance of non-homogeneous networks in NGN (TR-NGN.NHNperf.). FGNGN-OD-00130

4 Deliverables from FG NGN
(2) Release 1 Deliverables WG Deliverable Title Current Draft Target Date Cat. Stat Target SG* 1 NGN Release 1 Scope FGNGN-OD-00141 2Q05 1/1/1 S 13 NGN Release 1 requirements FGNGN-OD-00142 3Q05 D 2 Requirements & Architecture for NGN (FRA) FGNGN-OD-00146 1/2/1 Functional Requirements for NGN Mobility (FRMOB) FGNGN-OD-00147 13 /19 IMS for Next Generation Networks (IFN) FGNGN-OD-00148 3 A QoS control architecture for Ethernet-based IP access networks (TR-123.qos) Approved Mar. 05 A Multi Service Provider NNI for IP QoS (TR-msnniqos) FGNGN-OD-00107

5 Deliverables from FG NGN
(2) Release 1 Deliverables WG Deliverable Title Current Draft Target Date Cat. Stat Target SG* 3 Requirements and framework for end-to-end QoS in NGN (TR-e2eqos.1) FGNGN-OD-00127 4Q05 1/2/1 D 13 A QoS architecture for Ethernet networks (TR-enet) FGNGN-OD-00131 1/2/2 Resource and admission control functions(TR-racf) FGNGN-OD-00128 3Q05 A QoS Framework for IP-based access networks (TR-ipaqos) FGNGN-OD-00113 Performance measurement and management for NGN (TR-pmm) FGNGN-OD-00126 12 Algorithms for Achieving End to End Performance Objectives (TR-apo) FGNGN-OD-00135 4 Signalling requirements for IP QoS TRQ.IP QoS.SIG.CS1 Q Series Supplement 51 Dec. 2004 A 11 5 Security Requirements for R1 FGNGN-OD-00132 1Q05 S 17 6 Evolution of Networks to NGN FGNGN-OD-00138 PSTN/ISDN evolution to NGN FGNGN-OD-00139 PSTN/ISDN emulation and simulation FGNGN-OD-00140

6 Deliverables from FG NGN
(3) Beyond Release 1 Deliverables WG Deliverable Title Current Draft Target Date Cat. Stat Target SG* 2 Functional Requirement for Soft Router FGNGN-OD-00145 TBD 2/2/1 D 13 Digital Multimedia Broadcast FGNGN-OD-00144 P Converged Services Framework FGNGN-OD-00150 5 Guidelines for NGN Security FGNGN-OD-00133 2Q 05 17 7 Problem Statement FGNGN-OD-00158 Apr. 2005 2/1/1 A Requirements FGNGN-OD-00153 3Q05 S High Level Architecture FGNGN-OD-00154 4Q05 Candidate Technologies

7 Releases Plan from FG NGN
Services Release plan between FGNGN and SG13 Network Capabilities Architecture Scope of FGNGN QoS and Control Security Scope of SG13 as NGN Lead Group Migration Transport FGNGN R1 Management ITU-T R1 Scope of Other SGs Protocol FGNGN R2 Terminals ITU-T R2 Provisioning (NNAR, Charging etc.)

8 Releases Plan from FG NGN
FGNGN Release 1 Coverage

9 Releases Plan from FG NGN
FGNGN Release 1 Scope and Services Service Types PSTN/ISDN Emulation services PSTN/ISDN Simulation services Multimedia services Internet access Other services (data services etc.) Public service aspects (LI, ETS/TDR, etc.) Service Capabilities Basic network capabilities Service support capabilities Open Service Environment Service Enablers PSTN/ISDN Emulation support Public service support capabilities

10 Releases Plan from FG NGN
FGNGN Release Processing Plan Specification Stage Complete 3 Specification Stage Incomplete Release 1 Phase 3 depth width time 2 2 1 I Release 2 Phase Rec. I.130 I II II III 1 Specification Stage Complete III NGN Functional Capability Set Specification Stage Incomplete (IMS) NGN Functional Capability Set

11 Contribution Status from CJK
Analysis of Participants on FGNGN CJK Others Total 1st 33 75 108 2nd 19 47 66 3rd 54 67 121 4th 60 63 123 5th 117 62 199 6th 78 144 283 334 617

12 Contribution Status from CJK
Analysis of Input Documents CJK North America Europe Others 1st 2 12 23 2nd 8 22 3 33 3rd 60 48 11 4th 46 47 21 5th 73 29 24 6th 63 25 Total 179 177 38 124


Download ppt "Chae-Sub LEE TTA Chae-sub.lee@ties.itu.int Summary Report of 6th FG NGN Chae-Sub LEE TTA Chae-sub.lee@ties.itu.int."

Similar presentations


Ads by Google